In short. Gas substitution in a dual-fuel set is not one number. It is low or zero at light load, rises through the middle range, and peaks at high load within knock limits. The figure that matters is the weighted substitution over the set’s real load profile, which is usually well below the headline value. Fallback to diesel and load-step behaviour must also be tested before the set is relied on.
Who this page is for: For owners and engineers estimating real diesel savings from a dual-fuel set and checking its performance.
Key facts
- Substitution rises with load and falls at light load.
- Use a measured load histogram, not the nameplate rating.
- Weight each load band by the fuel actually used in it.
- Hours at light load drag the weighted figure down sharply.
- Load-step response may change; test it.
- Test fallback to diesel on load.
Worked example: weighted substitution on a 500 kVA set, 400 kW at 0.8 power factor (illustrative)
| Load band | Hours a year | Energy (kW × hours) | Substitution in band |
|---|---|---|---|
| Light, about 20% (80 kW) | 1200 | 96,000 kWh | 5% |
| Medium, about 45% (180 kW) | 1050 | 189,000 kWh | 35% |
| High, about 75% (300 kW) | 750 | 225,000 kWh | 60% |
| Weighted over the year | 3000 | 510,000 kWh | about 40% |
The supplier’s headline of 60% applied only to the high band. Planning on the weighted 40% gave a realistic saving. The weighting here uses energy as a stand-in for diesel use; a measured fuel figure for each band is better. See dual-fuel overview and assessment.
Do not plan savings from a single substitution figure. Light-load hours can cut the real result by a third or more.
Performance checks
| Check | Why |
|---|---|
| Load-step frequency dip | May be deeper than on diesel. See generator load steps |
| Fallback on gas loss at load | Power must stay within limits during the change |
| Exhaust temperature | Differs from diesel-only running |
| Output in hot weather | Derating may be needed |
| Carbon monoxide and unburnt methane | Can rise on dual fuel; measure them |
Load histogram sheet
| Load band | Hours a year | Average kW | Expected substitution |
|---|---|---|---|
| Below 30% | |||
| 30–60% | |||
| Above 60% |
How the weighted figure is calculated
The weighted substitution in the example is the energy in each band multiplied by the substitution in that band, added up and divided by the total energy: (96000 × 0.05 + 189000 × 0.35 + 225000 × 0.60) ÷ 510000, which is 205950 ÷ 510000, or about 40%. The light band holds nearly a fifth of the energy but contributes almost nothing, which is why light-load hours pull the figure down so hard.
Energy is used here as a stand-in for diesel consumption because it is easy to obtain from a load record. It is not exact: specific fuel consumption is higher at light load, so each kilowatt-hour in the light band costs more diesel than one in the high band. For a firm saving the bands are weighted by measured diesel use, which gives a lower weighted substitution than the energy proxy when the light band is large.
Measuring substitution on site
Substitution is the share of diesel energy replaced by gas, and it is measured, not taken from a brochure. The method compares diesel use with and without gas at the same load:
- Run the set on diesel only at a steady load in each band, and measure diesel flow in litres per hour with a calibrated flow meter or a weighed day tank.
- Run at the same load in dual-fuel mode, and measure both the diesel flow and the gas flow, with gas corrected to standard conditions.
- Substitution in that band is the reduction in diesel flow divided by the diesel-only flow.
- Check the energy balance: the gas energy supplied, from the gas flow and its heating value, should roughly equal the diesel energy removed, allowing for any change in efficiency.
Each band is held long enough for temperatures and flows to settle, typically at least 15 to 30 minutes, and the ambient temperature and gas pressure are recorded with each reading. A load bank gives steady bands that site load rarely provides.
Example test record (illustrative)
| Load | Diesel only, L/h | Dual fuel, diesel L/h | Substitution |
|---|---|---|---|
| 80 kW | 24 | 23 | about 4% |
| 180 kW | 47 | 31 | about 34% |
| 300 kW | 75 | 30 | 60% |
The measured bands agree closely with the planning assumptions in the worked example, which is the outcome the test is meant to confirm. Where they do not, the weighted saving is recalculated before any commercial decision is made.
Why substitution is limited at each end of the load range
At light load the cylinder is lean in gas and cool, and the small pilot of diesel cannot ignite the thin mixture reliably. Unburnt gas leaves through the exhaust, so the control system holds substitution low or switches to diesel only. At high load the limit is knock: the gas and air mixture can ignite ahead of the flame, and the controller reduces gas to protect the engine. Exhaust temperature limits, gas quality and intake air temperature narrow the window further on a hot afternoon, which is why the highest substitution figures are usually quoted at moderate ambient conditions.
Emissions acceptance after conversion
Dual-fuel operation changes the exhaust. Particulate emissions usually fall as diesel is replaced, but carbon monoxide and unburnt methane can rise, especially at light load. The converted set is therefore tested in each load band for the pollutants named in the applicable emission norms, plus methane where it is measured, and the results are compared with the limits that apply to the set and its conversion. Measurement follows the method prescribed for that set, with the instrument, its calibration and the load recorded with each reading. A set that passed on diesel is not assumed to pass on dual fuel.
Load steps and transient response
Gas in the intake makes the engine respond differently to a sudden load. Many systems reduce or stop gas when a large step arrives and restore it once the engine settles, which keeps the dip close to the diesel figure but costs some substitution on a site with frequent steps. The test sequence applies the largest expected step in dual-fuel mode and records the frequency dip and recovery time, then repeats it in diesel-only mode for comparison. If the dual-fuel dip exceeds what the load can tolerate, the step is split or the gas reduction setting is changed.
Testing fallback to diesel
Loss of gas at full load is the fallback case that matters. The test closes the gas supply at the highest load band and records the frequency and voltage during the change to diesel only, the time taken and whether the set carried the full load throughout. The event log should record the cause, the time and the gas pressure at the moment of change. The test is repeated yearly so that a slow valve or a changed setting is found before a real gas failure.
Turning substitution into litres saved
The saving is planned in litres, not in percent. With the measured diesel-only flows above, the set in the example would use about 24 × 1200 + 47 × 1050 + 75 × 750, or about 134400 litres a year on diesel alone. On dual fuel the same hours use about 23 × 1200 + 31 × 1050 + 30 × 750, or about 82650 litres, a saving of about 51750 litres, which is close to 39%. Against this saving stand the gas consumed, the conversion and its upkeep, and any change in maintenance cost, all compared over the same year of running.
Gas supply for a dual-fuel set
The gas supply must hold its pressure at the highest gas flow, which occurs in the high load band, and during a load step when the controller briefly increases fuel. The regulator, pipework and meter are sized for that flow, with the pressure at the engine inlet checked on load during commissioning. Gas quality matters too: a lower methane number reduces the knock margin and therefore the substitution at high load, so the gas composition is part of the design data. Where gas comes from cylinders or a cascade rather than a pipeline, the store must deliver the flow at its lowest working pressure, not only when full.
Engine suitability and warranty
Not every diesel engine is a good candidate. Compression ratio, piston design, turbocharger matching and the condition of the engine all affect how much gas it can take before knock or overheating limits apply. A conversion kit approved for the specific engine model, with documented settings and limits, is the starting point, and the effect on the engine warranty is settled in writing before conversion. An engine with high oil consumption, worn injectors or poor compression is repaired first, because those faults distort both the substitution figures and the emissions results.
Questions to settle with the conversion supplier
- Is the kit approved for this exact engine model, and what are the stated limits on substitution, exhaust temperature and knock?
- What substitution does the supplier expect in each load band, at what gas quality and intake temperature?
- How does the system respond to a large load step and to loss of gas at full load?
- Which emissions are measured after conversion, by which method, and against which limits?
- What is the effect on the engine warranty, and who maintains the gas train and controls?
- How will the saving be measured, in litres, over the first months of operation?
Answers in writing to each of these questions make the commercial comparison fair, because two proposals quoting the same headline substitution can differ greatly once the load bands, the test method and the limits are stated.
Reviewing performance after the first year
After a year of operation the diesel bought, the gas consumed and the hours in each load band are compared with the plan. A shortfall usually comes from more light-load hours than expected, a lower gas pressure at high load, or a controller that holds back gas more often than it should. The yearly load-band test repeats the commissioning measurements, so a fall in substitution in one band points to the cause directly.
Common mistakes
- Headline substitution used for the whole year.
- Load histogram guessed.
- Fallback not tested on load.
- Emissions not measured after conversion.
What to send us
Send a load record or hour meter and fuel logs. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. Values are illustrative.
Questions engineers ask
How is gas substitution measured on site?
Run the set at a steady load on diesel only and measure the diesel flow, then run at the same load in dual-fuel mode and measure diesel and gas flow. Substitution in that band is the fall in diesel flow divided by the diesel-only flow. Repeat for each load band, ideally on a load bank.
Why is the litre saving lower than the energy-weighted substitution?
Put simply, this happens because the engine uses more diesel per kilowatt-hour at light load, where substitution is lowest. Weighting by energy gives those hours too little influence. In the example on this page the energy-weighted figure is about 40% and the litre saving is close to 39%.
Is 90% replacement realistic?
Only at suitable load, with good gas quality and moderate intake temperature, and usually only in a narrow band near full load. Across a real year of running, light-load hours and hot afternoons pull the average far lower. Plan on the weighted figure from a measured load histogram and confirm it by testing each load band.
Does load step response change?
It can. Gas in the intake changes how quickly the engine responds to a sudden load, and many systems cut back gas during a large step and restore it afterwards. Test the largest expected step in dual-fuel mode and in diesel-only mode, and compare the frequency dip and recovery time with what the load can tolerate.
What about low-load running?
Expect little gas use. At light load the gas and air mixture is too lean for the small diesel pilot to ignite reliably, so the controller holds substitution low or runs on diesel only. Hours at light load therefore add almost nothing to the saving and pull the weighted substitution down sharply.
Do I need a load bank test?
Yes. A load bank gives steady load bands, so diesel and gas flows can be measured at each band for the substitution figures, and it allows the largest load step and the fallback to diesel at full load to be tested in a controlled way. Site load rarely holds steady long enough for reliable readings.
General guidance only. Values illustrative.