In short. A 250 kVA generator delivers 348 A per phase at 415 V, three-phase, at 0.8 power factor — which is 200 kW and 150 kVAr. At 400 V the same set delivers 361 A and at 433 V it delivers 333 A, because current rises as voltage falls for the same kVA. The figures below are the starting point for the breaker, the cables and the changeover switch; the page then works through what actually decides a set of this size, which is rarely the current.
Quick answers for a 250 kVA set
- Full-load current at 415 V: 348 A per phase
- Real power at 0.8 PF: 200 kW
- Reactive power at 0.8 PF: 150 kVAr
- Usual breaker frame: 400 A, set above 348 A
- Per kVA at 415 V: about 1.39 A, so 250 × 1.39 ≈ 348 A
All figures are at the rated power factor of 0.8 and assume a three-phase, four-wire set. Always confirm against the nameplate of the actual machine.
Full-load current at each supply voltage
| Supply voltage | Full-load current (A) | Against 415 V | Where it applies |
|---|---|---|---|
| 380 V 3-phase | 380 | +9.2% | Older and some imported equipment |
| 400 V 3-phase | 361 | +3.8% | Nominal European voltage; many nameplates |
| 415 V 3-phase | 348 | reference | Standard Indian LV supply |
| 433 V 3-phase | 333 | −4.2% | No-load and lightly loaded alternator setting |
The pattern is the one every engineer uses as a sanity check: for the same kVA, current and voltage move in opposite directions. Nothing about the machine changes between these rows — only the voltage it is connected at.
How the 348 A is worked out
For a three-phase set the full-load current is
I = kVA × 1000 ÷ (√3 × V)
With 250 kVA at 415 V:
- √3 × 415 = 1.732 × 415 = 718.78
- 250 × 1000 = 250,000 VA
- 250,000 ÷ 718.78 = 348 A
The kW and kVAr follow from the power factor rather than from the formula: 250 × 0.8 = 200 kW of real power, and 250 × 0.6 = 150 kVAr of reactive power. Power factor does not appear in the current calculation at all, which is the part that catches people out: a set delivers 348 A at its rated kVA whatever the power factor of the load, but the kW it can deliver at that current changes completely.
What a 250 kVA set is used for
The 250 kVA set is the one we rent and sell more than any other. It carries a mid-size commercial building, a hospital block, a cluster of bank branches on one feeder, a small manufacturing unit, or a construction site through its heavy months. It is the size at which a building stops thinking about a generator as an appliance and starts treating it as part of the electrical design.
Reading the 348 A figure properly
348 A is the figure that decides the switchgear. It puts the set on a 400 A frame, past the point where a single small cable will do, and into the range where the run length starts to govern the cable rather than the current. A 250 kVA generator is almost never connected at medium voltage: the transformer would cost more than the set.
Standby, prime or continuous: the same set, three different figures
A nameplate reading 250 kVA does not say how long the set may hold it. The international rating definitions separate three duties, and the same machine carries a different figure in each:
| Duty | What it allows | Typically for this machine | Current at 415 V |
|---|---|---|---|
| Standby | Mains failure only, limited hours a year, no overload | 250 kVA, 200 kW | 348 A |
| Prime | Unlimited hours at a varying load | about 225 kVA, 180 kW | about 313 A |
| Continuous | Unlimited hours at a constant load, base load duty | about 175 to 200 kVA | about 243 to 278 A |
The percentages differ between manufacturers and between engines, so the figures in the third and fourth columns are the usual pattern rather than a specification: prime is commonly around 90% of the standby rating and continuous around 70 to 80%. What governs is the nameplate of the actual set and the engine maker’s own rating sheet.
This is where two quotations for “a 250 kVA set” can describe different machines. If one is a standby rating and the other a prime rating, the second is the larger engine and the honest comparison is between the duties, not between the plates. Ask which duty the figure belongs to before comparing anything else.
What the site does to the 348 A
Published ratings are quoted at reference conditions. Real plant rooms in Telangana and Andhra Pradesh are hotter than the reference, often higher than sea level, and sometimes short of cooling air, and every one of those reduces what the engine will deliver.
- Ambient temperature. The air entering the engine and the radiator is what counts, and in a closed plant room in May it can be well above the outside shade temperature.
- Altitude. Thinner air means less oxygen per stroke. Most of our region is low enough for this to be small, but it is not always zero.
- Air restriction. Undersized louvres, a dirty radiator or a long exhaust run with too many bends all show up as lost output, and they are the commonest cause on sets that used to carry the load and no longer do.
A derate in the region of 5 to 10% is common once a set is installed in regional summer conditions, which would take this machine from 250 kVA to somewhere between 225 and 238 kVA, and the current at 415 V from 348 A to between 313 and 331 A. Those are illustrative figures to show the size of the effect; the engine manufacturer publishes a derating curve for the actual engine, and that curve is what a design should use.
The practical consequence is the margin. A load that comes to 190 kW against a 200 kW plate looks like a 5% margin on paper and can be no margin at all on a hot afternoon.
Worked example
A hospital block has 168 kW of measured demand at 0.85 power factor, and the largest motor is a 30 kW chiller motor started direct on line.
- Load in kVA: 168 ÷ 0.85 = 197.6 kVA.
- Engine check: 168 kW against the set’s 200 kW gives 84% loading — acceptable for standby, tight for daily running.
- Current: 197.6 × 1000 ÷ (1.732 × 415) = 275 A, against the set’s 348 A.
- Starting check: a 30 kW motor at 0.86 PF and 0.92 efficiency draws about 37.9 kVA running, and roughly 6.5 times that direct on line, so about 246 kVA of starting demand on top of the running load.
- With 0.22 per unit transient reactance, holding the dip to 15% needs about 307 kVA for the start alone.
So the running load fits a 250 kVA set and the start does not. Either the chiller gets a star-delta or soft starter, or the set goes up to 320 kVA. This is the single most common reason a 250 kVA quotation turns into a 320 kVA order.
Choosing between one 250 kVA set and two smaller sets
| Question | Points to one 250 kVA set | Points to two smaller sets |
|---|---|---|
| Is any single motor above about 25 kW? | Yes — one larger set holds the dip better | No |
| Does the load ever drop below 30% for hours? | No | Yes — one set can rest while the other runs loaded |
| Can the building lose power for a maintenance window? | Yes | No — two sets allow one to be serviced |
| Is plant room space tight? | Yes — one canopy, one exhaust, one tank | No |
| Is the budget for switchgear limited? | Yes — one breaker, no synchronising panel | No |
Three or more answers in the right-hand column and the paralleling panel usually pays for itself in fuel and engine life within a few years of daily running.
Common mistakes with a 250 kVA set
- Sizing on running load and forgetting the start. The worked example above is the rule, not the exception: at this size the largest motor decides the set more often than the total load does.
- Quoting 250 kVA as 250 kW. It is 200 kW at 0.8 power factor. A 220 kW load needs the next rating, whatever the kVA figure suggests.
- Leaving the set at 30% load for weeks. A 250 kVA set carrying 60 kW will wet stack. Either put real load on it with a load bank occasionally, or rent a smaller set for the quiet period.
What to send us
If you are deciding whether a 250 kVA set is the right size, these five things let us answer properly rather than guess:
- Maximum demand in kW and the power factor it was measured at — both, not one. Against this set the limits are 200 kW and 250 kVA, and which one binds depends entirely on the power factor.
- The largest motor, its rating, and how it is started: direct on line, star-delta, soft starter or variable speed drive.
- The supply voltage on the nameplate — 380, 400, 415 or 433 V. It changes the current from 333 A to 380 A across that range for the same set.
- The route from the set to the panel: length, whether it is tray, trench, duct or conduit, and the ambient temperature it runs through.
- How the set will be used: standby for a few hours a month, prime power for shifts, or continuous. The same machine carries different ratings for each.
Next step: work your own load through the generator kVA and kW sizing calculator, check the largest motor against the set, then send an enquiry with the five items above and we will confirm the rating in writing.
Questions engineers ask
How many amps is a 250 kVA generator at 415 V?
348 A per phase at 0.8 power factor, which is 200 kW, worked out as 250 times 1000 divided by 1.732 times 415. At 400 V it is 361 A and at 433 V it is 333 A. That current sets the generator breaker, usually a 400 A frame, and the cable, which is then checked for route length and grouping.
What size breaker does a 250 kVA generator need?
A 400 A frame is the usual choice above the 348 A full load current. The setting has to sit above the largest motor start and below what the alternator can sustain into a fault, which is a coordination question rather than a chart lookup, and the breaker must also carry a short circuit rating to suit the fault level at the board.
Will a 250 kVA generator start a 30 kW motor?
Direct on line, usually not without a voltage dip beyond 15%: the start asks for about 307 kVA from a set with 0.22 per unit reactance. With star-delta or a soft starter it is comfortable. The motor starting calculator works this out for your own motor and reactance.
What is the fuel consumption of a 250 kVA generator?
At 75% load a set this size burns in the region of 41 litres an hour, and at full load about 52. The figure moves with the engine, its age and the site conditions, so use the fuel calculator with your own datasheet figure rather than a rule of thumb.
Full-load current at other ratings
- 5 kVA — 7.0 A at 415 V
- 7.5 kVA — 10.4 A at 415 V
- 10 kVA — 13.9 A at 415 V
- 12.5 kVA — 17.4 A at 415 V
- 15 kVA — 20.9 A at 415 V
- 20 kVA — 27.8 A at 415 V
- 25 kVA — 34.8 A at 415 V
- 30 kVA — 41.7 A at 415 V
- 40 kVA — 55.6 A at 415 V
- 45 kVA — 62.6 A at 415 V
- 50 kVA — 69.6 A at 415 V
- 62.5 kVA — 87.0 A at 415 V
- 75 kVA — 104 A at 415 V
- 82.5 kVA — 115 A at 415 V
- 100 kVA — 139 A at 415 V
- 125 kVA — 174 A at 415 V
- 320 kVA — 445 A at 415 V
- 750 kVA — 1043 A at 415 V
- 1010 kVA — 1405 A at 415 V
- 1250 kVA — 1739 A at 415 V
- 1500 kVA — 2087 A at 415 V
- Every rating from 7.5 to 3000 kVA — the full chart
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 13 November 2026.