In short. An emission control retrofit cleans the exhaust of the existing engine. Dual fuel changes part of the fuel. Replacement brings a new engine built to current rules. The choice depends on what the rules require for that set and place, the engine’s condition, the running hours and load, gas access, and total cost over the set’s remaining life. Low-hour standby sets and high-hour prime sets usually end up on different routes.
Who this page is for: For owners and facility managers choosing between retrofit, dual fuel and replacement for an existing diesel generator.
Key facts
- Retrofit suits a sound engine whose exhaust runs hot enough.
- Dual fuel pays only with long hours and reliable gas.
- Replacement suits worn, very old or heavily used sets.
- Compare total cost over the remaining life, not first cost.
- Confirm the current rules for the set’s location and size.
- Different sets on one site may need different routes.
The three routes compared
| Item | Retrofit device | Dual fuel | Replacement |
|---|---|---|---|
| Main effect | Cleaner exhaust | Less diesel used | New engine |
| Best for | Sound engine, regular running | Long hours, gas available | Old or worn sets |
| Main limit | Temperature and back-pressure | Gas supply and safety | Capital cost and downtime |
| Ongoing work | Filter care and records | Gas system upkeep | Normal servicing |
Worked example: four sets, four answers (illustrative)
| Set | Situation | Route |
|---|---|---|
| School, 15 years old | 80 hours a year, engine sound | Retrofit or restricted use, subject to local rules |
| Factory, 7 years old | 4000 hours a year at steady load; pipeline gas | Dual fuel, with emissions measured after conversion |
| Hotel, 8 years old | 600 hours a year; no gas | Retrofit device with load-bank runs |
| Warehouse, 20 years old | High oil use; 1500 hours a year | Replace |
The decision tool above gives a first screen from five questions. See retrofit selection, dual-fuel assessment and replacement decisions.
Do not choose a route on first cost alone. Over five years, fuel, maintenance and downtime often decide which route is cheaper.
Five-year comparison sheet
| Cost element | Retrofit | Dual fuel | Replace |
|---|---|---|---|
| Equipment and installation | |||
| Fuel over five years | |||
| Maintenance over five years | |||
| Downtime during the work |
What each route actually changes
The three routes act on different parts of the problem. A retrofit emission control device, usually called an RECD, treats the exhaust after it leaves the engine, so the engine itself is unchanged and its fuel use is unchanged. Dual fuel changes what is burnt in the cylinders, replacing part of the diesel with gas, which reduces diesel use and particulate emissions but can raise carbon monoxide and unburnt methane. Replacement removes the old engine altogether and brings one type-approved to the current norms for new sets, together with a new controller and usually a new acoustic enclosure.
Because each route acts differently, the question to answer first is which obligation the set must meet, at that place, for that rating and age. A route that reduces diesel use is not automatically a route to compliance, and a compliant device on a worn engine is not a long-term answer.
When an RECD is a realistic candidate
An RECD may be a candidate when its current type approval covers the engine family and rating of the set, the installation can meet the approved conditions, and the set can operate within the exhaust and maintenance limits the device requires. In practice that means checking:
- Approval scope: the certificate names the engine families and ratings the device is approved for; the set must fall within them.
- Exhaust temperature: many filter-based devices need the exhaust hot enough, for long enough, to burn off collected soot. A standby set that runs lightly for a few minutes a month may never reach it.
- Back-pressure: the device adds resistance to the exhaust; the total must stay within the engine maker limit, measured on load after installation.
- Engine health: high oil consumption, poor injection or heavy smoke load the device with soot and oil ash and shorten its life. The engine is repaired first.
- Space and support: the device and its pipework need space, support and access for cleaning, often on a canopy roof or a frame beside the set.
After installation, performance is verified with the evidence the applicable procedure prescribes before compliance is claimed. The local direction for the area is confirmed at the start and again before handover, because directions change.
When dual fuel makes sense
Dual fuel needs reliable gas at the pressure and flow the conversion requires, and long running hours at moderate to high load, because substitution is low at light load. A standby set that runs a few dozen hours a year rarely repays a conversion. A prime-power set running thousands of hours on pipeline gas may. The conversion kit must be approved for the engine model, emissions are measured in each load band after conversion, and the fallback to diesel on gas loss is tested on load. The saving is planned in litres from measured load bands, not from a headline substitution figure.
When replacement is the better answer
Replacement usually wins when the engine is worn, parts are hard to obtain, the set is the wrong size for today, or several upgrades would be needed at once: an RECD, a new controller, a new canopy and an overhaul. A new set type-approved to the current norms for new sets meets those norms without a retrofit, and its fuel efficiency and controls bring their own savings. Replacement also allows the rating to be corrected, which is common after years of load growth or after a plant has shrunk. The cost of downtime during the change is planned, often with a rental set to cover it.
Decision matrix by duty
| Duty and condition | Usually considered first | Check before deciding |
|---|---|---|
| Standby, low hours, sound engine | RECD or restricted operation, as local rules allow | Exhaust temperature during test runs; approval scope |
| Standby, low hours, worn engine | Replacement | Rating for today, downtime plan |
| Prime, long hours, pipeline gas | Dual fuel | Gas supply, kit approval, emissions after conversion |
| Prime, long hours, no gas, sound engine | RECD | Back-pressure, maintenance capacity for the device |
| Any duty, several upgrades needed at once | Replacement | Total cost over the remaining life |
Building the five-year comparison
The comparison sheet is filled in with the same assumptions for every route: the same running hours, the same load profile and the same period. For each route it lists the equipment and installation, the fuel used over five years in litres and gas volume, the maintenance of the engine and of any added equipment, the downtime during the work and its cost to the site, and the residual value or remaining life at the end.
A route that looks cheapest on equipment cost alone often loses once five years of fuel, device maintenance and downtime are added, and the opposite also happens: replacement can look expensive until the fuel saving and the avoided overhaul are counted.
Evidence to keep
- The set data plate, engine serial number and the engine family it belongs to.
- For an RECD, the type-approval certificate covering that engine family and rating, the installation record and the post-installation test results.
- For dual fuel, the kit approval, the conversion settings, the load-band test results and the emissions measurements.
- For replacement, the type-approval documents of the new set and the disposal record of the old one.
- The written local direction that applied when the decision was made.
Restricted operation as a route
For some standby sets the practical answer is neither a device nor a new engine, but running only within the hours or conditions the local direction permits, for example during genuine grid outages and limited testing. Where that is allowed, the operating rules are written down, the hour meter and run log are kept, and the test runs are planned to keep the engine healthy within the permitted time. This route depends entirely on the current direction for the area, so it is reviewed whenever the direction changes.
Logging before committing
Before an RECD is ordered, a few weeks of logging on the set answers most of the suitability questions. Exhaust temperature downstream of the turbocharger, engine load, running time per start and the number of starts show whether the set ever runs hot enough and long enough for the device to clean itself. Exhaust back-pressure measured at full load shows how much margin is left for the device. Where the log shows short, light runs, the device needs a regeneration strategy, such as a planned load-bank run, or the set is better suited to another route.
Combining routes
Routes can sometimes be combined, for example a dual-fuel conversion together with an exhaust device, where both are approved for the engine and the combined back-pressure, temperatures and controls work together. Combinations add complexity and need the agreement of each supplier and, where approvals are involved, evidence that the combination is covered. On a multi-set site it is often simpler to give different sets different routes: replace the oldest set, convert the long-running prime set, and fit a device to a sound standby set.
A practical sequence for a multi-set site
- List every set with rating, age, engine family, running hours, duty and location.
- Confirm in writing the current local direction that applies to each set.
- Survey engine condition: oil consumption, blow-by, smoke, compression where needed, and a load-bank test.
- Log exhaust temperature and back-pressure on the sets being considered for a device.
- Check gas availability, pressure and flow where dual fuel is considered.
- Fill in the five-year comparison for each set on the same assumptions.
- Decide per set, record the reasons and the evidence, and plan the work to keep enough capacity on site throughout.
Throughout the sequence, a set that is out of service for work is covered by another set on site or by a rental set, so the change of route never leaves the site without standby power.
Common mistakes
- First cost only.
- Same route for every set.
- Rules not confirmed.
- Engine condition not checked.
What to send us
Send set ratings, ages, hours, location and gas access. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. The example is illustrative.
Questions engineers ask
Does a type-approved RECD guarantee that my set complies?
No. Type approval covers specified engine families and ratings under stated installation conditions. The device must be approved for the engine family and rating of your set, installed as approved, and the set must run within the exhaust and maintenance limits, with performance verified after installation before compliance is claimed.
Why can an RECD struggle on a lightly used standby set?
Many filter-based devices need the exhaust hot enough, for long enough, to burn off the soot they collect. A standby set that runs lightly for a few minutes at a time may never reach that temperature, so the filter loads up. Logging exhaust temperature first shows whether planned load-bank runs are needed.
Which is cheapest?
It depends on the duty, the engine condition and the remaining life. Compare all three routes over the same five years with the same running hours: equipment and installation, fuel in litres and gas volume, maintenance of the engine and any added equipment, downtime during the work, and the value left at the end. First cost alone often points the wrong way.
Can I combine options?
Sometimes, for example dual fuel with an exhaust device, where both are approved for the engine and the combined back-pressure, temperatures and controls work together. Combinations need the agreement of each supplier and evidence that approvals cover them. On a site with several sets it is often simpler to choose a different route for each set.
What if rules change?
Choose a route that leaves room to adapt, record the direction that applied when the decision was made, and review it whenever the rules change. Replacement with a set type-approved to the current norms gives the longest horizon; restricted operation depends most on future directions; device and conversion approvals should cover the full period of use.
Who decides compliance?
The authority responsible for the area and the type of source, under the applicable rules and directions. Suppliers provide type-approval certificates and test evidence, and the owner keeps the installation records and post-installation results, but only the authority can accept that a particular installation complies. Confirm what evidence it expects before work starts.
General guidance only. Confirm regulations.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.