In short. Earthing connects the electrical system to the ground. Bonding connects exposed metal parts to each other and to the main earthing terminal, so that no dangerous voltage can appear between things a person can touch at the same time. Together they do three jobs: they keep touch voltage low during a fault, they give fault current a low-impedance path back to the source so that protection trips in time, and they give surge and noise currents a safe route. On a generator installation every metal part, from the frame and canopy to the fuel tank and exhaust, must be bonded, and the neutral must be earthed in exactly one planned place for each source arrangement.
Who this page is for: For electrical engineers, contractors and facility managers installing or checking a generator: get earthing, protective conductors and equipotential bonding right so that a fault trips safely and nobody gets a shock.
Key facts
- Earthing connects the system to the ground; bonding connects metal parts to each other.
- Conventional touch-voltage limit in dry conditions: 50 V AC.
- In a TN system, the fault loop impedance, not the earth pit resistance, decides whether protection trips.
- Protective conductor: same size as the phase conductor up to 16 mm², 16 mm² up to 35 mm², half the phase size above that (same material).
- Bond the generator frame, alternator, panel, canopy, fuel tank and exhaust, with flexible bonds across anti-vibration mounts.
- Earth the neutral at one planned point per source arrangement; a four-pole changeover keeps it that way.
Earthing, bonding and equipotential bonding
| Term | What it connects | What it achieves |
|---|---|---|
| System (neutral) earthing | The source neutral to earth electrodes | Fixes the system’s voltage to earth and defines where earth-fault current returns |
| Protective earthing | Exposed metal of equipment to the main earthing terminal through protective conductors (PE) | Gives fault current a path so that protection trips |
| Main equipotential bonding | Incoming services, building steel, pipes and cable trays to the main earthing terminal | Keeps all large metalwork at nearly the same potential |
| Supplementary bonding | Metal parts within reach of each other in a particular area | Limits touch voltage where disconnection might be slow |
| Functional earth | Electronics, screens and communications reference | Signal integrity and noise control, joined to the main system at one point |
Earthing systems used in India
| System | How it is arranged | Where it is found | Earth-fault protection |
|---|---|---|---|
| TN-S | Separate neutral and protective conductors from the source | Plants and buildings with their own transformer, and generator installations | Overcurrent devices often enough, because fault current is high |
| TN-C-S | Combined neutral and protective conductor up to a point, separate after it | Many LV supplies from the DISCOM network | As TN-S after the split point |
| TT | Equipment earthed through its own electrode, separate from the source earth | Some LV consumer supplies and temporary sites | Residual-current devices are essential, because fault current is limited by the earth path |
A generator usually forms its own TN-S system when it supplies a site. What matters is that the arrangement on generator supply is as safe as on grid supply, which is where most mistakes happen. See earthing and neutral grounding.
Sizing protective conductors
| Phase conductor area S | Minimum protective conductor (same material) |
|---|---|
| Up to 16 mm² | S |
| Above 16 mm² up to 35 mm² | 16 mm² |
| Above 35 mm² | S ÷ 2 |
The table is a quick method. Where fault current and clearing time are known, check the conductor with the adiabatic equation, which gives the minimum area that survives the fault without overheating:
For example, 8 kA cleared in 0.4 s needs at least 8000 × 0.63 ÷ 143 ≈ 35.4 mm², so the next standard size, 50 mm² of copper in an XLPE cable, is used. Main equipotential bonding conductors are usually at least half the size of the largest protective conductor, with a minimum of 6 mm² copper; they need not exceed 25 mm² copper.
Worked example: touch voltage at a remote panel (illustrative)
A 415 V TN-S feeder of 35 mm² copper with a 16 mm² copper protective conductor runs 50 m to a pump panel, protected by a 100 A MCCB. One phase faults to the panel’s metal enclosure.
| Quantity | Grid supply | Generator supply (250 kVA, PMG excitation) |
|---|---|---|
| Phase conductor resistance, 50 m of 35 mm² at working temperature | About 0.029 Ω | About 0.029 Ω |
| Protective conductor resistance, 50 m of 16 mm² | About 0.064 Ω | About 0.064 Ω |
| Fault current | 230 ÷ (0.02 source + 0.029 + 0.064) ≈ 2000 A | Sustained about 1000 A (about 3 × the 348 A rating) |
| Touch voltage on the enclosure (fault current × PE resistance) | About 130 V | About 64 V |
| 100 A MCCB instantaneous at 10 × In = 1000 A | Trips instantly | Marginal: about 1000 A after the first cycles sits right at the setting, so instant tripping cannot be relied on; the long-time (thermal) element, or a short-time element where an electronic release is fitted, must clear it |
On the grid, 130 V on the enclosure is above the 50 V limit, but the breaker clears it in milliseconds, which is acceptable. On the generator the touch voltage is lower but still above 50 V, and the breaker is now slow. The fixes are a short-time setting well below 1000 A (for example 600 A) in generator mode on an electronic release, a larger protective conductor, supplementary bonding at the pump, or an RCD. Each is checked by measuring the loop impedance after installation. See overcurrent and short-circuit protection.
Never remove or disconnect a protective conductor or bond to stop an earth-leakage or earth-fault trip. The trip is warning of a real fault path; the bond is what keeps people safe while it is found.
Bonding a generator installation
- Generator base frame, engine and alternator frame bonded to the main earthing terminal.
- Flexible bonds across the anti-vibration mounts, sized like protective conductors.
- Control panel, AMF panel and changeover enclosure bonded.
- Canopy or container bonded, with continuity across hinged doors and removable panels.
- Fuel tank, fuel pipework and day tank bonded.
- Exhaust pipe, silencer and stack bonded, especially where they run up the building.
- Cable trays, conduits and armour glanded and bonded at both ends.
- Neutral earthed at the single point the design calls for. See DG set earthing installation.
Where the neutral is earthed
When a generator and a transformer can each supply the same board, the neutral-earth link must be planned for both sources. With a three-pole changeover, the neutral is shared, and if both the transformer and the generator have neutral-earth links, neutral current splits between the neutral conductor and the earth path. Earth-fault relays then see current that is not a fault, and the protective conductors carry load current. With a four-pole changeover the neutral is switched with the phases, and each source keeps its own single neutral-earth link. See earth-fault protection.
Clean and noisy earths
Electronic systems such as BMS panels, SCADA and data equipment sometimes have a separate earth electrode at the client’s request. It must still be joined to the main earthing system at one defined point. Separate, unconnected earths can develop large voltage differences between them during a fault or a lightning strike, which is exactly what bonding is meant to prevent.
Verification and testing
| Test | What it proves | When |
|---|---|---|
| Continuity of protective and bonding conductors | Every bond is connected with a low resistance | Commissioning, after any work |
| Earth fault loop impedance | Protection will trip in time on each source | Commissioning, then periodically |
| Earth electrode resistance | The electrodes are effective. See earth resistance testing | Commissioning, then yearly in the dry season |
| RCD trip test | Residual-current devices trip at rated current and time | Commissioning, then periodically |
| Visual inspection | No painted, loose or corroded joints | Every maintenance visit |
Bonding checklist worksheet
| Item | Bonded (yes or no) | Conductor size | Continuity reading (Ω) |
|---|---|---|---|
| Generator base frame | |||
| Across anti-vibration mounts | |||
| Control or AMF panel | |||
| Canopy and doors | |||
| Fuel tank and pipework | |||
| Exhaust and stack | |||
| Cable trays and armour |
The joints that get assumed rather than tested
A bonding system is tested as a set of conductors and fails as a set of joints. The conductors are visible, documented and almost never the problem; the connections at their ends are none of those things. These are the ones that go unproved on real installations, with the way each fails and the test that actually finds it.
| Connection | How it fails | What finds it |
|---|---|---|
| Bond across an anti-vibration mount | The mount is an insulator by design, and the set moves relative to its base every time it runs | Continuity measured from the alternator frame to the plinth steel, with the set stopped and isolated |
| Canopy and door bonds | Hinges and latches are treated as a path; paint, powder coating and weather end it quietly | Continuity to each removable panel and door, repeated after any panel has been off |
| Bond across a flexible exhaust section | The bellows is there to move and its braid is not a protective conductor | A dedicated bonding link, proved by test rather than inferred from the braid |
| Cable gland and armour termination | The armour is the path, and a gland tightened on paint or a loose locknut interrupts it | Continuity from the armour to the enclosure, measured at both ends of the run |
| Extraneous metalwork brought in later | Pipework, ducting and trays installed after handover are bonded by whoever installed them, or not at all | A periodic walk of the room against a drawing, not a repeat of the original test sheet |
What the right-hand column has in common is that every entry is a measurement across a specific pair of points, taken with the installation in a known state. A single figure for the installation as a whole does not contain any of them: a bonding network with one failed joint reads much the same as one with none, because the test current finds whatever path remains.
The last row is the one that defeats a good original installation. Everything on the first four rows was correct on the day, and a building then acquires pipework, trays, ducting, handrails and plant that nobody added to the drawing. Re-running the original test sheet proves the original items are still sound and says nothing about the new ones, which is why a periodic inspection that only repeats the previous results can pass an installation that has quietly acquired unbonded metalwork. Walk the room against the drawing, add what has appeared, and bond what needs it.
One exception is worth stating because it runs the other way. Not every piece of metal needs bonding, and bonding something that is neither liable to become live nor liable to introduce a potential from elsewhere adds a path without adding safety. The question to ask of each item is whether a fault could make it live, or whether it could carry a potential in from outside the building. If neither applies, it is metalwork rather than an extraneous conductive part, and the drawing should say so, so the same argument is not reopened at every inspection.
Sizing bonding conductors, worked
Bonding conductors are sized from the protective conductors they connect. Under the common IEC 60364 rules adopted in Indian practice, a main equipotential bonding conductor is at least half the cross-section of the largest protective conductor in the installation, not less than 6 mm² copper, and need not exceed 25 mm² copper. A supplementary bond between two exposed parts is at least as large as the smaller protective conductor; one between an exposed part and other metalwork is at least half its protective conductor.
| Item | Working | Result |
|---|---|---|
| Generator incomer phase conductor | Copper, chosen for current and voltage drop | 300 mm² |
| Protective conductor for it | Half the phase size above 35 mm² | 150 mm² |
| Main equipotential bonding conductor | Half of 150 mm² is 75 mm²; the rule caps it at 25 mm² copper | 25 mm² copper |
| Bond across anti-vibration mounts | Flexible copper, sized as a supplementary bond | Braid at least the size of the frame protective conductor |
The cap on the main bonding conductor reflects its job: it equalises potential between services rather than carrying the full fault current, which travels on the protective conductors. Local rules or a utility’s requirement can ask for more, and the larger figure then applies.
Testing a bond properly
A bond is tested with a low-resistance ohmmeter using four wires, so that the test leads do not add to the reading. Short bonds in good condition read a few milliohms; what matters most is comparison with the same bond at commissioning and with similar bonds elsewhere on the site. A bond reading many times its neighbours has a loose, painted or corroded joint, and is remade rather than accepted. Readings are recorded on the bonding checklist with the date, so the next test has something to compare with.
Common mistakes
- Painted, corroded or loose bonding joints, especially on canopies.
- No flexible bond across anti-vibration mounts, so the frame is earthed only through rubber.
- Two neutral-earth links with a three-pole changeover.
- Separate “clean” earths that are never joined to the main system.
- Judging safety by earth pit resistance alone instead of the fault loop impedance.
What to send us
Send the site layout, the single-line diagram, the changeover type, the earth pit locations and any test readings. WhatsApp 98852 01608 or use the enquiry form.
Evidence note. Conductor tables and limits follow common international practice; earthing design must follow the applicable Indian regulations and standards. The worked example is illustrative.
Questions engineers ask
What size should the main equipotential bonding conductor be?
At least half the cross-section of the largest protective conductor in the installation, not less than 6 mm² copper, and it need not exceed 25 mm² copper under the common IEC 60364 rules. A 150 mm² protective conductor therefore leads to a 25 mm² copper main bond.
How is a bonding connection tested?
With a four-wire low-resistance ohmmeter, so the leads do not add to the reading. Short bonds in good condition read a few milliohms, and each reading is compared with commissioning values and similar bonds. A bond reading many times its neighbours is remade, not accepted.
Does an anti-vibration mount break the earth path?
It is designed to, which is why a bond across it is not optional. The mount isolates the set from its base, and the set moves relative to that base every time it runs, so the connection has to be a dedicated flexible link rather than anything the mounting hardware happens to provide. Prove it by measuring continuity from the alternator frame to the plinth steel with the set stopped and isolated.
Does every piece of metal in the generator room need bonding?
No, and bonding metalwork that needs none adds a path without adding safety. The test is whether a fault could make the item live, or whether it could bring a potential in from outside the building. If neither applies it is metalwork rather than an extraneous conductive part. Record that judgement on the drawing, so the same argument is not reopened at every inspection.
What is the difference between earthing and bonding?
Earthing connects the system and exposed metalwork to the general mass of earth through electrodes, setting a reference and giving fault current a return path. Bonding connects metal parts to each other, so they rise and fall in voltage together during a fault and nobody touching two of them receives a shock. A safe installation needs both.
Does a generator need its own electrode?
Not necessarily. A generator on a site is normally connected to the site main earthing terminal, which already has its electrodes, and the neutral is earthed at one point chosen in the design. A separate electrode is needed where the set is remote from the main earthing system or stands alone, and it must then be bonded so that no dangerous voltage can appear between the two.
What is equipotential bonding?
Connecting all exposed and extraneous conductive parts in an area, such as frames, pipes, cable trays and structural steel, so that the voltage between any two of them stays small during a fault. It does not prevent the fault, but it limits the touch voltage a person can experience until the protection clears it.
How often should earthing be tested?
At commissioning, after any change to the installation, and periodically as local rules and site policy require, often every one to five years depending on the risk. Measure electrode resistance, continuity of protective and bonding conductors, and earth fault loop impedance at the far ends of circuits. Test in the dry season, when soil resistance is highest.
This guide gives general principles. Earthing design must follow local regulations.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.