In short. IEC 61850 gives protection and control devices a common way to describe themselves and exchange data. It replaces many hard-wired signals with networked messages, including fast peer-to-peer messages for interlocking and tripping. It brings flexibility, less wiring and better diagnostics. It also demands careful network design, configuration control and testing, because a signal that used to be a wire is now a message.

Who this page is for: For protection, control and SCADA engineers planning digital substation or switchboard automation.

Key facts

  • A standard data model names functions such as breakers and overcurrent elements in every device.
  • Client-server reporting serves SCADA; fast peer-to-peer messages serve interlocks and trips.
  • Sampled values can carry digitised currents and voltages on a process bus.
  • Configuration files describe devices and communication; they must be version-controlled.
  • Fast messages need a well-designed, often redundant, network.
  • Every networked interlock or trip must be tested end to end, including network failure.

Main elements

ElementRole
Data modelStandard names for functions in each device
Client-server reportingData and commands to and from SCADA
Fast peer-to-peer messagesInterlocks and trips between devices
Sampled valuesDigitised current and voltage on a process bus
Configuration filesDescribe devices and communication

Worked example: a networked interlock (illustrative)

A bus-coupler interlock was moved from hard wiring to a networked message between two relays.

TestExpectedResult
Coupler open message receivedIncomer close permittedPass, about 4 ms transfer
Coupler closed message receivedIncomer close blockedPass
Network cable unpluggedMessage lost: close blocked (fail-safe), alarm raisedFirst test failed: last value held as “open”; logic changed to block on message timeout
Retest after changeClose blocked, alarmPass

The failed test showed why networked interlocks need explicit loss-of-message behaviour. A broken permissive wire removes the permissive and blocks closing; a message that stops arriving leaves the last value in place, unless the logic is designed for it. See interlocking and permissives.

Do not move interlocks or trips onto the network without defining what happens when messages stop. For interlocks, block on loss of message; for trips, alarm at once and make sure backup protection still clears faults. Test both by breaking the network.

Design points

  • Network design and redundancy for fast messages. See OT network.
  • Time synchronisation for event records. See time synchronisation.
  • Configuration files under version control.
  • Test tools to see and simulate messages.
  • Training for maintenance staff, who can no longer trace a wire.

See industrial power communications and SCADA.

Networked signal test sheet

Every networked signal on the protection relays of a textile spinning mill — 1580 kW on two buses, four 625 kVA sets — eight of them. The example above follows one bus-coupler interlock through four tests and the change its failure forced; this sheet is the systematic version across a plant with four sets, two buses and a coupler — and the pattern that emerges from eight rows is one that a single interlock cannot show. The fourth column is the whole point: for each signal, what the subscriber does when the message simply stops arriving.

SignalPublisherSubscriberLoss-of-message behaviourTested
Bus A protection operatedBus A incomer relayG1 relay, G2 relay, Q5 relayBlock every Bus A close on timeout after three missed messages, about 12 ms. Latched until reset by handSAT 14. Failed first time: the hard-wired interlock behind it had been wired to the Bus B relay. Rewired and reproved on both buses
Bus B protection operatedBus B incomer relayG3 relay, G4 relay, Q5 relayAs Bus A, referred to Bus BSAT 14
G1 dead-bus close in progressG1 relayG2 relayBlock G2’s dead-bus close on timeout. Blocking is the safe answer: a lost message must not be able to permit two sets to close to one dead busSAT 07, SAT 08
G3 dead-bus close in progressG3 relayG4 relayAs G1, on Bus BSAT 07, SAT 08
Q1 closedBus A incomer relayG1 relay, G2 relayBlock set closing on timeout. A lost message must not allow a set to close onto a live incomerSAT 09
Bus A VT supervision healthyBus A incomer relayG1 relay, G2 relay, Q5 relayTreat absence as unhealthy: block dead-bus closing and inhibit the sync check. The signal is deliberately phrased as “healthy” so that silence is the unsafe reading and therefore the blocking oneSAT 15
Breaker-failure backtrip from G2G2 relayBus A incomer relayDo not trip on timeout. A missing message must never cause a trip. Loss raises an alarm and the backtrip falls back to its hard-wired pathFAT 21, SAT 14
Underfrequency shed, stage 1Bus A incomer relayRing frame line 2 contactorNot networked, by decision. This one stayed hard-wired: the shed has to reach the contactor in 155 ms and must work with the network downSAT 11
     
     

Read the fourth column down the sheet and the pattern is an asymmetry that every networked scheme has to get right in both directions. Six of the eight signals are permissives, and all six block when the message stops: the absence of permission is treated as a refusal.

One of the eight is a trip, and it does the opposite — it must not act on silence, because a network fault that trips an incomer has turned a communications problem into an outage. The same event, a cable pulled out, therefore has to produce a block on six signals and no action at all on the seventh, and nothing about the network itself distinguishes the two. Only the subscriber’s configuration does.

Row six shows the trick that makes the blocking direction almost automatic. The signal is published as “VT supervision healthy” rather than “VT failed”, so a relay that hears nothing concludes that nothing is healthy and blocks. Had the signal been named the other way round, silence would have meant “no VT failure reported” and closing would have been permitted on a dead network — the same logic, the same relays, the opposite outcome, decided entirely by which state the message asserts. Naming the signal after the permissive condition rather than the fault condition is worth doing everywhere it is possible.

Row eight is the row that is not on the network, and it belongs on this sheet precisely because somebody has to be able to see that the decision was taken deliberately. A stage 1 shed has 155 milliseconds to reach a contactor, it has to work when the network is the thing that has failed, and it is the one action on this plant whose timing was proved by measurement rather than by specification. Networking it would have bought a tidier drawing and risked the one function that cannot afford a timeout. A sheet that only listed networked signals would leave a reader assuming nobody had considered it.

One last note on the right-hand column. Every row names the test that proved it, and the entry for the first row records the failure rather than hiding it: the logic was right, the configuration was right, and a single hard-wired interlock contact behind it was on the wrong relay. That is a fault that no amount of configuration review finds, because the configuration was never wrong. It is found by injecting the condition on the real plant and watching what the real breaker does.

Worked example: how quickly a lost message is noticed (illustrative)

A fast peer-to-peer message is sent at once when its value changes, repeated rapidly in a burst, and then repeated at a slow heartbeat interval while nothing changes. Each message carries a time allowed to live; if the subscriber receives nothing within that time, it declares the message lost.

Setting (illustrative)ValueConsequence
First repetitions after a changeA few milliseconds apartA single lost frame does not delay a trip
Steady heartbeat interval1 sNetwork load stays low when nothing happens
Time allowed to liveAbout 2 sA broken link is detected within about 2 s at worst

For an interlock, that is quick enough: within about 2 seconds the subscriber blocks the close it was permitting, as the retest in the example above required. For a trip, 2 seconds is far too long to wait for an alarm, so trip signals carried this way need a redundant network, supervision that alarms the loss at once, and backup protection that does not depend on the message at all.

The configuration files and why they matter

FileWhat it describes
ICD, device capabilityWhat a relay or controller model can do, supplied by its maker
SCD, system configurationThe whole substation: every device, every message, publisher and subscriber
CID, configured deviceThe configuration actually loaded into one device, extracted from the SCD

The SCD file is the wiring diagram of a digital substation. Keep it under version control with the drawings, record which version is loaded in every device, and change it only through the same approval and testing as a wiring change. A relay replaced after a failure must be loaded with the CID from the current SCD, not an old backup, or its messages may no longer match what the others expect.

Testing without disconnecting wires

With hard wiring, a relay is isolated for testing by opening test links. With networked signals, there are no links to open, so the standard provides test and blocked modes: a device in test mode marks its messages as test, and subscribers set to ignore test messages are not affected. Use these modes, check that every subscriber is configured to treat test messages correctly, and confirm the device is back in normal mode before the permit is closed. A relay left in test mode publishes trips nobody acts on.

Process bus and merging units

A further step replaces the copper CT and VT wiring to the relays with merging units in the switchgear that digitise currents and voltages and send them as sampled values over a process bus. It removes much of the secondary wiring and allows many relays to share one set of measurements, but it puts the protection’s measurements themselves on the network. That calls for precise time synchronisation, duplicated networks and careful testing, and it is justified mainly on larger substations rather than generator switchboards.

Common mistakes

  • No defined loss-of-message behaviour.
  • Configuration files not version-controlled.
  • Single network for trips.
  • Maintenance staff not trained to test messages.

What to send us

Send the single-line diagram, the relay list and the signals you plan to network. WhatsApp 98852 01608 or use the application engineering enquiry.

Evidence note. Test results are illustrative.

Questions engineers ask

How quickly is a lost GOOSE message detected?

Within the time allowed to live carried in each message, commonly about twice the steady heartbeat interval. With a 1 s heartbeat, a broken link is detected within about 2 s. That is fast enough for an interlock to block, but far too slow to rely on for a trip, which needs redundant networks, immediate supervision alarms and independent backup protection.

What are SCD, ICD and CID files?

Configuration files in the IEC 61850 system configuration language. ICD describes what a device model can do, SCD describes the whole substation including every message and subscriber, and CID is the configuration loaded into one device, taken from the SCD. Keep the SCD under version control like a wiring diagram and record which version each device runs.

Is IEC 61850 needed for small plants?

Not usually. A small generator plant is well served by hard-wired protection and interlocks with Modbus or similar for monitoring. IEC 61850 earns its cost on larger or multi-vendor substations, where its standard data model, reduced wiring, fast messaging and diagnostics outweigh the engineering and configuration discipline it requires.

Is GOOSE fast enough for trips?

Yes. Messages are sent within milliseconds of a change and repeated rapidly, and many protection schemes rely on them. What matters is the network: a dedicated or prioritised VLAN, redundancy such as parallel networks, supervision that alarms a lost message at once, and backup protection that clears faults even if the messages stop.

What about cybersecurity?

It is essential, because protection and interlock signals travel on the network. Segment the substation network from SCADA and the office, control who can change configurations, keep configuration files under version control, monitor for new devices and unexpected traffic, and apply a tested patch policy. See the OT network guidance.

Can older devices join?

Through gateways, with limits. A gateway can map an older relay into the data model for SCADA reporting, but fast peer-to-peer messaging, source time stamps and quality information may be lost or slower. For interlocks and trips involving older devices, hard-wired signals are usually the safer choice until those devices are replaced.

This guide gives general principles. Follow the standard and manufacturer guidance.