In short. A control hierarchy defines what each level decides and who may override whom. Field devices measure and act. Device controllers protect and run basic sequences. Plant controllers coordinate across devices, and the supervisory level observes and sets targets. Problems arise when two levels command the same thing, or when a higher level is needed for something a lower level should do on its own.
Who this page is for: For control engineers, consultants and owners structuring the controls of a generator plant, switchboard or critical facility.
Key facts
- Level 0 field, level 1 device, level 2 plant, level 3 supervisory.
- Protection lives at level 1 and must not depend on levels 2 or 3.
- Each command has one owner level at a time.
- Higher levels send targets; lower levels decide how to act safely.
- Losing a higher level should cost functions, not safety.
- Document the hierarchy before writing any logic.
Levels
| Level | Examples | Decides |
|---|---|---|
| 0 Field | CTs, VTs, breakers, sensors, actuators | Nothing; measures and acts |
| 1 Device | Protection relays, generator controllers (with synchronising and load sharing), ATS controllers, AVR, governor | Local protection and basic sequences |
| 2 Plant | PLC, PMS, plant master controller | Coordination across devices |
| 3 Supervisory | SCADA, HMI, historian, EMS | Operator commands, set points, alarms |
Worked example: what each level loses (illustrative)
| Level lost | Functions lost | What still works |
|---|---|---|
| 3 Supervisory | Remote view, history, remote commands | All automatic operation; local panels |
| 2 Plant | Automatic start/stop by load, capacity-based shedding | Running sets share; underfrequency shedding relays act; protection |
| 1 One device controller | That set’s automatic operation | Its protection relay trips it if needed; other sets continue |
A review of one plant found the generator protection trips wired through the plant PLC. Losing the PLC would have left the sets unprotected. The trips were moved to the device level. See cause and effect.
Do not route protection through a plant or supervisory controller. Protection belongs at the device level and must work with every higher level switched off.
Rules
- One owner per command at a time.
- Targets flow down; safety decisions stay low.
- Status flows up with quality flags.
- Communication between levels uses defined points. See industrial communications.
Hierarchy sheet
| Function | Owner level | If owner lost |
|---|---|---|
| Protection | ||
| Start and stop | ||
| Load sharing | ||
| Shedding |
How fast each level can act
The levels of a control hierarchy differ in how quickly they can see a change and act on it, and that speed, more than anything else, decides which level may own a function. A protection relay sees a fault within a cycle. A plant controller sees it only after the next scan, and a supervisory system only after its next poll of the plant controller. A function that must act in a fraction of a second cannot be owned by a level that refreshes every second or two, however convenient it would be to put all the logic in one place.
| Level | Typical time to see and act (illustrative) | Functions it can own |
|---|---|---|
| 1 Device: protection relay | 20 to 40 ms to decide, plus 40 to 80 ms for the breaker to open | Fault clearing, generator protection, direct-trip load shedding |
| 1 Device: generator controller | Tens of milliseconds for speed and voltage control loops | Speed, voltage, synchronising, load sharing, its own start and stop |
| 2 Plant: PLC or PMS | One scan of 10 to 50 ms, plus network update times of 100 ms to 1 s for data from other devices | Start and stop by demand, capacity-based shedding, restoration, transfers |
| 3 Supervisory: SCADA, HMI, EMS | A poll cycle of 1 to 5 s, and an operator’s response in minutes | Targets and set points, schedules, alarms, reports |
A worked example shows why this matters. Suppose a load-shedding decision is placed in the SCADA system because the priority table is kept there. When a generator trips, the worst-case delay before a feeder opens is a full poll cycle of 2 s, two PLC scans of 50 ms to pass the command down, about 10 ms for an output relay and 60 ms for the feeder breaker: about 2170 ms in all.
A scheme in which the generator breaker’s own auxiliary contact is wired to the plant controller acts in about 10 ms for the contact, 5 ms for the input filter, two scans of 20 ms, 10 ms for the output and 60 ms for the breaker: about 125 ms. A running set that has just been asked to carry the load of a tripped partner may stall or trip on under-frequency long before 2 s have passed. The priority table can still be edited at the supervisory level; the decision must be made lower down. See load-shedding automation and priority logic.
Command ownership and handover between levels
The rule that each command has one owner at a time is easy to state and easy to break. A breaker that can be closed from its own panel, from the plant controller and from the SCADA screen has three possible owners, and unless the design says which one is in charge at each moment, the last command received wins. That leads to a breaker that an operator opens locally for maintenance being closed again by an automatic sequence a second later.
| Mode selected | Who may command the breaker | Commands from other levels |
|---|---|---|
| Local | The panel at the breaker only | Rejected and logged; the plant controller shows the breaker as unavailable to automatic sequences |
| Remote manual | An operator at the HMI or SCADA | Automatic sequences may not operate the breaker; local panel commands rejected except an emergency trip |
| Automatic | The plant controller’s sequences | Operator commands rejected unless the operator first takes the breaker out of automatic |
| Any mode | Protection | A protection trip always acts, whatever the mode, and is never blocked by a higher level |
Three details make this work in practice. First, the mode selection itself has one owner: usually a key switch or selector at the breaker, so the person working on it controls it. Second, every level can see the mode, so an automatic sequence knows in advance that a breaker is unavailable and plans around it instead of failing part way through. Third, handover is bumpless: when a set is switched from manual to automatic, the controller starts from the set’s present load and set point rather than jumping to a stored value. The control philosophy page covers the modes in more detail.
Detecting the loss of a higher level
A lower level can act sensibly when a higher one fails only if it knows the higher one has failed. A value that simply stops changing looks exactly like a healthy, steady value. The standard answer is a heartbeat: the higher level increments a counter, or toggles a bit, at a fixed interval, and the lower level checks that it keeps changing. When it stops changing for longer than a set timeout, the lower level declares the link lost and moves to its fallback behaviour.
| Link | Heartbeat interval (illustrative) | Timeout | Fallback on loss |
|---|---|---|---|
| PMS to generator controller | 500 ms | 1.5 s | Hold the present kW and kVAr set points; keep sharing with the other sets; stay running |
| SCADA to PMS | 1 s | 3 s | Keep all automatic functions running on their last valid targets; alarm locally |
| EMS to PMS (import limit or schedule) | 5 s | 15 s | Hold the last target for a fixed time, then revert to a safe default stored in the PMS |
A timeout of three heartbeat intervals is a common starting point: long enough that one late or lost message does not cause a false alarm, short enough that a real failure is caught quickly. The fallback must be chosen for each link and written down. Holding the last set point suits a link whose loss is usually brief.
Reverting to a stored default suits a link whose targets change with the time of day, because a target that was right at noon may be wrong by evening. What must never happen is a lower level treating a lost link as an instruction to stop, open breakers or drop load. See control-system redundancy and degraded modes.
Passing status upwards with its quality
Status flows up the hierarchy, and every value should arrive with a statement of how far it can be trusted. A breaker shown as closed may be closed, or may be the last state received before a communication link failed an hour ago. A supervisory level that cannot tell the difference will show operators a plant that no longer exists.
- Good: the value is current and within its valid range.
- Stale: the value has not been updated within its expected interval; shown greyed or flagged.
- Communication failed: the source cannot be reached; the last value is shown only with a clear marker.
- Out of range: the reading is outside what the instrument can measure, often a failed transducer or broken wire.
- Substituted: an operator or engineer has forced the value; shown clearly so that it is not forgotten.
Logic at the plant level should use these flags as well as the operator screens. A load-sharing function that receives a stale kW value from one set should not keep calculating with it as if it were live. Time stamps matter too: when events from several levels are compared after a disturbance, they are only useful if every level’s clock agrees. See time synchronisation and event correlation.
Worked example: the hierarchy for a three-set plant
A plant has a utility incomer and three 1000 kVA generators on a common bus, each with its own generator controller, a PMS above them and a SCADA system for the operators. Writing down the owner and the fallback for each function produces the table below, which then becomes the reference for the logic, the wiring and the acceptance tests.
| Function | Owner | Backup or fallback |
|---|---|---|
| Generator protection | Level 1 protection relay on each set | None needed above it; works with every higher level off |
| Synchronising each set | Level 1 generator controller | Manual synchronising with a check-synchronising relay |
| kW and kVAr sharing | Level 1 controllers sharing directly with each other | Droop sharing if the sharing link fails |
| Starting and stopping sets on demand | Level 2 PMS | Sets already running stay running; operators start others locally |
| Priority load shedding | Level 2 PMS on breaker status and live kW | Level 1 under-frequency relays on the largest non-essential feeders |
| Utility import limit | Level 3 sets the limit; level 2 holds it | Level 2 reverts to a stored default limit |
| Alarm acknowledgement | Level 3 for the plant; local panels for their own alarms | Local acknowledgement at each panel |
The table also exposes gaps. If no backup can be written against a function, the plant depends on one level for it, and the owner should decide whether that is acceptable or whether a simpler backup, often a single relay, should be added.
Testing the hierarchy by switching levels off
The design is only proven when each level is removed in turn with the plant running and the result matches the table. A practical sequence is to disconnect the supervisory system first, then the plant controller, then one generator controller at a time, each with load on the bus and with a witness recording what happened.
For each test, confirm that the functions expected to stop did stop, that the functions expected to continue did continue, that protection remained available throughout, and that alarms reached the operators by the remaining route. Then restore the level and confirm that it picks up the plant’s present state without operating anything. These tests belong in the functional acceptance tests and should be repeated after any significant change to the control system.
Common mistakes
- Protection routed through the PLC.
- Two levels commanding the same breaker.
- Higher levels needed for basic operation.
- Hierarchy never written down.
What to send us
Send the control architecture drawing and the I/O list. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. The example is illustrative.
Questions engineers ask
How should a lower control level detect the loss of a higher one?
With a heartbeat: the higher level changes a counter or toggles a bit at a fixed interval, and the lower level checks that it keeps changing. If it stops for longer than a timeout, commonly about three intervals, the lower level declares the link lost and moves to a written fallback, such as holding its last set points or reverting to a stored default. A frozen value looks exactly like a steady healthy one, so without a heartbeat the loss goes unnoticed.
Where should load-shedding logic sit in a control hierarchy?
At the plant controller or lower, never at the supervisory level. A SCADA poll of 1 to 5 seconds is far too slow when a generator trips: a decision routed through a 2 s poll takes about 2.2 s to open a feeder, while a scheme driven by the generator breaker contact at the plant controller acts in about 0.1 to 0.2 s. The priority table can be edited from SCADA, but the decision must be made where it can act in time.
Should the PLC replace generator controllers?
Usually not. Generator controllers protect and run their own set, including starting, synchronising and engine protection, and keep doing so if the PLC fails. The PLC coordinates above them: which sets run, shedding, restoration and sequencing. Replacing the generator controllers with a PLC removes that independence.
What is an override?
A command or mode that takes priority over normal automation, such as an emergency stop, a protection trip or a device switched to local manual. Overrides are ranked in the control philosophy, protection and emergency stop first, and every override is shown on the HMI and logged so that operators know automation is not in charge.
How many levels do I need?
As many as the plant complexity justifies. A single set needs only protection and its own controller, with remote alarms. Several sets add a plant controller; grid parallel, batteries or many sites add supervision and energy management. Each added level needs a defined behaviour when it fails and its own tests.
Hard-wired or network?
Hard-wire safety signals and anything that must act fast or must work when the network is down: protection trips, interlocks, emergency stops, breaker commands and fast shedding. Use the network for measurements, set points, status for supervision and reports, with a heartbeat so the loss of a link is detected.
This guide gives general principles. Confirm with a project-specific design.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.