In short. A good power HMI shows the plant’s state at a glance and helps operators decide under stress. It needs a clear single-line mimic with true topology, consistent symbols, restrained colour that keeps red for abnormal, safe two-step command confirmation and direct links to alarms. The test is simple: can a tired operator at 3 am understand what is live, what is dead and what to do, within seconds?
Who this page is for: For control engineers, SCADA designers and operations managers specifying or reviewing operator screens for power systems.
Key facts
- Four screen levels: overview, area, equipment and diagnostic.
- Draw the single-line diagram with true topology so power flow can be traced.
- Use colour for abnormal states; keep normal screens mostly grey.
- Show live and dead buses clearly, by colour or line style.
- Commands need select-then-execute confirmation and show interlock status.
- Test screens with operators in realistic upset scenarios.
Screen hierarchy
| Level | Shows |
|---|---|
| Overview | Whole plant: sources, buses, key loads, mode and readiness |
| Area | Generator plant, UPS, distribution, battery |
| Equipment | One generator or breaker in detail |
| Diagnostic | Trends, events, sequences, interlock status |
Worked example: redesigning an overview screen (illustrative)
| Before | Problem | After |
|---|---|---|
| Bright colours for every running motor and breaker | Alarms lost in the colour | Normal states grey; colour only for abnormal |
| Mimic drawn to fit the screen, not the switchboard | Operators traced the wrong feed | True topology matching the single-line diagram |
| Generator not ready shown only on its own page | Missed during an outage | Readiness and mode for every set on the overview |
| One-click breaker commands | An accidental open | Select, show interlocks, then execute |
In a drill afterwards, operators identified a failed generator start and the affected bus in under 10 seconds, against more than a minute before.
Do not allow one-click breaker operation from an HMI. Use select-then-execute, show the interlock and permissive status, and log every command with the user and time.
Mimic rules
- True topology, so power flow can be traced.
- Live and dead bus status by colour or line style.
- Consistent symbols for breakers, sources and loads.
- Restrained colour; abnormal stands out.
- Mode and readiness shown for every source.
- Direct link from each alarm to its equipment screen.
See alarm rationalisation, interlocks and permissives and SCADA.
HMI review sheet
| Check | Pass? | Note |
|---|---|---|
| Overview shows all sources, modes and readiness | ||
| Mimic matches the single-line diagram | ||
| Colour reserved for abnormal | ||
| Commands use select-then-execute |
Worked example: a restrained colour scheme (illustrative)
| State | How it is shown | Why |
|---|---|---|
| Normal equipment and values | Shades of grey, dark text | A healthy plant looks calm |
| Live bus | Thick dark line | Power flow can be traced without colour |
| Dead bus | Thin or dashed line | Distinguishable in black and white and by colour-blind operators |
| Warning or low-priority alarm | Amber with a shape marker | Visible but not urgent |
| Trip or high-priority alarm | Red with a shape marker and text | Reserved, so it always means act now |
| Bad or stale data, unknown position | A distinct colour such as magenta, or hatching | Operators must never mistake a guess for a fact |
Colour should never carry meaning alone. Red-green colour deficiency is common, often cited at around one man in twelve, so every alarm also has a shape and text, and live and dead buses differ in line style as well as colour.
How fresh the screen must be
| Item | Typical target |
|---|---|
| Breaker status change on screen | Within about 1 s |
| Analogue values such as kW and voltage | About every 1 to 2 s |
| New alarm in the banner | Within about 1 s |
| Calling up a new screen | Within about 2 s |
These targets set requirements back through the system: polling rates, network design and server sizing. An HMI that takes ten seconds to show a tripped breaker will be distrusted, and operators will start walking to the switchboard instead.
Showing what the system does not know
A breaker has two auxiliary contacts, one for open and one for closed. If both say open, both say closed or neither changes after a command, the position is unknown, and the mimic must say so with a distinct symbol, never by guessing from the last command. The same applies to measurements: when a device stops answering, its values should turn to a stale-data style at once, not freeze at their last reading. An HMI that shows a confident picture built on missing data is more dangerous than one that admits the gap.
A command dialog that prevents mistakes
- The operator selects the device; the dialog names it in words as well as showing it on the mimic.
- The dialog shows the interlocks and permissives, with any that block the command highlighted.
- The operator chooses the action and confirms; the dialog times out after about 30 s if not confirmed.
- The result is shown from the feedback, not the command: the breaker symbol changes only when the auxiliary contacts confirm.
- Every command is logged with user, time, device and result.
Getting to any screen quickly
An operator should reach any equipment screen from the overview within about three clicks, and from any alarm straight to the equipment that raised it in one. A fixed navigation bar showing the four levels, overview, area, equipment and diagnostic, keeps the operator oriented, and a back button that returns to the previous screen matters more under stress than any graphic.
Trends that answer questions
Trends should open with fixed, sensible scales, for example bus frequency from 47 to 53 Hz rather than an automatic scale that makes a 0.05 Hz wobble look like a crisis. Show events such as breaker operations and alarms as markers on the time axis, so a voltage dip can be read against the motor start that caused it. Pre-built trend groups for each generator, the bus and each incomer save operators building them during an upset.
The local panel and the control room
| Aspect | Local HMI at the panel | Control room HMI |
|---|---|---|
| Scope | One panel or set | Whole plant |
| Depends on the network | No | Yes |
| Used for | Local operation, maintenance, fall-back | Supervision, coordination, routine operation |
| Design | Same symbols and colours as the control room | Same symbols and colours as the panels |
Using one symbol and colour standard on both means an operator who moves from the control room to the panel during an emergency does not have to learn a second language at the worst moment.
Testing screens with operators
Before handover, give operators realistic scenarios on the real screens, a failed generator start, a feeder trip, a mains failure with one set unavailable, and time how long they take to understand and act. Note where they hesitate or look in the wrong place, change the screens and test again. The worked example above shows the size of the gain: understanding fell from over a minute to under ten seconds. It is the cheapest reliability improvement a power plant can make.
The alarm banner and summary
A banner across every screen should show the newest and highest-priority unacknowledged alarms, with their priority, time and a one-click link to the equipment. A separate alarm summary lists all active alarms, filterable by area and priority, with the operator action for each alarm available from the list. Shelving, to temporarily suppress a nuisance alarm, must be time-limited, logged and visible, so a shelved alarm is never forgotten. See alarm rationalisation.
What the overview screen must show
- Every source with its state: mains healthy or failed, each generator available, running, on load or locked out.
- Every main breaker and tie with its confirmed position.
- Bus voltage and frequency, and which buses are live.
- Total load and the reserve against the reserve rule.
- The control mode of the plant and of each set, with anything not in AUTO highlighted.
- Fuel hours remaining and battery state where a battery is fitted.
- A count of active alarms by priority.
If an operator glancing at the overview cannot answer whether the plant could survive losing its largest running set right now, the overview is missing something.
Training on the screens
A simulator or training mode that drives the real screens from recorded or modelled data lets operators practise upsets without touching the plant. Rehearsing a mains failure with a failed start, or a black start, on the real screens is the best preparation for the night it happens, and it shows designers where the screens confuse people before an incident does.
Keeping the screens true over the years
Plants change: feeders are added, breakers replaced and loads moved. Each change must update the mimic, the point list and the alarm list together, checked against the single-line diagram, and be tested on the screen before the equipment is put in service. Assign an owner for the HMI as for any other plant system, and review the screens against the drawings at least once a year. A mimic that has drifted from the switchboard teaches operators to stop trusting it.
Write a site HMI standard
A short written standard, a few pages covering symbols, colours, line styles, fonts, units, number formats, navigation and the command dialog, keeps every screen consistent as different engineers and vendors add to the system over the years. Give it to every supplier at the start of a project and check new screens against it before acceptance. Consistency is what lets an operator read a screen they have never seen before as easily as one they use every day.
Numbers and units on the screen
Show every value with its unit, a sensible number of decimals and a consistent format across all screens: kilowatts without decimals for a plant of several megawatts, frequency to two decimals, voltage to the nearest volt. Too many digits suggest a precision the instrument does not have and make values harder to compare at a glance. Where a value has limits, show them beside it, or show the value as a bar against its range, so an operator sees at once whether 412 V is comfortable or close to a trip. Small details like these decide whether a screen is read correctly in two seconds or misread in twenty.
Common mistakes
- Colourful normal screens that hide alarms.
- Mimic topology that differs from the switchboard.
- One-click commands.
- Screens never tested with operators.
What to send us
Send screenshots of your current screens and the single-line diagram. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. The before-and-after results are illustrative.
Questions engineers ask
What colours should a power HMI use?
Mostly greys for normal equipment, so a healthy plant looks calm; amber for warnings; red reserved for trips and urgent alarms; and a distinct colour such as magenta for stale data or unknown positions. Never rely on colour alone: give alarms a shape and text, and show live and dead buses by line style, because red-green colour deficiency is common.
How should an HMI show a breaker whose position is unknown?
With its own distinct symbol, never a guess from the last command. If both auxiliary contacts say open, both say closed, or neither changes after a command, the position is unknown and the mimic must say so. The same applies to measurements from a device that has stopped answering: show them as stale at once rather than freezing the last value.
Should the HMI copy the physical panel?
No. It should follow the single-line diagram and the operating logic, with true topology so power flow can be traced from source to load. A mimic drawn to match cabinet layout, or to fit the screen, leads operators to trace the wrong feed under stress. Use the same symbols and colours on the panel HMI and the control room screens.
How many colours?
As few as possible, each with one consistent meaning. A healthy plant should look mostly grey, with amber for warnings, red only for trips and urgent alarms, and one distinct colour for bad data. Every colour used for state also needs a shape or text, so the screen still works for colour-blind operators and in poor lighting.
Can operators trust the mimic?
Only if every state shown comes from confirmed feedback, unknown and stale states are shown as such, and screens update within about a second of a change. A mimic that shows the last command instead of the breaker contacts, or freezes values when a device stops answering, will mislead operators exactly when it matters.
Do I need a local HMI at the panel?
Yes. When the control room, servers or network fail, operators must still be able to see and operate each generator and breaker at the switchboard. The local HMI should not depend on the network and should use the same symbols and colours as the control room, so moving between them in an emergency needs no relearning.
This guide gives general principles. Confirm with human-factors review.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.