Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Earthing, Bonding and Equipotential Architecture Guide

How earthing and bonding make an installation safe and quiet: protective earth, equipotential bonding, functional earth, generator frame and neutral earthing, and the tests that verify them.

In short. Earthing connects the electrical system to the ground. Bonding connects exposed metal parts to each other and to the main earthing terminal, so that no dangerous voltage can appear between things a person can touch at the same time. Together they do three jobs: they keep touch voltage low during a fault, they give fault current a low-impedance path back to the source so that protection trips in time, and they give surge and noise currents a safe route. On a generator installation every metal part, from the frame and canopy to the fuel tank and exhaust, must be bonded, and the neutral must be earthed in exactly one planned place for each source arrangement.

Who this page is for: For electrical engineers, contractors and facility managers installing or checking a generator: get earthing, protective conductors and equipotential bonding right so that a fault trips safely and nobody gets a shock.

Key facts

  • Earthing connects the system to the ground; bonding connects metal parts to each other.
  • Conventional touch-voltage limit in dry conditions: 50 V AC.
  • In a TN system, the fault loop impedance, not the earth pit resistance, decides whether protection trips.
  • Protective conductor: same size as the phase conductor up to 16 mm², 16 mm² up to 35 mm², half the phase size above that (same material).
  • Bond the generator frame, alternator, panel, canopy, fuel tank and exhaust, with flexible bonds across anti-vibration mounts.
  • Earth the neutral at one planned point per source arrangement; a four-pole changeover keeps it that way.

Earthing, bonding and equipotential bonding

TermWhat it connectsWhat it achieves
System (neutral) earthingThe source neutral to earth electrodesFixes the system’s voltage to earth and defines where earth-fault current returns
Protective earthingExposed metal of equipment to the main earthing terminal through protective conductors (PE)Gives fault current a path so that protection trips
Main equipotential bondingIncoming services, building steel, pipes and cable trays to the main earthing terminalKeeps all large metalwork at nearly the same potential
Supplementary bondingMetal parts within reach of each other in a particular areaLimits touch voltage where disconnection might be slow
Functional earthElectronics, screens and communications referenceSignal integrity and noise control, joined to the main system at one point

Earthing systems used in India

SystemHow it is arrangedWhere it is foundEarth-fault protection
TN-SSeparate neutral and protective conductors from the sourcePlants and buildings with their own transformer, and generator installationsOvercurrent devices often enough, because fault current is high
TN-C-SCombined neutral and protective conductor up to a point, separate after itMany LV supplies from the DISCOM networkAs TN-S after the split point
TTEquipment earthed through its own electrode, separate from the source earthSome LV consumer supplies and temporary sitesResidual-current devices are essential, because fault current is limited by the earth path

A generator usually forms its own TN-S system when it supplies a site. What matters is that the arrangement on generator supply is as safe as on grid supply, which is where most mistakes happen. See earthing and neutral grounding.

Sizing protective conductors

Phase conductor area SMinimum protective conductor (same material)
Up to 16 mm²S
Above 16 mm² up to 35 mm²16 mm²
Above 35 mm²S ÷ 2

The table is a quick method. Where fault current and clearing time are known, check the conductor with the adiabatic equation, which gives the minimum area that survives the fault without overheating:

S = I × √t ÷ k · k ≈ 115 for a copper core in a PVC cable, ≈ 143 for a copper core in an XLPE cable (higher for a separate insulated or bare conductor)

For example, 8 kA cleared in 0.4 s needs at least 8000 × 0.63 ÷ 143 ≈ 35.4 mm², so the next standard size, 50 mm² of copper in an XLPE cable, is used. Main equipotential bonding conductors are usually at least half the size of the largest protective conductor, with a minimum of 6 mm² copper; they need not exceed 25 mm² copper.

Worked example: touch voltage at a remote panel (illustrative)

A 415 V TN-S feeder of 35 mm² copper with a 16 mm² copper protective conductor runs 50 m to a pump panel, protected by a 100 A MCCB. One phase faults to the panel’s metal enclosure.

QuantityGrid supplyGenerator supply (250 kVA, PMG excitation)
Phase conductor resistance, 50 m of 35 mm² at working temperatureAbout 0.029 ΩAbout 0.029 Ω
Protective conductor resistance, 50 m of 16 mm²About 0.064 ΩAbout 0.064 Ω
Fault current230 ÷ (0.02 source + 0.029 + 0.064) ≈ 2000 ASustained about 1000 A (about 3 × the 348 A rating)
Touch voltage on the enclosure (fault current × PE resistance)About 130 VAbout 64 V
100 A MCCB instantaneous at 10 × In = 1000 ATrips instantlyMarginal: about 1000 A after the first cycles sits right at the setting, so instant tripping cannot be relied on; the long-time (thermal) element, or a short-time element where an electronic release is fitted, must clear it

On the grid, 130 V on the enclosure is above the 50 V limit, but the breaker clears it in milliseconds, which is acceptable. On the generator the touch voltage is lower but still above 50 V, and the breaker is now slow. The fixes are a short-time setting well below 1000 A (for example 600 A) in generator mode on an electronic release, a larger protective conductor, supplementary bonding at the pump, or an RCD. Each is checked by measuring the loop impedance after installation. See overcurrent and short-circuit protection.

Never remove or disconnect a protective conductor or bond to stop an earth-leakage or earth-fault trip. The trip is warning of a real fault path; the bond is what keeps people safe while it is found.

Bonding a generator installation

  • Generator base frame, engine and alternator frame bonded to the main earthing terminal.
  • Flexible bonds across the anti-vibration mounts, sized like protective conductors.
  • Control panel, AMF panel and changeover enclosure bonded.
  • Canopy or container bonded, with continuity across hinged doors and removable panels.
  • Fuel tank, fuel pipework and day tank bonded.
  • Exhaust pipe, silencer and stack bonded, especially where they run up the building.
  • Cable trays, conduits and armour glanded and bonded at both ends.
  • Neutral earthed at the single point the design calls for. See DG set earthing installation.

Where the neutral is earthed

When a generator and a transformer can each supply the same board, the neutral-earth link must be planned for both sources. With a three-pole changeover, the neutral is shared, and if both the transformer and the generator have neutral-earth links, neutral current splits between the neutral conductor and the earth path. Earth-fault relays then see current that is not a fault, and the protective conductors carry load current. With a four-pole changeover the neutral is switched with the phases, and each source keeps its own single neutral-earth link. See earth-fault protection.

Clean and noisy earths

Electronic systems such as BMS panels, SCADA and data equipment sometimes have a separate earth electrode at the client’s request. It must still be joined to the main earthing system at one defined point. Separate, unconnected earths can develop large voltage differences between them during a fault or a lightning strike, which is exactly what bonding is meant to prevent.

Verification and testing

TestWhat it provesWhen
Continuity of protective and bonding conductorsEvery bond is connected with a low resistanceCommissioning, after any work
Earth fault loop impedanceProtection will trip in time on each sourceCommissioning, then periodically
Earth electrode resistanceThe electrodes are effective. See earth resistance testingCommissioning, then yearly in the dry season
RCD trip testResidual-current devices trip at rated current and timeCommissioning, then periodically
Visual inspectionNo painted, loose or corroded jointsEvery maintenance visit

Bonding checklist worksheet

ItemBonded (yes or no)Conductor sizeContinuity reading (Ω)
Generator base frame   
Across anti-vibration mounts   
Control or AMF panel   
Canopy and doors   
Fuel tank and pipework   
Exhaust and stack   
Cable trays and armour   

The joints that get assumed rather than tested

A bonding system is tested as a set of conductors and fails as a set of joints. The conductors are visible, documented and almost never the problem; the connections at their ends are none of those things. These are the ones that go unproved on real installations, with the way each fails and the test that actually finds it.

ConnectionHow it failsWhat finds it
Bond across an anti-vibration mountThe mount is an insulator by design, and the set moves relative to its base every time it runsContinuity measured from the alternator frame to the plinth steel, with the set stopped and isolated
Canopy and door bondsHinges and latches are treated as a path; paint, powder coating and weather end it quietlyContinuity to each removable panel and door, repeated after any panel has been off
Bond across a flexible exhaust sectionThe bellows is there to move and its braid is not a protective conductorA dedicated bonding link, proved by test rather than inferred from the braid
Cable gland and armour terminationThe armour is the path, and a gland tightened on paint or a loose locknut interrupts itContinuity from the armour to the enclosure, measured at both ends of the run
Extraneous metalwork brought in laterPipework, ducting and trays installed after handover are bonded by whoever installed them, or not at allA periodic walk of the room against a drawing, not a repeat of the original test sheet

What the right-hand column has in common is that every entry is a measurement across a specific pair of points, taken with the installation in a known state. A single figure for the installation as a whole does not contain any of them: a bonding network with one failed joint reads much the same as one with none, because the test current finds whatever path remains.

The last row is the one that defeats a good original installation. Everything on the first four rows was correct on the day, and a building then acquires pipework, trays, ducting, handrails and plant that nobody added to the drawing. Re-running the original test sheet proves the original items are still sound and says nothing about the new ones, which is why a periodic inspection that only repeats the previous results can pass an installation that has quietly acquired unbonded metalwork. Walk the room against the drawing, add what has appeared, and bond what needs it.

One exception is worth stating because it runs the other way. Not every piece of metal needs bonding, and bonding something that is neither liable to become live nor liable to introduce a potential from elsewhere adds a path without adding safety. The question to ask of each item is whether a fault could make it live, or whether it could carry a potential in from outside the building. If neither applies, it is metalwork rather than an extraneous conductive part, and the drawing should say so, so the same argument is not reopened at every inspection.

Sizing bonding conductors, worked

Bonding conductors are sized from the protective conductors they connect. Under the common IEC 60364 rules adopted in Indian practice, a main equipotential bonding conductor is at least half the cross-section of the largest protective conductor in the installation, not less than 6 mm² copper, and need not exceed 25 mm² copper. A supplementary bond between two exposed parts is at least as large as the smaller protective conductor; one between an exposed part and other metalwork is at least half its protective conductor.

ItemWorkingResult
Generator incomer phase conductorCopper, chosen for current and voltage drop300 mm²
Protective conductor for itHalf the phase size above 35 mm²150 mm²
Main equipotential bonding conductorHalf of 150 mm² is 75 mm²; the rule caps it at 25 mm² copper25 mm² copper
Bond across anti-vibration mountsFlexible copper, sized as a supplementary bondBraid at least the size of the frame protective conductor

The cap on the main bonding conductor reflects its job: it equalises potential between services rather than carrying the full fault current, which travels on the protective conductors. Local rules or a utility’s requirement can ask for more, and the larger figure then applies.

Testing a bond properly

A bond is tested with a low-resistance ohmmeter using four wires, so that the test leads do not add to the reading. Short bonds in good condition read a few milliohms; what matters most is comparison with the same bond at commissioning and with similar bonds elsewhere on the site. A bond reading many times its neighbours has a loose, painted or corroded joint, and is remade rather than accepted. Readings are recorded on the bonding checklist with the date, so the next test has something to compare with.

Common mistakes

  • Painted, corroded or loose bonding joints, especially on canopies.
  • No flexible bond across anti-vibration mounts, so the frame is earthed only through rubber.
  • Two neutral-earth links with a three-pole changeover.
  • Separate “clean” earths that are never joined to the main system.
  • Judging safety by earth pit resistance alone instead of the fault loop impedance.

What to send us

Send the site layout, the single-line diagram, the changeover type, the earth pit locations and any test readings. WhatsApp 98852 01608 or use the enquiry form.

Evidence note. Conductor tables and limits follow common international practice; earthing design must follow the applicable Indian regulations and standards. The worked example is illustrative.

Questions engineers ask

What size should the main equipotential bonding conductor be?

At least half the cross-section of the largest protective conductor in the installation, not less than 6 mm² copper, and it need not exceed 25 mm² copper under the common IEC 60364 rules. A 150 mm² protective conductor therefore leads to a 25 mm² copper main bond.

How is a bonding connection tested?

With a four-wire low-resistance ohmmeter, so the leads do not add to the reading. Short bonds in good condition read a few milliohms, and each reading is compared with commissioning values and similar bonds. A bond reading many times its neighbours is remade, not accepted.

Does an anti-vibration mount break the earth path?

It is designed to, which is why a bond across it is not optional. The mount isolates the set from its base, and the set moves relative to that base every time it runs, so the connection has to be a dedicated flexible link rather than anything the mounting hardware happens to provide. Prove it by measuring continuity from the alternator frame to the plinth steel with the set stopped and isolated.

Does every piece of metal in the generator room need bonding?

No, and bonding metalwork that needs none adds a path without adding safety. The test is whether a fault could make the item live, or whether it could bring a potential in from outside the building. If neither applies it is metalwork rather than an extraneous conductive part. Record that judgement on the drawing, so the same argument is not reopened at every inspection.

What is the difference between earthing and bonding?

Earthing connects the system and exposed metalwork to the general mass of earth through electrodes, setting a reference and giving fault current a return path. Bonding connects metal parts to each other, so they rise and fall in voltage together during a fault and nobody touching two of them receives a shock. A safe installation needs both.

Does a generator need its own electrode?

Not necessarily. A generator on a site is normally connected to the site main earthing terminal, which already has its electrodes, and the neutral is earthed at one point chosen in the design. A separate electrode is needed where the set is remote from the main earthing system or stands alone, and it must then be bonded so that no dangerous voltage can appear between the two.

What is equipotential bonding?

Connecting all exposed and extraneous conductive parts in an area, such as frames, pipes, cable trays and structural steel, so that the voltage between any two of them stays small during a fault. It does not prevent the fault, but it limits the touch voltage a person can experience until the protection clears it.

How often should earthing be tested?

At commissioning, after any change to the installation, and periodically as local rules and site policy require, often every one to five years depending on the risk. Measure electrode resistance, continuity of protective and bonding conductors, and earth fault loop impedance at the far ends of circuits. Test in the dry season, when soil resistance is highest.

This guide gives general principles. Earthing design must follow local regulations.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.

CallWhatsAppEnquire