In short. After a trip or blackout, the useful question is what happened first and why. Sequence-of-events (SOE) lists show the order of status changes. Disturbance records show the voltage and current waveforms around the event. With accurate, synchronised time stamps, the two together turn an incident into a confirmed cause and a fix, instead of a guess and a repeat.
Who this page is for: For protection engineers, plant managers and maintenance teams investigating trips, blackouts and failed transfers.
Key facts
- SOE gives the order of events with millisecond time stamps at the source.
- Disturbance records capture waveforms before and after a trigger.
- Trends show slow changes; alarm logs show what operators saw.
- All devices must share one time source.
- Trigger on protection pickup, trip, voltage dip and breaker operation.
- Collect records automatically and keep the original files.
Records and their use
| Record | Shows | Needs |
|---|---|---|
| Event list (SOE) | Order of status changes | Millisecond time stamping at the source |
| Disturbance record | Waveforms around a trigger | Enough pre- and post-trigger time |
| Trend | Slow changes over hours to months | Historian with sensible resolution |
| Alarm log | What operators saw | Operator action record |
Worked example: why the generator tripped (illustrative)
A generator tripped 40 seconds after taking the load in an outage. The first explanation was “overload”. The records said otherwise:
| Time | Source | Event |
|---|---|---|
| 00:00.000 | ATS | Transfer to generator |
| 00:00.000 to 00:38 | Trend | Load about 70%; voltage steady |
| 00:38.210 | Feeder relay | Chiller motor start; current 6 × running |
| 00:38.700 | Generator controller | Frequency falls below 47.5 Hz, reaching 47.2 Hz |
| 00:40.500 | Generator controller | Underfrequency trip after 1.8 s below 47.5 Hz |
The cause was the chiller restarting automatically into an already loaded set, not general overload. The fix was a restart delay and sequencing for the chiller. See load restoration.
Do not clear alarms, reset relays or power-cycle controllers before saving the event lists and disturbance records. The evidence that explains the trip is often overwritten by the first reset.
Setup
- Time-synchronise devices. See time synchronisation.
- Define triggers: protection pickup, trip, voltage dip, breaker operation.
- Record enough pre-fault time.
- Name signals clearly and consistently.
- Collect records automatically after events; keep originals.
Analysis
- Build one timeline from all devices.
- Find the first abnormal event.
- Read the waveforms around it.
- Compare with the designed protection and control response. See coordination.
- Fix, then confirm with the next event.
Incident record
The record of one acceptance test on a textile spinning mill with four 625 kVA sets on two buses, assembled from its relays and its plant PLC. The example above explains a trip that looked like an overload and was not; this record explains the opposite case — a shedding scheme that did exactly what it was told and still failed its criterion, on a different plant with four sets and two buses. The whole finding lives in the intervals between the rows, which is why a record with no millisecond stamps could not have produced it.
| Time | Device | Event | Comment |
|---|---|---|---|
| 00:00.000 | G4 set relay | Generator protection operates, reverse power element | First out. Time quality: synchronised. This is the injected condition for SAT 11 |
| 00:00.025 | G4 set relay | Trip command to the G4 breaker | 25 ms protection operating time |
| 00:00.085 | G4 breaker, reported by the G4 relay | Breaker open, auxiliary contact changed state | 60 ms breaker time. 85 ms from the protection operating |
| 00:00.085 to 00:00.145 | Bus A incomer relay, disturbance record | Frequency falling. Three sets now carrying 1580 kW | 1580 kW against a 1500 kW capacity is 105%. This interval is the whole problem |
| 00:00.145 | Bus A incomer relay | Underfrequency element picks up at 48.5 Hz | 60 ms after the breaker opened |
| 00:00.245 | Bus A incomer relay | Underfrequency element operates | After its 100 ms delay, as set at the time |
| 00:00.280 | Plant PLC | Shed stage 1 command issued | 25 ms worst-case scan plus about 10 ms for the output relay. Time quality: +11 ms, so this row is ordered but not graded against the relay rows |
| 00:00.340 | Ring frame line 2 contactor | Contactor open. 420 kW off the bus | 60 ms contactor. 195 ms from the underfrequency pickup to the load actually leaving |
| 00:00.390 | Bus A incomer relay, disturbance record | Frequency minimum, 47.6 Hz | Criterion was no lower than 48.0 Hz. This is the failure |
| 00:04.900 | Bus A incomer relay | Frequency above 49.5 Hz | Recovery took 4.5 s from the minimum |
| 00:14.900 | Plant PLC | Island stable re-entered | After the sequence’s 10 s hold. Load 1160 kW on three sets, 77% |
Nothing in this record is a malfunction. Every device met its own specification: the protection operated in 25 ms, the breaker opened in 60, the underfrequency element waited the 100 ms it was set for, the PLC scanned and drove its output in 35, and the contactor took 60.
Add them and the shed reached the load 195 ms after the frequency crossed 48.5 Hz, and the frequency spent that time falling under a 105% load. The failure is in the sum, not in any term of it, and a sum is exactly what an alarm list cannot show. The alarm log for this event reads “generator fault” and “stage 1 shed”, in that order, which is true and tells nobody anything.
The fourth column carries the two things that keep a record honest. The first is the first-out marker: the reverse power element on G4 is the initiating event, and everything below it is a consequence, which stops the investigation beginning at the frequency minimum and working outwards. The second is the time quality.
The relay rows are synchronised to better than half a millisecond and can be graded against each other; the PLC row sits at +11 ms and is marked as such, so nobody later tries to derive a scan time from the gap between it and the row above. Mixing a +11 ms source into a millisecond sequence without saying so is how a record ends up proving something that did not happen.
What the record changed is also worth stating, because a sequence of events is only useful if it ends in a number. The underfrequency delay came down from 100 ms to 60, which takes the path to 155 ms, and the stage 1 contactor was moved onto the relay’s own hard-wired output so that the PLC’s 35 ms is no longer in the chain at all. The retest reached 48.2 Hz. Both the failure and the retest stayed in the acceptance record, and the delay now carries its reason beside it on the cause-and-effect sheet.
One practical point about getting a record like this at all. The disturbance record that gives the frequency minimum at 00:00.390 exists because the relay was triggered on underfrequency pickup rather than on trip — a trigger set only on tripping would have captured nothing here, since nothing tripped. The events in rows one to three survive because nobody reset the G4 relay before the files were pulled off it. Both are decisions taken long before the test, and neither can be recovered afterwards.
Worked example: how much a disturbance record needs (illustrative)
A relay recording 8 analogue channels at 2000 samples per second, with 0.5 s before the trigger and 2 s after, stores 8 × 2000 × 2.5 × 2 bytes = 80,000 bytes, about 80 kB per record, plus a little for the digital channels. A relay with 8 MB of record memory therefore holds roughly 100 records before the oldest are overwritten. On a busy site with frequent motor starts set as triggers, that can be only a few weeks, which is why automatic collection after each event matters as much as the recording itself.
| Setting | Too short or low | Too long or high |
|---|---|---|
| Pre-trigger time | The start of the fault is missing | Fewer records fit in memory |
| Post-trigger time | Breaker clearing or recovery not captured | Memory fills faster |
| Sample rate | Harmonics and fast transients lost | Larger files for little gain on power-frequency events |
| Triggers | Events missed | Memory filled with routine events |
Keep records in a common format
Most relays and recorders can export disturbance records in COMTRADE, the common format for transient data defined in IEC 60255-24 and IEEE C37.111. Ask for it at purchase and use it for storage, so records from relays of different makes can be opened in one viewer and laid on one timeline. Records kept only in each maker’s own format end up readable only by whoever still has the right software.
What to look for in a disturbance record
- The pre-fault condition: load, voltage and frequency just before the event.
- The first abnormal change, in which channel, at what time.
- The fault type from the currents: which phases, whether earth current flowed.
- When protection picked up, when it tripped and when the current actually stopped.
- Recovery: how long voltage and frequency took to return, and whether anything else tripped.
Compare each time with the setting and the breaker’s known operating time. A gap between the trip command and the current stopping longer than the breaker should take points to a slow breaker; a trip that came later than the setting points to the setting, the CT or the relay.
A routine after every significant event
Within a day, collect the event lists and disturbance records from every device involved, the alarm log and the trends, before anything is reset. Build one timeline, find the first abnormal event, write a one-page summary of cause and fix, and file it with the records. A plant that does this after every trip builds, within a year, a library of real behaviour that no study can match.
Review the library once a year for patterns: the same feeder tripping in the same season, a breaker that is a few milliseconds slower each time, shedding that only just meets its criterion. Those patterns are where the next improvement comes from.
Review the library once a year for patterns: the same feeder tripping in the same season, a breaker that is a few milliseconds slower each time, shedding that only just meets its criterion. Those patterns are where the next improvement comes from.
Common mistakes
- Resetting before saving records.
- Devices on different clocks.
- Too little pre-trigger time.
- Blaming “overload” without reading the waveform.
What to send us
Send the event lists, disturbance files and a description of the incident. WhatsApp 98852 01608 or use the application engineering enquiry. See alarms and records.
Evidence note. Times and values are illustrative.
Questions engineers ask
How much memory does a disturbance record need?
Channels times sample rate times record length times bytes per sample. Eight analogue channels at 2000 samples per second for 2.5 s at 2 bytes each is about 80 kB, so 8 MB of relay memory holds roughly 100 records. With frequent triggers that can be only weeks, so collect records automatically after every event.
What is COMTRADE?
The common file format for transient and disturbance records, defined in IEC 60255-24 and IEEE C37.111. Records exported in COMTRADE from relays and recorders of different makes can be opened in one viewer and placed on one timeline. Specify it at purchase and use it for storage, so records stay readable when maker software changes.
Why do time stamps matter so much?
Because an investigation depends on the order of events across several devices, often only milliseconds apart. Without a common time source, relay, controller and SCADA clocks drift by seconds and the sequence becomes guesswork. Time-stamp events at the source, synchronise every device to one clock, and mark any source whose time quality is poorer.
How long should records be kept?
Keep event lists, disturbance records and incident summaries for every significant event for years, as policy and regulation require, because a fault that recurs months later is solved by comparing the records. Routine trends can be thinned after a period. Always keep the original files, not only screenshots or summaries.
Can SCADA replace relay records?
No. SCADA usually polls every second or more and time-stamps at the server, so it cannot show the order of events milliseconds apart or the waveforms of a fault. Relays and recorders capture both at the source. SCADA is useful for collecting those records and for the slower picture of what operators saw.
Who should review them?
Protection or control engineers, with operations, after every significant event: trips, failed transfers, blackouts and unexpected shedding. A short written summary of cause and fix, filed with the records, turns each event into a lesson. Recurring patterns should be reviewed at least once a year.
This guide gives general principles. Follow site records policy.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.