In short. A 1250 kVA generator delivers 1739 A per phase at 415 V, three-phase, at 0.8 power factor — which is 1000 kW and 750 kVAr. At 400 V the same set delivers 1804 A and at 433 V it delivers 1667 A, because current rises as voltage falls for the same kVA. Connected at 11 kV it draws only 65.6 A. The figures below are the starting point for the breaker, the cables and the changeover switch; the page then works through what actually decides a set of this size, which is rarely the current.
Quick answers for a 1250 kVA set
- Full-load current at 415 V: 1739 A per phase
- Real power at 0.8 PF: 1000 kW
- Reactive power at 0.8 PF: 750 kVAr
- Usual breaker frame: 2000 A, set above 1739 A
- At 11 kV: 65.6 A per phase
- Per kVA at 415 V: about 1.39 A, so 1250 × 1.39 ≈ 1739 A
All figures are at the rated power factor of 0.8 and assume a three-phase, four-wire set. Always confirm against the nameplate of the actual machine.
Full-load current at each supply voltage
| Supply voltage | Full-load current (A) | Against 415 V | Where it applies |
|---|---|---|---|
| 380 V 3-phase | 1899 | +9.2% | Older and some imported equipment |
| 400 V 3-phase | 1804 | +3.8% | Nominal European voltage; many nameplates |
| 415 V 3-phase | 1739 | reference | Standard Indian LV supply |
| 433 V 3-phase | 1667 | −4.2% | No-load and lightly loaded alternator setting |
| 11 kV 3-phase | 65.6 | −96.2% | Medium-voltage connection, long runs and campuses |
The pattern is the one every engineer uses as a sanity check: for the same kVA, current and voltage move in opposite directions. Nothing about the machine changes between these rows — only the voltage it is connected at.
How the 1739 A is worked out
For a three-phase set the full-load current is
I = kVA × 1000 ÷ (√3 × V)
With 1250 kVA at 415 V:
- √3 × 415 = 1.732 × 415 = 718.78
- 1250 × 1000 = 1,250,000 VA
- 1,250,000 ÷ 718.78 = 1739 A
The kW and kVAr follow from the power factor rather than from the formula: 1250 × 0.8 = 1000 kW of real power, and 1250 × 0.6 = 750 kVAr of reactive power. Power factor does not appear in the current calculation at all, which is the part that catches people out: a set delivers 1739 A at its rated kVA whatever the power factor of the load, but the kW it can deliver at that current changes completely.
What a 1250 kVA set is used for
A 1250 kVA set carries a whole large building or a whole plant: a tower with its chillers and lifts, a hospital campus block, a process line that cannot be interrupted, a data hall. It is a round 1000 kW, which is why it appears in so many specifications.
Reading the 1739 A figure properly
1739 A on a 2000 A frame, and at this size the interesting number is not the running current at all. It is the fault current, because an alternator is a far weaker source than a transformer, and protection chosen for the mains can sit there and do nothing when the set is supplying. The example below works that out, and it is the check most often missing from a changeover design.
Standby, prime or continuous: the same set, three different figures
A nameplate reading 1250 kVA does not say how long the set may hold it. The international rating definitions separate three duties, and the same machine carries a different figure in each:
| Duty | What it allows | Typically for this machine | Current at 415 V |
|---|---|---|---|
| Standby | Mains failure only, limited hours a year, no overload | 1250 kVA, 1000 kW | 1739 A |
| Prime | Unlimited hours at a varying load | about 1125 kVA, 900 kW | about 1565 A |
| Continuous | Unlimited hours at a constant load, base load duty | about 875 to 1000 kVA | about 1217 to 1391 A |
The percentages differ between manufacturers and between engines, so the figures in the third and fourth columns are the usual pattern rather than a specification: prime is commonly around 90% of the standby rating and continuous around 70 to 80%. What governs is the nameplate of the actual set and the engine maker’s own rating sheet.
This is where two quotations for “a 1250 kVA set” can describe different machines. If one is a standby rating and the other a prime rating, the second is the larger engine and the honest comparison is between the duties, not between the plates. Ask which duty the figure belongs to before comparing anything else.
What the site does to the 1739 A
Published ratings are quoted at reference conditions. Real plant rooms in Telangana and Andhra Pradesh are hotter than the reference, often higher than sea level, and sometimes short of cooling air, and every one of those reduces what the engine will deliver.
- Ambient temperature. The air entering the engine and the radiator is what counts, and in a closed plant room in May it can be well above the outside shade temperature.
- Altitude. Thinner air means less oxygen per stroke. Most of our region is low enough for this to be small, but it is not always zero.
- Air restriction. Undersized louvres, a dirty radiator or a long exhaust run with too many bends all show up as lost output, and they are the commonest cause on sets that used to carry the load and no longer do.
A derate in the region of 5 to 10% is common once a set is installed in regional summer conditions, which would take this machine from 1250 kVA to somewhere between 1125 and 1188 kVA, and the current at 415 V from 1739 A to between 1565 and 1653 A. Those are illustrative figures to show the size of the effect; the engine manufacturer publishes a derating curve for the actual engine, and that curve is what a design should use.
The practical consequence is the margin. A load that comes to 950 kW against a 1000 kW plate looks like a 5% margin on paper and can be no margin at all on a hot afternoon.
Worked example
Take a 1250 kVA alternator with 0.18 per unit transient reactance, and ask what it can deliver into a bolted three-phase fault at its terminals.
- Full-load current: 1739 A at 415 V.
- Initial symmetrical fault current, approximately 1 ÷ 0.18 times full load: 5.56 × 1739 = about 9.7 kA.
- That decays within a second or two. Sustained fault current, typically about three times full load for a machine with its excitation holding up: about 5.2 kA.
- Now the breaker: a 2000 A frame with a magnetic trip set at ten times its rating needs 20,000 A to trip instantaneously. The set can produce 9.7 kA at best, and 5.2 kA after a moment.
So on generator supply that breaker never trips instantaneously. It falls back to its thermal element, which takes seconds, and for those seconds the fault stays connected. On mains supply, where the transformer might deliver 40 kA or more, the same breaker clears in milliseconds.
The fix is not a bigger breaker. It is a second set of settings, or a relay, chosen for the generator source — and a check that the earth fault protection can also see a fault with only 5.2 kA behind it. This is the single most valuable half-hour of engineering on a 1250 kVA installation.
One 1250 kVA set, or two 750 kVA sets?
| Question | One 1250 kVA set | Two 750 kVA sets |
|---|---|---|
| Load swings below 350 kW for hours at a time | Runs at under 35% — wet stacking and glazed liners | One set at 58%, the other stopped |
| Site cannot lose power for servicing | It must, or a hire set comes in | Service one while the other carries the building |
| Largest motor starts direct on line | Holds the dip better — more machine behind the start | Needs both sets on line before the start |
| Capital and switchgear | One breaker, no synchronising | Synchronising panel, load sharing, more cable |
| Plant room and exhaust | One canopy, one stack, one tank | Two of each, and more floor |
| Peak demand likely to grow past 1000 kW | Replace the set | Add a third set |
Two sets win on availability and on part load. One set wins on cost, space and motor starting. If the building has a continuous base load above about 40% of the single set, take the single set.
Common mistakes with a 1250 kVA set
- Carrying the mains protection settings onto the generator. The worked example above shows a breaker that clears a fault in milliseconds on mains and not at all instantaneously on the set.
- Running a 1250 kVA set at 250 kW because the building is half empty. At 25% the engine does not reach temperature, fuel passes the rings, and the turbocharger and exhaust glaze up. If the load is genuinely that low for long periods, the set is the wrong size for now.
- Specifying 1250 kVA and connecting 1739 A to a 2000 A busbar with no fault calculation. The continuous rating is the easy part; the busbar also has to survive the fault force, and that is a separate calculation.
What to send us
If you are deciding whether a 1250 kVA set is the right size, these five things let us answer properly rather than guess:
- Maximum demand in kW and the power factor it was measured at — both, not one. Against this set the limits are 1000 kW and 1250 kVA, and which one binds depends entirely on the power factor.
- The largest motor, its rating, and how it is started: direct on line, star-delta, soft starter or variable speed drive.
- The supply voltage on the nameplate — 380, 400, 415 or 433 V. It changes the current from 1667 A to 1899 A across that range for the same set.
- The route from the set to the panel: length, whether it is tray, trench, duct or conduit, and the ambient temperature it runs through.
- How the set will be used: standby for a few hours a month, prime power for shifts, or continuous. The same machine carries different ratings for each.
Next step: work your own load through the generator kVA and kW sizing calculator, check the largest motor against the set, then send an enquiry with the five items above and we will confirm the rating in writing.
Questions engineers ask
How many amps is a 1250 kVA generator?
1739 A per phase at 415 V, three phase, at 0.8 power factor, which is 1000 kW. At 400 V it is 1804 A, at 433 V it is 1667 A, and at 11 kV the same set draws 65.6 A. This is the smallest rating at which high voltage generation is offered, and one megawatt of real output needs exactly this rating.
What is the fault current of a 1250 kVA generator?
With a transient reactance of 0.18 per unit, roughly 9.7 kA initially and about 5.2 kA sustained, a small fraction of what a distribution transformer of the same rating delivers. Use the per-unit figure from the data sheet of your own alternator, because it varies between machines, and check that every breaker still trips quickly on generator supply.
What breaker size does a 1250 kVA generator need?
A 2000 A frame above the 1739 A full load current, with trip settings chosen for the generator as a source rather than carried over from the mains supply. The frame is the straightforward part; the settings are where installations go wrong, because a generator delivers far less fault current, for a shorter time, than the transformer it replaces.
Is one 1250 kVA set better than two 750 kVA sets?
It depends on whether availability or cost matters more, and on how low the load drops. The decision table above sets out the questions that settle it. A continuous base load above about 40% of the single set points to the single set; a load that falls low at night, or that cannot lose backup during servicing, points to two sets.
Full-load current at other ratings
- 5 kVA — 7.0 A at 415 V
- 7.5 kVA — 10.4 A at 415 V
- 10 kVA — 13.9 A at 415 V
- 12.5 kVA — 17.4 A at 415 V
- 15 kVA — 20.9 A at 415 V
- 20 kVA — 27.8 A at 415 V
- 25 kVA — 34.8 A at 415 V
- 30 kVA — 41.7 A at 415 V
- 40 kVA — 55.6 A at 415 V
- 45 kVA — 62.6 A at 415 V
- 50 kVA — 69.6 A at 415 V
- 62.5 kVA — 87.0 A at 415 V
- 75 kVA — 104 A at 415 V
- 82.5 kVA — 115 A at 415 V
- 100 kVA — 139 A at 415 V
- 125 kVA — 174 A at 415 V
- 250 kVA — 348 A at 415 V
- 320 kVA — 445 A at 415 V
- 750 kVA — 1043 A at 415 V
- 1010 kVA — 1405 A at 415 V
- 1500 kVA — 2087 A at 415 V
- Every rating from 7.5 to 3000 kVA — the full chart
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 13 November 2026.