In short. SCADA lets operators see and command a power system. It collects data from relays, meters, generator and ATS controllers, UPS and BESS, stores history, and presents alarms and mimics. Design it as a supervision layer: the plant’s protection and automatic sequences must keep working safely if SCADA fails. Its quality depends on the point list, time stamping, alarm design, command authority and security.
Who this page is for: For control engineers, consultants and facility owners specifying or reviewing SCADA for generator plants, substations and critical facilities.
Key facts
- Layers: field devices, communication, gateways or RTUs, servers, operator HMIs.
- SCADA supervises; protection and local automatic control must not depend on it.
- The point list (every measurement, status, alarm and command, with an owner) is the core document.
- Time-stamp events at the source, not at the server.
- Define who may operate what, and from where.
- Segment the network, control accounts and keep a patching plan.
Components
| Layer | Examples |
|---|---|
| Field devices | Protection relays, meters, generator and ATS controllers, UPS, BESS, PLCs |
| Communication | Serial and Ethernet links. See industrial protocols |
| Gateways and RTUs | Translate protocols and aggregate data |
| Servers | Data acquisition, alarms, historian |
| HMI clients | Operator stations and remote views |
Design decisions
| Decision | Detail |
|---|---|
| Point list | Measurements, status, alarms and commands, each with an owner |
| Update rate | Fast for events, slower for trends |
| Time stamping | At the source. See time synchronisation |
| Redundancy | Servers, network and power, matched to criticality |
| Command authority | Who operates what, from where. See control philosophy |
| Security | Segmentation, accounts, patching. See OT network |
| Historian | Retention, resolution and backup |
Worked example: a point list for a three-set generator plant (illustrative)
| Group | Per set | Plant-level | Total points |
|---|---|---|---|
| Measurements (kW, kVAr, V, A, Hz, fuel, battery, temperatures) | about 20 | about 15 (bus, utility, feeders) | about 75 |
| Status (breakers, mode, ready, running) | about 10 | about 20 | about 50 |
| Alarms and trips | about 30 | about 20 | about 110 |
| Commands (start, stop, reset, mode) | about 5 | about 10 | about 25 |
| Total | about 260 points | ||
Writing the list first, with an owner for each point, settled the server sizing, the gateway ports and the test plan. During testing, the SCADA network was unplugged deliberately: the sets kept running, sharing load and protecting themselves, which proved SCADA was supervision, not control.
Do not route protection trips or automatic start and transfer logic through SCADA servers. If SCADA fails, the plant must still protect itself and respond to a mains failure on its own.
What SCADA should show for a generator plant
- Source status, breaker positions, bus voltage and frequency.
- kW, kVAr, power factor and loading per set.
- Fuel levels, battery voltage, coolant and oil.
- Mode and readiness: auto, not ready, locked out.
- Alarms with priority and first-out. See alarm rationalisation.
SCADA design checklist
| Item | Decision |
|---|---|
| Point list complete, with owners | |
| Time source and stamping at device | |
| Command authority matrix | |
| Redundancy level | |
| Security: segmentation, accounts, patching |
Worked example: how fast serial devices can be polled (illustrative)
Many generator controllers, power instruments and relays still talk Modbus over a serial line, and the line speed sets how fresh the SCADA view can be. Each character takes 11 bits, so a message of n bytes takes about n × 11 ÷ baud rate seconds, plus a turnaround time in the device and the master.
| Item | 9600 baud | 19,200 baud |
|---|---|---|
| Read 40 registers: 8-byte request plus 85-byte reply = 93 bytes | 93 × 11 ÷ 9600 ≈ 0.107 s | 93 × 11 ÷ 19,200 ≈ 0.053 s |
| Plus about 0.05 s turnaround | about 0.157 s per device | about 0.103 s per device |
| Twelve devices on one line | 12 × 0.157 ≈ 1.9 s per cycle | 12 × 0.103 ≈ 1.2 s per cycle |
A two-second refresh is fine for trends but too slow to judge the order of events or to drive any control. Split devices across several lines, poll fast-changing values more often than slow ones, move to Ethernet where the devices allow, and never rely on the polled value of a breaker state for a decision that needs to be made within a second.
Why events must be time-stamped at the source
When a fault trips three breakers within 40 ms, a SCADA server polling every two seconds sees all three changes in the same poll and cannot say which came first. Relays and controllers that time-stamp each change themselves, to the millisecond, against a common time source, give a true sequence of events that the server simply collects. That sequence is what shows whether the feeder cleared first and the incomer stayed in, or the incomer tripped wrongly. Specify source time-stamping and synchronised clocks for every protection device and controller, and check the time accuracy at commissioning.
Worked example: sizing the historian (illustrative)
For the three-set plant above, the 75 measurements sampled once a second produce 75 × 86,400 ≈ 6,480,000 values a day. At about 16 bytes per stored value, with time stamp and quality, that is about 104 MB a day uncompressed. Storing a value only when it changes by more than a set deadband typically reduces this by a factor of ten or more, to about 10 MB a day, roughly 4 GB a year. Keep at least two years online, so that seasonal comparisons are possible, and back the historian up off site.
Who may operate what, and from where
| Action | Local panel | Control room SCADA | Remote access |
|---|---|---|---|
| Open a breaker | Yes | Yes, with confirmation | Only if the site agrees, logged |
| Close a breaker | Yes, through interlocks | Yes, through the same interlocks | Usually not |
| Start or stop a generator | Yes | Yes | Monitoring only, commonly |
| Change operating mode | Yes | Authorised users only | No |
| Reset a lockout | Yes, after inspection | No | No |
| Change settings | Engineering access | Engineering access | No |
A local and remote selector at each panel decides which place has authority at any moment, and SCADA should show it. The table is an example; each site writes its own, but every site needs one.
How many alarms an operator can handle
Commonly used guidance for operator alarm loads suggests around one alarm every ten minutes in steady operation is manageable, and that alarm priorities should be weighted heavily towards the low end, with only a small share, around 5%, at the highest priority. During a plant upset, a flood of more than about ten alarms in ten minutes overwhelms anyone. Achieving that means fewer alarms, not faster operators: suppress consequential alarms behind their cause, remove alarms with no defined action, and review the alarm log after every significant event. See alarm rationalisation.
Security essentials for a power SCADA
- Separate the control network from the office network with a firewall that allows only the traffic listed in the design.
- Give every user a named account with the least privilege needed; no shared passwords.
- Route remote access through a single controlled gateway with strong authentication and session logging, and switch it off when not in use.
- Keep a patch and antivirus plan that is tested on a spare machine before it reaches the live servers.
- Back up server configurations, device configurations and the point database, and test a restore.
How much redundancy
| Level | What is duplicated | Suits |
|---|---|---|
| None | Nothing; local panels remain the fallback | Small plants where SCADA is a convenience |
| Server | A hot-standby server pair | Plants operated mainly from the control room |
| Server and network | Server pair plus a redundant network | Critical facilities with remote operation |
| Site | A second control room or disaster-recovery server | Large, multi-site or unattended operations |
Testing SCADA before relying on it
Test every point from the field device to the operator screen: each measurement against a calibrated instrument, each status by operating the equipment, each alarm by creating its condition and each command by executing it under the authority rules. Then test the failures: unplug a server, a switch and a gateway in turn, and confirm the plant carries on and the loss is alarmed. Keep the signed point-to-point record as part of the handover, because it is the reference every later change is checked against.
Gateways: where data quietly goes wrong
Most SCADA errors found at commissioning are not in the server or the device but in the translation between them. Four checks catch nearly all of them:
- Scaling: a value stored as tenths of a volt and displayed as volts reads ten times too high; check every analogue against a calibrated instrument.
- Data type and word order: 32-bit values spread over two registers can be read with the words swapped, giving nonsense that sometimes looks plausible.
- Stale data: when a device stops answering, the gateway may keep showing its last value; every point needs a quality flag that turns the value grey or invalid on the screen.
- Status sense: a breaker contact wired normally closed instead of normally open shows open when closed; operate each breaker and watch the screen.
What a good generator plant mimic looks like
The main screen should match the single-line diagram the operators already know, with sources at the top and loads below, and should show at a glance which breakers are closed, which sources are live, the bus voltage and frequency, and each set’s loading as a percentage of its rating. Colour should be reserved for abnormal states, so that a normal plant looks calm and a problem stands out; a screen full of bright colours hides the one that matters. Detail screens for each set, feeder and breaker sit one click below, and the alarm banner is visible from every screen.
Keeping the SCADA true to the plant
Every new feeder, replaced relay or changed setting is a potential mismatch between what SCADA shows and what the plant is. Make the point list a controlled document, update it with every change, retest the affected points from field to screen, and review the whole list once a year against the single-line diagram. Operators trust what they see; a screen that is right most of the time is more dangerous than one they know to check.
Common mistakes
- Automatic control depending on SCADA.
- Events stamped at the server.
- Every signal configured as an alarm.
- Flat network with shared passwords.
What to send us
Send the single-line diagram, the device list and what operators need to see and do. WhatsApp 98852 01608 or use the application engineering enquiry. See remote monitoring.
Evidence note. Point counts are illustrative; each plant’s list governs.
Questions engineers ask
How fast can SCADA poll Modbus devices on a serial line?
Each character takes 11 bits, so reading 40 registers, about 93 bytes in all, takes about 0.107 s at 9600 baud plus roughly 0.05 s turnaround. Twelve devices on one line then refresh only about every 1.9 s, or 1.2 s at 19,200 baud. Split devices across lines or move to Ethernet where faster data is needed.
How much historian storage does a generator plant need?
For about 75 measurements sampled every second, roughly 6.5 million values a day, or about 104 MB a day uncompressed at 16 bytes each. Storing values only when they change by more than a deadband typically cuts this to about 10 MB a day, around 4 GB a year. Keep at least two years online and back it up off site.
Is SCADA needed for one generator?
Not always. A single standby set is usually well served by its controller with remote monitoring that sends alarms and readings to a phone or a web page. Full SCADA earns its cost where there are several sources, breakers to operate centrally, events to analyse across many devices, or an operator who supervises the plant from a control room.
How many points should I monitor?
Those that support a decision, a diagnosis or a report, each with a named owner. A three-set plant typically needs a few hundred points: measurements, breaker and mode status, alarms and commands. Collecting everything a device offers adds load, cost and clutter without adding understanding, and makes the important signals harder to find.
Can SCADA be cloud-based?
Parts of it can: long-term history, reporting, fleet comparisons and remote viewing work well in the cloud. Control commands, alarm handling and the operator view during an emergency should stay local, so they keep working if the internet link or the cloud service fails. Any cloud link must pass through a controlled, secured gateway.
How long to keep data?
As long as it is useful and any regulation requires. Keep at least two years of trends online so seasonal patterns can be compared, keep event and alarm logs for longer because they explain incidents, and archive the rest off site. Deadband storage keeps the volume manageable, often around 4 GB a year for a small plant.
This guide gives general principles. Confirm with a project design.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.