In short. Between 15 and 50 kVA a generator stops being a backup appliance and becomes a small electrical system. The set now feeds a mix of lighting, IT, pumps, air-conditioning and refrigeration through an automatic changeover and a dedicated essential distribution board. Three answers decide the selection: what must keep running, what starts hardest, and what can stay disconnected. Get those right and balance single-phase loads across the phases, and a 415 V set in this band will serve for years.
Who buys in this range and why
A 15 to 50 kVA set is the standard choice for small offices, bank branches, clinics and nursing homes, restaurants, apartment blocks with one or two lifts, showrooms, schools, cold rooms, packaging units and workshops across Hyderabad and the districts. The owner wants the business to continue through a DISCOM outage, not merely to keep the lights on, so loads must be grouped, the changeover must be automatic, and the set must ride through motor starts while computers stay up.
The three questions that size the set
Running demand
List the loads that must stay on and total their running kW, then convert to kVA at the measured or assumed power factor. For a mixed commercial load 0.8 is reasonable; a cold room or workshop full of motors may be lower. The generator sizing page walks through the method and the margins, and a tidy load inventory makes the rest of the exercise quick.
Starting demand
Find the single hardest start among the essential loads. In this band it is usually a lift motor, a 5 to 10 HP water pump, a cold-room unit or a packaged air-conditioner. A direct-on-line motor draws six to seven times its full-load current for a second or so, and a 20 kVA set that carries the running load comfortably may dip below the voltage at which contactors and computers hold in. The answer is either a larger set, a gentler starting method, or a rule that the pump does not start until the lift has arrived.
What can stay off
Every load that is not essential should be on the normal distribution board, not the essential board. Comfort air-conditioning, water heaters, decorative lighting and non-critical machines are the usual candidates. Each 1 kVA removed from the essential list is 1 kVA of starting margin gained for free.
Current, phase and balance
I = (kVA × 1000) / (√3 × 415)
In this expression I is the rated line current in amperes for a three-phase set at 415 V, and kVA is the generator rating. A 30 kVA set therefore delivers about 41.7 A per phase, and a 50 kVA set about 69.6 A (illustrative). The current calculator gives the figures for any rating.
The per-phase number matters because most loads in this band are single-phase: a 30 kVA set can only supply about 10 kVA on any one phase. The electrician must distribute lights, sockets, split air-conditioners and small equipment so that no phase carries much more than the others. Manufacturers typically allow 10 to 20% unbalance between phases; beyond that the alternator heats unevenly, voltage on the lightly loaded phases rises, and single-phase equipment on those phases suffers.
| Premises | Typical essential loads | Hardest start | Usual band (illustrative) |
|---|---|---|---|
| Clinic or diagnostic centre | Lighting, computers, refrigerators, one air-conditioned room | Refrigeration unit | 15 to 25 kVA |
| Bank branch or office | Lighting, IT, UPS, server room cooling | Server room air-conditioner | 20 to 30 kVA |
| Apartment block | Lift, pumps, common lighting, corridor fans | Lift motor or 7.5 HP pump | 25 to 40 kVA |
| Restaurant | Kitchen exhaust, refrigeration, lighting, billing | Walk-in cold room unit | 25 to 40 kVA |
| Small workshop or packaging unit | Three or four machines, motor, lighting | Compressed-air plant on DOL | 40 to 50 kVA |
The changeover becomes part of the system
At this size the generator is almost always started and connected automatically. An AMF panel watches the DISCOM supply, starts the engine on failure, closes the generator contactor or breaker once voltage and frequency are stable, and returns the load with a short delay once the mains has been healthy for a settable time.
The changeover must be interlocked so that mains and generator can never be connected together; in this band a four-pole contactor pair or a motorised changeover switch is normal, and the automatic transfer switch page compares the options. The essential distribution board sits downstream of the changeover and feeds only the loads that were agreed in the sizing exercise. Breaker, cable and panel incomer must all be rated for the set’s full current and the fault level at that point.
Fuel, runtime and placement
A set in this band consumes roughly 0.28 to 0.35 litres per kWh at 50 to 75% load, so a 40 kVA set carrying 24 kW uses about 7 to 8 litres per hour (illustrative). The baseframe tank on a canopied set usually holds enough for 8 to 12 hours; if outages in your area run longer, or if the set will cover a full shift, plan an external tank with a transfer pump.
The set should sit on a level pad with clearance for the radiator discharge, the doors and the exhaust, away from windows and air-conditioning inlets, with an earth electrode for the frame and the neutral. Where the only option is a basement or a room, read the indoor installation guidance before committing, because ventilation and exhaust routing cost more than the set in some buildings.
Standby, prime and the small-load problem
Most sets in this band are bought for standby duty, meaning a few hundred hours a year during outages, and are rated accordingly. If the set will run every day for a shift, for example at a site with unreliable supply in a rural mandal, ask for the prime rating, which is typically about 10% below the standby figure, and service by hours. In either case avoid running for long periods below 30% load. A 50 kVA set keeping 5 kW of lights on at night accumulates carbon and smokes; the fix is a smaller set for night duty or a periodic load bank test.
Worked example: a two-lift apartment block (illustrative)
| Load | kW | Power factor |
|---|---|---|
| Two lifts with variable-speed drives, both running | 16 | 0.95 |
| Water pump, 5 HP | 4.2 | 0.85 |
| Common lighting | 3 | 0.95 |
| Security, CCTV and intercom | 2 | 0.95 |
| Ventilation fans | 1.5 | 0.90 |
| Total | 26.7 kW, 10.2 kVAr | About 28.6 kVA |
With both lifts running and the pump on, about 28.6 kVA would load a 25 kVA set beyond its rating, but a 35 kVA set at about 82%. If the lifts are controlled so that only one runs at a time on generator, the demand falls by about 8 kW and a 25 kVA set can serve, with the controls tested to prove it.
Fuel across the band
| Rating | 75% load, litres an hour | Full load, litres an hour |
|---|---|---|
| 20 kVA | About 3.9 to 4.1 | About 5.1 to 5.3 |
| 35 kVA | About 6.3 | About 8.7 |
| 40 kVA | About 7.5 | About 9.5 |
| 50 kVA | About 9.6 to 10.2 | About 12.4 to 13.3 |
Figures are taken from makers’ published data for modern engines; the actual set’s data sheet governs. See DG fuel consumption chart.
The AMF panel in this band
In a 15 to 50 kVA installation the AMF panel does three jobs: it senses the grid on all three phases and starts the set when the supply fails or goes out of limits, it switches the essential board from grid to generator once the set is stable, and it switches back and cools the engine down when the grid returns and stays healthy.
Typical settings start the set after a delay of a few seconds, transfer within about ten to fifteen seconds of the failure, and wait several minutes before switching back. The panel is rated for the generator current and the incomer, with mechanical and electrical interlocks so that grid and generator can never be connected together. See utility and DG transfer control.
Why a separate essential board matters
Feeding the whole building from a small set invites overload, because anyone can plug a heater or switch on an air conditioner during an outage. A separate essential board, fed through the changeover and carrying only the loads that must run, keeps the set within its rating and makes the load predictable. Sockets and circuits on that board are marked so that occupants know which ones work during an outage.
Common mistakes
- Sizing from the DISCOM sanctioned load instead of the measured essential load. The set is either far too large and runs lightly loaded, or too small for the one motor nobody listed.
- Putting all the single-phase air-conditioners on the same phase because that wiring already existed. One phase overloads, the others run light, and voltage on them drifts high.
- Omitting the mechanical interlock on a contactor changeover. A welded contact parallels the set with the mains and destroys the alternator.
- Running a long, undersized cable from a canopy at the far end of the compound. Voltage drop at full load trips the UPS and contactors even though the generator is healthy.
- Leaving the AMF return delay at a few seconds. Every flicker on the mains triggers an unnecessary transfer and the engine stops before it has warmed through.
What to send us
Send your list of essential loads with the kW or HP of each motor and how it starts, the number of phases at the premises, the distance from the proposed generator location to the main distribution board, and photographs of the location and the existing panel. Mention whether outages in your area are usually short or run for several hours. If you already have a set, include a nameplate photograph. Use the generator sales enquiry form and we will propose a rating, a changeover arrangement and a cable size.
Questions engineers ask
How much diesel does a 35 to 50 kVA generator use?
From makers data for modern engines, roughly 6.3 litres an hour at three quarters load and 8.7 at full load for 35 kVA, 7.5 and 9.5 for 40 kVA, and 9.6 to 10.2 and 12.4 to 13.3 for 50 kVA. A 20 kVA set uses about 3.9 to 4.1 and 5.1 to 5.3. The actual set data sheet governs.
Why should a small generator feed a separate essential board?
Because feeding the whole building lets anyone switch on heaters or air conditioners during an outage and overload the set. A separate essential board, fed through the changeover and carrying only the loads that must run, keeps the set within its rating and makes the load predictable, with its sockets marked for occupants.
Is a 25 kVA generator enough for a two-lift apartment block?
Often, if the lifts are modern geared or gearless machines with drives and only one starts at a time, and if the pumps are sequenced. Older DOL lift motors starting together can need 40 kVA or more. Check the lift motor nameplates and the starting method before deciding (illustrative).
Can I run single-phase loads from a three-phase generator?
Yes, as long as the loads are spread evenly across the three phases. Each phase of a three-phase set supplies only a third of its rating, so concentrating single phase loads on one phase overloads that phase and creates unbalance that heats the alternator. Balance the loads at the essential board and check the phase currents.
Should the UPS be on the generator?
Yes, so that batteries recharge and the UPS output continues indefinitely. Keep the UPS below roughly 40 to 50% of the set’s rating because its input current is nonlinear and its battery charger adds demand after an outage, and widen the UPS input frequency window for generator supply.
How long does an AMF changeover take?
Typically about ten to fifteen seconds from grid failure to the load on generator: a start delay of a few seconds to ignore brief dips, the engine cranking and reaching rated voltage and frequency, and the changeover switching. Loads that cannot accept that break, such as computers, need a UPS.
Generators by rating
- Under 15 kVA generators
- 50–125 kVA generators
- 125–250 kVA generators
- 250–500 kVA generators
- 500–1000 kVA generators
- 1000–2000 kVA generators
- 2000 kVA and above generators
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 19 October 2026.