5 kVA Generator Full-Load Current

In short. A 5 kVA generator delivers 7.0 A per phase at 415 V, three-phase, at 0.8 power factor — which is 4 kW and 3 kVAr. At 400 V the same set delivers 7.2 A and at 433 V it delivers 6.7 A, and if the set is single-phase it delivers 21.7 A at 230 V. The figures below are the starting point for the protective device, the cables and the changeover; the page then works through what actually decides a set of this size, using published prime-rated data for CPCB-compliant sets of this rating.

Quick answers for a 5 kVA set

  • Full-load current at 415 V: 7.0 A per phase
  • Full-load current, single-phase 230 V set: 21.7 A
  • Real power at 0.8 PF: 4 kW
  • Reactive power at 0.8 PF: 3 kVAr
  • Usual protective device: 10 A, MCB or MCCB, four-pole, set above 7.0 A; 32 A double-pole on a single-phase set
  • Diesel at full load: about 1.6 L/h
  • Per kVA at 415 V: about 1.39 A, so 5 × 1.39 ≈ 7.0 A

All figures are at the rated power factor of 0.8 on a 50 Hz set. Always confirm against the nameplate of the actual machine.

Full-load current at each supply voltage

Supply voltage Full-load current (A) Against 415 V Where it applies
380 V 3-phase 7.6 +9.2% Older and some imported equipment
400 V 3-phase 7.2 +3.8% Nominal European voltage; many nameplates
415 V 3-phase 7.0 reference Standard Indian LV supply
433 V 3-phase 6.7 −4.2% No-load and lightly loaded alternator setting
230 V single-phase 21.7 3.1 × Single-phase sets for houses and shops

The site’s chart rounds these figures to whole amps; this page keeps one decimal below 100 A because at this size a single amp is a noticeable share of the load.

For the same kVA, current and voltage move in opposite directions. Nothing about the machine changes between these rows — only the voltage it is connected at.

How the 7.0 A is worked out

For a three-phase set the full-load current is

I = kVA × 1000 ÷ (√3 × V)

With 5 kVA at 415 V:

  1. √3 × 415 = 1.732 × 415 = 718.78
  2. 5 × 1000 = 5000 VA
  3. 5000 ÷ 718.78 = 7.0 A

For a single-phase set there is no √3: I = kVA × 1000 ÷ V, so 5000 ÷ 230 = 21.7 A. That is why a single-phase set needs a heavier cable and changeover than a three-phase set of the same rating.

The kW and kVAr follow from the power factor rather than from the formula: 5 × 0.8 = 4 kW of real power, and 5 × 0.6 = 3 kVAr of reactive power. Power factor does not appear in the current calculation at all: the set delivers 7.0 A at its rated kVA whatever the power factor of the load, but the kW it can deliver at that current changes completely.

What a 5 kVA set is used for

A 5 kVA set is a household and small-shop machine: lights, fans, a refrigerator, a television, a computer and a small pump. It is most often single-phase, it sits on a terrace, a balcony or in a side passage, and it is usually bought by someone who has had one power cut too many in a summer. It will not run an air conditioner and a pump together, and the most useful thing this page can do is show why.

Reading the 7.0 A figure properly

For a set this small the current matters most at the point where it meets the house or shop wiring. The changeover switch, the cable from the set and the protective device all have to carry 7.0 A continuously on three-phase, or 21.7 A if the set is single-phase, and the single-phase figure is the one that surprises people: the same kVA on one phase draws three times the current of each phase on a three-phase set.

Single-phase or three-phase at 5 kVA

Sets up to 20 kVA are offered in both forms. The choice follows the building’s own supply, not the size of the load:

If the building has Choose Current to plan for
A single-phase connection and single-phase wiring Single-phase set 21.7 A at 230 V
A three-phase connection with loads on all phases Three-phase set 7.0 A per phase at 415 V
A three-phase connection but only essential single-phase loads to back up Either, with a changeover designed for it Check the heaviest phase, not the total

A three-phase set of 5 kVA can deliver only about a third of its rating on any one phase, roughly 1.7 kVA. If the essential loads all sit on one phase, a three-phase set of this size is effectively a 1.7 kVA single-phase set, and that is the most common reason a small set “cannot carry” a house it was sized for on paper.

Prime or standby: what the 5 kVA rating means

Sets of this size in India are normally sold on a prime rating: the set may run for unlimited hours at a varying load, and may carry about 10% more for a short period, typically one hour in twelve. A standby rating, for emergency use of around 200 hours a year, is usually about 10% higher on the same machine. Ask which one a quotation means.

Duty What it allows Rating Current at 415 V
Prime (normal offer) Unlimited hours, varying load 5 kVA, 4 kW 7.0 A
Prime, short overload About 10% more for a limited time about 5.5 kVA about 7.7 A
Standby Mains failure only, limited hours a year, no overload about 5.5 kVA about 7.7 A

The percentages are the usual pattern for this size range; the engine maker’s rating sheet for the actual set governs.

The machine behind the figure

Published prime-rated datasheets for CPCB-compliant 5 kVA sets give the following. Where two catalogue editions differ, both figures are shown as a range; other makes differ by a few percent.

Item Published figure
Engine 1 cylinder, 0.95 litres, naturally aspirated, 1500 rpm
Diesel at 100% load 1.6 L/h
Diesel at 75% load 1.3 L/h
Diesel at 50% load 1 L/h
Diesel per kWh at full load 0.4 L
Built-in fuel tank 50 litres
Running time on a full tank at 75% load about 38 hours

The diesel-per-kWh line is the one worth reading. A set this small burns noticeably more diesel for every unit of electricity than a larger set, because its engine has proportionally higher friction and cooling losses. That is the honest reason not to oversize a small set: one size too large costs fuel on every hour it runs lightly loaded.

What the site does to the 7.0 A

Published ratings are quoted at reference conditions. Plant rooms, terraces and side passages in Telangana and Andhra Pradesh are hotter than the reference, and sets of this size are often installed in tight spaces where the radiator draws back its own hot air.

A derate in the region of 5 to 10% is common in regional summer conditions, which takes this set from 5 kVA to somewhere between 4.5 and 4.8 kVA, and the usable current at 415 V from 7.0 A to between 6.3 and 6.6 A. These are illustrative figures to show the size of the effect; the engine maker’s derating curve for the actual engine is what a design should use.

The practical consequence is the margin. Keep clear space around the canopy, do not let the hot air from the radiator loop back to the air intake, and keep the radiator fins clean. On a set of this size those three things decide whether it carries its plate in May.

Worked example

A two-bedroom house wants to run lights, fans, a refrigerator, a television, a computer and a 1 HP borewell pump. The measured result is 2.9 kW at 0.85 power factor.

  1. Load in kVA: 2.9 ÷ 0.85 = 3.4 kVA.
  2. Against the set’s kW limit: the engine is rated 4 kW, so the load uses 72% of rated kW.
  3. Current drawn: 3.4 × 1000 ÷ (1.732 × 415) = 4.7 A, against the set’s 7.0 A.
  4. Largest motor: check it against the start limit in the five-line check below before signing off.

So a 5 kVA set fits, at 72% of its kW rating, which is inside the 80% most owners plan to and leaves room for one more appliance. On a site that is expected to grow, the next rating up is the safer choice.

Does a 5 kVA set fit your site? A five-line check

Check Figure to use Pass if
1. Running kW Measured maximum demand in kW 3.2 kW or less for comfortable loading
2. Running kVA kW ÷ measured power factor 4 kVA or less
3. Largest motor started direct on line Motor kW About 0.55 kW (0.75 HP) or less, or use a soft starter or drive
4. Protective device Existing device and setting 10 A device, set above 7.0 A
5. Phase arrangement Building supply and essential loads Set type matches the building supply

Fail line 3 and the set is not too small for the load; it is too small for the start. That is a different fix and usually a cheaper one.

Common mistakes with a 5 kVA set

What to send us

If you are deciding whether a 5 kVA set is the right size, these five things let us answer properly rather than guess:

  1. Maximum demand in kW and the power factor it was measured at. Against this set the limits are 4 kW and 5 kVA, and which one binds depends on the power factor.
  2. The largest motor — pump, lift or AC unit — its rating, and how it is started.
  3. Single-phase or three-phase: the building’s electricity connection and how the essential loads are spread across the phases.
  4. Where the set will stand: terrace, basement, side passage or open yard, and the distance to the changeover.
  5. How the set will be used: a few hours of power cuts a week, daily shifts, or continuous running. The rating and the service plan follow from it.

Questions engineers ask

How many amps is a 5 kVA generator?

7.0 A per phase at 415 V, three-phase, at 0.8 power factor. At 400 V it is 7.2 A and at 433 V it is 6.7 A. A single-phase 5 kVA set delivers 21.7 A at 230 V. The kW rating at the same power factor is 4 kW.

What breaker size suits a 5 kVA generator?

A 10 A four-pole MCB or MCCB is usual, set above the 7.0 A full-load current with margin for motor starting; a single-phase set needs a 32 A double-pole device above its 21.7 A. The exact setting belongs to the protection coordination, because it has to protect the alternator and still ride through the largest start.

How many kW is a 5 kVA generator?

4 kW at the standard rated power factor of 0.8. The set must stay within both 4 kW and 5 kVA; whichever the load reaches first is the limit. For comfortable running, plan the load at about 3.2 kW.

How much diesel does a 5 kVA generator use per hour?

Published prime-rated figures are about 1.6 litres per hour at full load, 1.3 at 75% load and 1 at 50% load. Actual consumption follows the load, so a set running at half load uses close to the half-load figure.

What is the largest motor a 5 kVA set can start?

Direct on line, about 0.55 kW (0.75 HP) with a voltage dip the set recovers from. A larger motor needs star-delta, a soft starter or a drive, or a larger set. The motor and alternator data decide the actual case.

Full-load current at other ratings

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 23 November 2026.