Breaker Failure and Backup Protection Guide

What happens when a breaker does not open on a trip command, how breaker-failure schemes clear the fault through other breakers, and how backup protection is timed, tested and coordinated.

In short. Protection only works if the breaker opens. Breaker-failure protection detects that current is still flowing a short time after a trip command, and then trips the other breakers that feed the fault. Backup protection from upstream relays gives a second line if the primary protection or its breaker fails. Both should be designed in, set and tested, because a breaker that sticks closed turns a small fault into a large outage.

Who this page is for: For protection engineers and consultants on generator plants, main switchboards and critical facilities.

Key facts

  • Breaker failure starts timing when a trip is issued and current still flows.
  • Its time is set just longer than normal breaker clearing plus margin.
  • It trips the adjacent breakers that can feed the fault.
  • Remote backup from upstream relays is slower but independent.
  • Breaker failure needs a healthy DC supply and trip paths.
  • Test it by blocking a breaker and injecting a fault, with the incomers in test position or during a planned shutdown.

Why it matters

If a feeder breaker sticks closed during a fault, the fault continues until another device operates. That is often the main incomer after a long delay, which drops the whole board and lets the fault do more damage.

Worked example: breaker failure timing (illustrative)

ItemValue
Feeder breaker normal clearing timeabout 60 ms
Breaker-failure current detector resetabout 20 ms
Safety marginabout 70 ms
Breaker-failure time settingabout 150 ms
ActionTrip the incomers and bus coupler feeding the faulted section
Without breaker failureIncomer clears after its overcurrent delay of about 0.6 s plus its opening time, about three times longer

A test with the feeder breaker’s trip coil disconnected showed the breaker-failure output operating at about 155 ms and the incomers open at about 210 ms. See protection resilience.

Do not rely on the main incomer’s long delay as the only backup for a stuck feeder breaker. A dedicated breaker-failure function clears the fault several times faster and limits damage.

Local and remote backup

TypeHowSpeed
Breaker-failure (local)Same relay or bus scheme trips adjacent breakersFast
Remote backupUpstream relay’s own timingSlower, independent
Duplicate protectionTwo relays on separate CTs and DC suppliesFast, for critical plant

See DC control power and switchboard architecture.

Breaker-failure settings

Timing worked from the bottom up. A breaker that clears in 70 ms — 50 ms of mechanism plus 20 ms of arcing — needs its breaker-failure timer above that, plus the 20 ms the current detector takes to reset and a margin for both. 150 ms is the result, and the margin is what stops a healthy breaker being declared failed.

BreakerClearing timeBF timeBreakers trippedTested
Incomer ACB, 1600 A70 ms — 50 ms mechanism, 20 ms arcing150 msBus coupler and the generator breakerBlocked-breaker injection, 14 March
Bus coupler ACB, 1600 A70 ms150 msBoth incomersBlocked-breaker injection, 14 March
Generator breaker, 400 A60 ms140 msBus coupler, and the engine lockout at 300 msBlocked-breaker injection during a planned shutdown
Feeder 4 MCCB, 400 A25 msNo schemeRelies on remote backup: the incomer at 0.3 s on grid, and on generator supply nothing — 1044 A is below the incomer’s 1440 A long-time settingNot applicable
     
     

The fourth row is where breaker failure stops being a medium-voltage refinement and becomes a low-voltage problem. Remote backup is the usual answer on a feeder — let the incomer clear it, slowly, if the feeder breaker does not. That reasoning holds on grid supply and collapses on generator supply, because the incomer cannot see 1044 A at all. A stuck feeder breaker on generator leaves a fault connected with nothing upstream willing to act.

The fix on a board like this is not usually a breaker-failure scheme on every feeder. It is to bring the incomer’s long-time setting down to something the generator can reach when the set is the source, which the trip units on a modern board can switch automatically when they see the changeover. The 150 ms schemes above are worth their cost on the incomers and the coupler, where a failure disconnects the whole building.

Current check or breaker contacts?

Breaker-failure protection must decide whether the breaker has really opened. The usual method is a current detector: if current is still flowing when the timer expires, the breaker has failed. That works for faults, but some trips happen at low current: reverse power, loss of excitation, a trip on a lightly loaded set.

The current may be below the detector’s setting even though the breaker has failed to open. For those functions, the scheme should also use the breaker’s auxiliary contacts, so that a breaker still showing closed after the timer is treated as failed. Set the current detector low, commonly a fraction of rated current, and make sure it resets quickly once the current stops, or it adds to the timer.

Re-trip before backup trip

Many breaker failures are failures of one trip coil or one trip circuit, not of the breaker mechanism. A re-trip stage sends a second trip command, through a second coil or path where one exists, a few tens of milliseconds after the first, before the breaker-failure timer trips the neighbouring breakers. If the breaker opens on the re-trip, the outage is confined to the faulted circuit as intended. If it does not, the backup trip follows. Re-trip costs almost nothing in a numerical relay and saves many unnecessary wider outages.

Breaker failure on low-voltage boards

Low-voltage boards built with moulded-case and air circuit breakers with integral releases usually have no separate breaker-failure scheme; the trip unit and the mechanism are one device. Backup then comes from the next breaker upstream, whose time-current curve must still detect and clear the fault if the downstream breaker sticks. On a generator board, check that the generator breaker or the main incomer will detect a fault at the far end of each feeder on generator supply, where fault currents are lowest, because that is the case in which the backup has the least margin.

Worked example: will the upstream relay see the fault?

Remote backup only works if the upstream relay can see the fault it is backing up. Take a sub-board fed from the main board through a long cable. On generator supply the minimum fault at the sub-board might be about 2.1 kA. If the main incomer’s overcurrent pickup is set at 2.5 kA to ride above the board’s full load, it will never see that fault, and a sticking feeder breaker leaves the fault burning until something else fails.

Lowering the incomer pickup, adding a short-time element set below 2.1 kA, or using a voltage-restrained element that becomes more sensitive as the fault pulls the voltage down are the usual remedies. The check is simple arithmetic and is missed on many sites because it is never done for the generator case.

Which breakers the backup trip must open

A breaker-failure trip must open every breaker that can feed the fault through the failed one. On a single-bus generator board that means every generator breaker and any utility incomer on the same bus section; on a split bus, only those on the affected section, provided the bus coupler is also tripped where it could feed across. As the board changes, the list changes: a new generator or a new tie adds a breaker that the scheme must trip. Keep the list on the drawing and update the scheme whenever the board is extended.

Testing breaker failure without tripping the plant

  1. Isolate the backup trip outputs to the neighbouring breakers, and connect timers to them instead.
  2. Inject current above the detector setting and initiate a trip with the breaker held closed or simulated closed.
  3. Record the re-trip time and the backup trip time, and confirm both match the settings.
  4. Repeat with low current and the breaker contacts showing closed, for the low-current trip functions.
  5. Restore the outputs and confirm, with a check by a second person, that every isolation has been removed.

Common mistakes

  • No breaker-failure function on critical boards.
  • Time set too short, so it trips on normal clearing.
  • Adjacent breakers not wired to trip.
  • Never tested with a blocked breaker.

What to send us

Send the single-line diagram, breaker data and relay settings. WhatsApp 98852 01608 or use the application engineering enquiry.

Evidence note. Times are illustrative; breaker data and studies govern.

Breaker failure assumes the trip path works

A breaker-failure scheme watches for current still flowing after a trip command and then trips the breakers around it. That logic has a blind spot: it assumes the trip command reached the breaker. If the trip coil is open circuit, the DC supply has failed or the wiring is broken, the relay issues a trip, no current interruption follows, and the scheme fires correctly — but the real fault was in the path, and the same path may be shared by the backup.

Three consequences for the design:

The timing margin deserves one note as well. Setting the breaker-failure timer too close to the clearing time produces a scheme that occasionally trips the whole bus because a healthy breaker was 20 ms slow on a cold morning. Setting it too long leaves the fault connected while the timer runs. The 150 ms above is the sum of measured breaker time, detector reset and a deliberate margin — all three measured on the actual equipment at commissioning, because a figure taken from a catalogue is a figure for a new breaker in a factory.

Questions engineers ask

Why use breaker contacts as well as current in breaker failure?

Because some trips happen at low current. Reverse power, loss of excitation or a trip on a lightly loaded set may leave current below the breaker-failure current detector even though the breaker has not opened. Adding the breaker auxiliary contacts for those functions means a breaker still showing closed when the timer expires is treated as failed, whatever the current.

What is a re-trip stage?

A second trip command to the same breaker, through a second coil or path where one exists, sent a few tens of milliseconds after the first and before the breaker-failure timer trips the neighbouring breakers. Many failures are of one trip coil or circuit rather than the mechanism, so a re-trip often opens the breaker and keeps the outage confined to the faulted circuit.

Is breaker failure needed on LV boards?

On most LV boards, backup comes from the upstream device tripping after its own delay. Critical boards, generator buses and boards where that upstream backup is slow or absent on generator supply benefit from a dedicated breaker-failure scheme, which trips the next breakers in a fraction of a second when one breaker fails to open.

What is the typical timer?

The breaker normal opening time, plus the time for the current-check element to reset, plus a safety margin. With a 60 ms breaker, a 20 ms reset and a 50 ms margin, about 130 ms. Take the opening time from timing tests on the actual breakers, and keep the timer short enough that the backup trip still limits damage.

Does backup protection replace maintenance?

No. Breaker-failure protection limits the consequence of a breaker that sticks; it does not make the breaker less likely to stick. Regular operation, mechanism lubrication, timing tests and trip-coil checks keep the breakers reliable, and the backup scheme catches the rare failure that maintenance does not prevent.

How can I test it safely?

Use the relay test mode, or isolate the trip outputs at test blocks, and simulate a stuck breaker by keeping current or the breaker-closed signal present after the trip command. Confirm the backup trip appears at the right time and goes to the right breakers, then restore the outputs and prove them separately. Never test by trying to make a real breaker fail.

This guide gives general principles. Scheme design needs project data.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.