In short. Protection coordination arranges the breakers and relays between the generator and the loads so that a fault trips the nearest device first and leaves the rest of the system running, with the upstream device as backup. On generator supply this is harder than on the grid because the fault current is lower, decays within cycles, and changes direction when a generator is added to a utility-fed board. Settings correct for the transformer are not automatically correct for the generator.
What coordination is trying to achieve
Every protective device has two jobs that pull against each other. It must operate fast enough to protect the cable, busbar or machine in its zone, and wait long enough for a downstream device to clear a fault that is not in its zone.
Selectivity is the result when both hold across the system: a fault at a motor terminal trips the motor feeder, not the MCC incomer, the PCC incomer or the generator breaker. The objective is not tidy curves; it is a system that fails in the smallest possible piece. The general method is set out in protection coordination and selectivity; the points below are the ones specific to generator-fed systems.
Generator fault current is not utility fault current
A utility transformer feeds a bolted fault with a current that holds steady until it is cleared. A synchronous alternator does not. In the first two or three cycles the current is limited by the subtransient reactance and reaches six to ten times rated current.
Over the next tenth of a second or so it falls to the transient value, perhaps three to five times rated, and within a second it settles at the synchronous value, which for a self-excited machine without short-circuit support can fall below rated current. Machines with a permanent magnet generator or a short-circuit maintenance circuit hold around three times rated current for several seconds specifically so that downstream protection can operate.
I″ = Irated / X″d
I″ is the initial symmetrical fault current, Irated the alternator rated current and X″d the saturated subtransient reactance in per unit. Worked example (illustrative): a 1000 kVA, 415 V set with X″d of 0.12 has a rated current of about 1391 A and an initial fault contribution of about 11,600 A, falling to roughly 4200 A sustained with excitation support.
A 1250 A feeder breaker with an instantaneous pickup set at ten times, 12,500 A, would never see the generator’s current at all; it would clear the fault only on its long-time curve, seconds later, or not before the generator’s own protection took the whole plant down. The decay is explained under generator fault current and the alternator data behind it under alternator reactances and short circuit.
Zones and the device that should clear each fault
| Fault location | Device that should clear it | Backup | Generator-specific concern |
|---|---|---|---|
| Motor terminals | Motor feeder breaker or fuse | MCC incomer | Low current at the end of a long cable may sit below the instantaneous pickup |
| MCC bus | MCC incomer | PCC feeder breaker | Motor contribution adds to a reduced source contribution |
| PCC bus | Generator breaker | Generator relay, engine shutdown | Decaying current must still reach the breaker’s short-time pickup |
| Generator cable or terminals | Generator breaker via generator relay | None downstream; excitation trip | Differential protection on larger machines |
| Earth fault anywhere | Earth-fault element on nearest device | Generator neutral CT | Return path depends on neutral and ATS pole arrangement |
Time grading with a decaying source
Coordination is done on time-current curves, each upstream device operating later than the one below it at the same current. Between numerical relays a grading margin of 0.3 to 0.4 seconds is usual; between electronic trip units, 0.1 to 0.2 seconds. On generator supply there is a limit to how many grading steps can be stacked, because the generator relay, and ultimately the alternator thermal withstand, caps the time the fault may persist.
Three or four levels of selectivity are realistic in a generator-fed plant; six are not. Where that is not enough, zone-selective interlocking, in which a downstream breaker tells its upstream neighbour to hold off, buys selectivity without adding time. The curve work is covered in time-current coordination engineering.
Minimum fault current matters more than maximum
On utility supply designers check that equipment withstands the maximum fault. On generator supply the more frequent failure is the opposite: not enough current reaches the far end of a long feeder for the protection to recognise a fault. The check is the earth-fault loop impedance for each final circuit, with the generator as the source and the current taken after decay, against the pickup of the protecting device. If the feeder sized for voltage drop under cables and distribution does not deliver enough fault current, the remedies are a larger conductor, a more sensitive earth-fault element or a device with a lower instantaneous setting.
Two sources, two setting groups
A board that is fed by the utility transformer most of the time and by the generator during outages needs protection that works in both cases. A numerical relay solves this with setting groups: one group calibrated to utility fault levels, another to generator fault levels, switched by an auxiliary contact from the ATS or generator breaker. Electronic trip units without setting groups must be set to a compromise that is verified against both sources.
Adding a generator to an existing board also changes direction: the generator incomer now feeds fault current into a bus that previously saw it only from the transformer, so directional elements and the fault rating of the board itself must be reviewed, and earthing and neutral architecture must be revisited because the earth-fault return path changes with the source.
The generator’s own protection in the scheme
The generator relay or controller provides voltage-restrained overcurrent, whose pickup falls as terminal voltage collapses, plus reverse power, voltage and frequency elements, loss of excitation and, on larger sets, differential and negative-sequence protection. These sit at the top of the ladder and must be slower than every downstream device for through faults, yet fast enough to protect the alternator. The function set is explained under generator protection relay architecture. An engine shutdown on low oil pressure or high temperature is not protection coordination and must not be delayed by it.
Related photographs and videos
Worked example: grading on a 500 kVA generator board (illustrative)
A 500 kVA set at 415 V gives a full-load current of about 696 A. Its board has an 800 A air circuit breaker on the generator incomer and outgoing feeders protected by moulded case breakers, the largest rated 250 A. For a fault on that feeder, the feeder breaker must trip first and the incomer must wait. The incomer short-time pickup and delay are set so that it stays closed while the feeder breaker clears the fault, typically with a grading margin of a few hundred milliseconds between their curves.
The generator adds a complication: its fault current falls after the first few cycles as the alternator field decays, unless the excitation supports it. The feeder breaker instantaneous setting must therefore operate on the reduced current the set can sustain, which may be only around three times its full-load current. The study checks both the grid case and the generator case.
A settings schedule
| Device | Settings recorded |
|---|---|
| Generator incomer | Long-time, short-time pickup and delay, instantaneous, earth fault |
| Feeder breakers | Rating, long-time, instantaneous |
| Generator protection relay | Overcurrent, reverse power, under and over voltage and frequency |
| Mains incomer | As agreed with the utility |
Proving the settings
Secondary injection of electronic trip units and relays confirms that each device trips at its setting. The applied settings are photographed or downloaded and compared with the schedule, because a correct study is useless if the dial on site was left at the factory value.
When to review coordination
Review settings when a generator is replaced or added, a transformer changes, large new feeders are added or a trip occurs that took out more than it should have. Each review updates the schedule and the single-line diagram.
Keeping the old and new settings side by side in the schedule, with the reason for each change, lets later engineers understand why the protection is set as it is.
Common mistakes
- Copying the utility-mode breaker settings into generator operation. Downstream faults are cleared by the generator breaker, or by the engine stalling, and the whole plant goes dark for a single motor fault.
- Setting instantaneous pickups above the generator’s decayed fault current. The breaker cannot see the fault it is meant to clear.
- Stacking too many grading steps under a generator. The upstream device is forced to wait longer than the alternator can withstand.
- Ignoring the earth-fault loop on long feeders. An earth fault at a remote pump persists as a shock hazard because no device reaches its pickup.
What to send us
Send the single-line diagram, the alternator data sheet showing X″d and X′d, the make, frame and trip-unit type of every breaker between generator and loads with their present settings, the utility transformer rating and impedance, and the cable sizes and lengths of the main feeders. Photographs of trip-unit dials will do where settings sheets do not exist. Use the application engineering enquiry page.
Questions engineers ask
How is grading set between a generator incomer and its feeders?
The feeder breaker must clear its own fault while the incomer waits. In the illustrative 500 kVA board, the 800 A incomer short-time pickup and delay are set so its curve stays a few hundred milliseconds above the 250 A feeder breaker curve, in both grid and generator cases.
Why can generator fault current fail to trip breakers?
Alternator fault current falls after the first few cycles as the field decays, unless excitation supports it, and may settle around three times full-load current. Breaker instantaneous settings chosen for grid fault levels may not operate, so settings are checked against the sustained generator current.
What should a protection settings schedule contain?
Every device with its settings: generator incomer long-time, short-time, instantaneous and earth fault; feeder breaker ratings and settings; generator relay overcurrent, reverse power, voltage and frequency functions; and mains incomer settings agreed with the utility, with the reason for any change and the date it was made, kept with the single-line diagram.
How are protection settings proved on site?
Secondary injection of electronic trip units and relays confirms each device trips at its setting, and the applied settings are photographed or downloaded and compared with the schedule, because a correct study is useless if a device on site was left at its factory value.
Why does a fault on one feeder trip my whole generator?
Because the generator breaker or the generator relay operated before the feeder device. Either the feeder’s instantaneous setting is above the current the generator can deliver, so the feeder waits on its thermal curve, or the generator protection is faster than the feeder at that current. A coordination study with generator fault levels, not utility levels, identifies which.
Does my generator need a PMG or short-circuit excitation support?
If downstream protection relies on current above about three times rated for a second or more, yes. A plain self-excited AVR loses its supply as terminal voltage collapses and the fault current fades below the pickup of most breakers. A PMG or a current-boost circuit keeps the field supplied so the alternator sustains roughly three times rated current for long enough for protection to operate.
Do I need a new coordination study when I add a generator to an existing switchboard?
Yes. The generator adds a second source with a different fault level and a different direction of current flow at its incomer, and it may change the earthing arrangement. At minimum the board’s fault rating, the incomer and coupler settings, and the earth-fault protection must be rechecked for generator-supplied operation.
What grading margin should I use between breakers on generator supply?
Between electronic trip units with defined short-time delays, 0.1 to 0.2 seconds per step is typical; between numerical relays, 0.3 seconds. The constraint is the total: the sum of the steps must stay below the time the alternator can carry the fault current, which the manufacturer’s thermal withstand curve defines.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 19 October 2026.