320 kVA Generator Full-Load Current

In short. A 320 kVA generator delivers 445 A per phase at 415 V, three-phase, at 0.8 power factor — which is 256 kW and 192 kVAr. At 400 V the same set delivers 462 A and at 433 V it delivers 427 A, because current rises as voltage falls for the same kVA. The figures below are the starting point for the breaker, the cables and the changeover switch; the page then works through what actually decides a set of this size, which is rarely the current.

Quick answers for a 320 kVA set

  • Full-load current at 415 V: 445 A per phase
  • Real power at 0.8 PF: 256 kW
  • Reactive power at 0.8 PF: 192 kVAr
  • Usual breaker frame: 630 A, set above 445 A
  • Per kVA at 415 V: about 1.39 A, so 320 × 1.39 ≈ 445 A

All figures are at the rated power factor of 0.8 and assume a three-phase, four-wire set. Always confirm against the nameplate of the actual machine.

Full-load current at each supply voltage

Supply voltage Full-load current (A) Against 415 V Where it applies
380 V 3-phase 486 +9.2% Older and some imported equipment
400 V 3-phase 462 +3.8% Nominal European voltage; many nameplates
415 V 3-phase 445 reference Standard Indian LV supply
433 V 3-phase 427 −4.2% No-load and lightly loaded alternator setting

The pattern is the one every engineer uses as a sanity check: for the same kVA, current and voltage move in opposite directions. Nothing about the machine changes between these rows — only the voltage it is connected at.

How the 445 A is worked out

For a three-phase set the full-load current is

I = kVA × 1000 ÷ (√3 × V)

With 320 kVA at 415 V:

  1. √3 × 415 = 1.732 × 415 = 718.78
  2. 320 × 1000 = 320,000 VA
  3. 320,000 ÷ 718.78 = 445 A

The kW and kVAr follow from the power factor rather than from the formula: 320 × 0.8 = 256 kW of real power, and 320 × 0.6 = 192 kVAr of reactive power. Power factor does not appear in the current calculation at all, which is the part that catches people out: a set delivers 445 A at its rated kVA whatever the power factor of the load, but the kW it can deliver at that current changes completely.

What a 320 kVA set is used for

A 320 kVA set is where the load usually stops being lighting and air conditioning and starts being machinery. We put sets this size into small and mid-size manufacturing units, cold stores, water works, textile units and hospital plant rooms — places where one motor is large enough to be the whole sizing question.

Reading the 445 A figure properly

445 A puts the set on a 630 A frame, and that gap between 445 A and 630 A is deliberate: at this size the breaker has to let a motor start through without tripping. The number that matters on a 320 kVA site is rarely 445 A. It is the dip the largest motor causes when it starts, and a set can be half loaded and still fail that test.

Standby, prime or continuous: the same set, three different figures

A nameplate reading 320 kVA does not say how long the set may hold it. The international rating definitions separate three duties, and the same machine carries a different figure in each:

Duty What it allows Typically for this machine Current at 415 V
Standby Mains failure only, limited hours a year, no overload 320 kVA, 256 kW 445 A
Prime Unlimited hours at a varying load about 288 kVA, 230 kW about 401 A
Continuous Unlimited hours at a constant load, base load duty about 224 to 256 kVA about 312 to 356 A

The percentages differ between manufacturers and between engines, so the figures in the third and fourth columns are the usual pattern rather than a specification: prime is commonly around 90% of the standby rating and continuous around 70 to 80%. What governs is the nameplate of the actual set and the engine maker’s own rating sheet.

This is where two quotations for “a 320 kVA set” can describe different machines. If one is a standby rating and the other a prime rating, the second is the larger engine and the honest comparison is between the duties, not between the plates. Ask which duty the figure belongs to before comparing anything else.

What the site does to the 445 A

Published ratings are quoted at reference conditions. Real plant rooms in Telangana and Andhra Pradesh are hotter than the reference, often higher than sea level, and sometimes short of cooling air, and every one of those reduces what the engine will deliver.

A derate in the region of 5 to 10% is common once a set is installed in regional summer conditions, which would take this machine from 320 kVA to somewhere between 288 and 304 kVA, and the current at 415 V from 445 A to between 401 and 423 A. Those are illustrative figures to show the size of the effect; the engine manufacturer publishes a derating curve for the actual engine, and that curve is what a design should use.

The practical consequence is the margin. A load that comes to 243 kW against a 256 kW plate looks like a 5% margin on paper and can be no margin at all on a hot afternoon.

Worked example

A unit has 130 kW of running load at 0.86 power factor and one 45 kW pump started direct on line.

  1. Running load: 130 ÷ 0.86 = 151 kVA, which is 151 × 1000 ÷ (1.732 × 415) = 210 A. Against 445 A that looks comfortable, and against the set’s 256 kW the load is only 51%.
  2. The pump’s running demand: 45 ÷ (0.87 × 0.93) = 55.6 kVA.
  3. Direct on line at 6.5 times that: 361 kVA of starting demand, on top of the 151 kVA already running — 512 kVA in total from a 320 kVA set.
  4. Voltage dip with 0.20 per unit transient reactance: 512 ÷ 320 = 1.60, and 0.20 × 1.60 ÷ (1 + 0.20 × 1.60) = 24%. Contactors drop out somewhere around 20%, so the plant would trip itself off every time the pump started.
  5. With star-delta, the start draws about a third of that: 120 kVA, so 271 kVA in total. The dip becomes 0.20 × 0.85 ÷ (1 + 0.20 × 0.85) = 14.5%, which is inside the usual 15% limit.

Same set, same load, same motor. The starting method is the difference between a plant that runs and a plant that trips, and the set was only half loaded throughout.

Motor starting worksheet for a 320 kVA set

Step Work out Your figure
1 Running load in kVA = running kW ÷ power factor  
2 Largest motor in kVA = motor kW ÷ (PF × efficiency)  
3 Starting multiple: 6.5 direct on line, about 2.2 star-delta, 3 for a soft starter set at 300%  
4 Starting demand = step 2 × step 3  
5 Total during the start = step 1 + step 4  
6 r = step 5 ÷ 320  
7 Dip = Xd × r ÷ (1 + Xd × r), with Xd from the alternator datasheet  

Under 15% is comfortable. 15 to 20% needs a look at what the dip reaches — contactor coils, drives and lighting ballasts all have their own limits. Over 20% means a change: a different starting method, power factor correction on the running load, or the next rating up.

Common mistakes with a 320 kVA set

What to send us

If you are deciding whether a 320 kVA set is the right size, these five things let us answer properly rather than guess:

  1. Maximum demand in kW and the power factor it was measured at — both, not one. Against this set the limits are 256 kW and 320 kVA, and which one binds depends entirely on the power factor.
  2. The largest motor, its rating, and how it is started: direct on line, star-delta, soft starter or variable speed drive.
  3. The supply voltage on the nameplate — 380, 400, 415 or 433 V. It changes the current from 427 A to 486 A across that range for the same set.
  4. The route from the set to the panel: length, whether it is tray, trench, duct or conduit, and the ambient temperature it runs through.
  5. How the set will be used: standby for a few hours a month, prime power for shifts, or continuous. The same machine carries different ratings for each.

Questions engineers ask

How many amps is a 320 kVA generator?

445 A per phase at 415 V, three phase, at 0.8 power factor, which is 256 kW, worked out as 320 times 1000 divided by 1.732 times 415. At 400 V it is 462 A and at 433 V it is 427 A. A 630 A breaker frame is the usual choice, with the setting coordinated with the motor starts and the downstream protection.

What is the largest motor a 320 kVA generator can start?

There is no single answer, because it depends on the starting method, the alternator’s transient reactance and how much load is already on the set. The worksheet above works it out in seven lines for your own figures, and the motor starting calculator does the same arithmetic for you.

What breaker does a 320 kVA generator need?

A 630 A frame set above the 445 A full-load current is the usual arrangement, with the thermal setting above the largest start and the instantaneous setting checked against what the alternator can actually deliver into a fault, which is far less than the mains can.

Is a 320 kVA set better than two 160 kVA sets for a factory?

For motor starting, one larger set is almost always better, because the voltage dip depends on the total machine behind the start. Two smaller sets win on redundancy and on light load running, at the cost of synchronising controls and two maintenance schedules. If the plant has one dominant motor, take the single set and check the dip.

Full-load current at other ratings

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 13 November 2026.