Integrated Power Systems: Transfer, Paralleling and Distribution

How generators connect to a power system: ATS and AMF transfer, synchronising, load sharing, switchgear, protection, earthing and redundancy.

In short. A generator only protects a site if it is correctly connected to everything around it. Integrated power covers that connection: how the load transfers from mains to generator (ATS or AMF), how several sets synchronise and share load, the LV and MV switchgear and transformers between source and load, protection and earthing, monitoring, and the redundancy level (N+1 or 2N) the site needs. Most generator failures in service are failures of this integration, not of the engine.

Where to start

If your question is… Start with
The generator must start and take load automatically on mains failure AMF Panels
Choosing an automatic transfer switch type Automatic Transfer Switches
Running two or more generators together Generator Paralleling
Sharing load correctly between paralleled sets Generator Load Sharing
Deciding how much redundancy the site needs N+1 Power Architecture
Planning the whole system from first principles Integrated Power System Design Guide

All 22 guides in this section

How the parts of an integrated power system fit together

An integrated generator system is more than a set and a cable. It is a chain of layers, and each layer must be designed with the others in mind. The table maps each layer to the guides in this section.

LayerWhat it decidesGuides to read
SourcesHow many sets, what rating, what redundancyN+1, N+N and 2N, system design guide
TransferHow the load moves between mains and generatorATS, AMF panels, generator-to-generator transfer
ParallelingHow several sets share one busParalleling, synchronising panels, load sharing, master controls
DistributionHow power reaches the loadsLV and MV switchgear, PCC and MCC, transformers, cables and busbars
Protection and earthingHow faults are cleared safely and selectivelyProtection coordination, earthing and neutral
Controls and monitoringHow the system is supervised and recordedLoad management, SCADA, BMS and DCIM
Grid interfaceWhether and how sets run with the utilityGenerator-grid paralleling, utility paralleling

Worked example: one set or two in parallel

Consider an illustrative plant with an essential load of 720 kW at 0.8 power factor, which is 900 kVA. Three arrangements can be compared:

The right answer depends on what one failure would cost the plant. The example shows why sources, paralleling, load management and protection have to be decided together rather than one at a time.

A sound design sequence

  1. Classify loads into critical, essential and non-essential, and record their sizes and starting duty.
  2. Choose the redundancy level from the cost of an outage, not from habit.
  3. Select set ratings and numbers, checking motor starts and step loads, not only steady kW.
  4. Choose the transfer method for each load group: open, closed, delayed or bypass-isolation transfer.
  5. Decide whether sets run in parallel, and define synchronising, load sharing and shedding.
  6. Design distribution, protection coordination and earthing as one study, including every operating mode.
  7. Define controls, alarms and monitoring, then write the commissioning and periodic test plan.

Where integrated systems usually go wrong

Most failures in integrated systems happen at the interfaces, where one supplier scope ends and another begins. Typical examples include:

What a complete design package should contain

A complete package lets any competent engineer understand, build, test and later modify the system. It should include the load schedule, single line diagram, operating mode descriptions, protection settings with coordination curves, earthing arrangement, control philosophy with signal lists, cable schedules, the commissioning test plan with acceptance criteria, and a periodic test and maintenance plan. When a package is complete, the system can be expanded years later without guesswork.

Operating modes to prove before handover

An integrated system has to work in every state it can reach, not only in the normal one. Each mode below should be tested at commissioning with the real loads, or with a load bank where the real loads cannot be risked, and repeated after any major change:

ModeWhat should happenWhat to check
Mains failureSets start, reach rated voltage and frequency, and take the load in planned blocksStart and transfer sequence, block load steps, voltage and frequency dips
One set fails while on loadRemaining sets carry the essential load, with shedding if neededShedding order, overload protection, alarms
Mains returnsLoad retransfers after the mains has proved stable, then sets cool down and stopRetransfer delay, transition type, cool-down run
Test on loadSets carry the site load while mains is healthy, without risking the supplyReturn to mains if a set trips during the test
Maintenance on one setRemaining sets cover the load with the serviced set isolatedIsolation, interlocks, redundancy still met

Writing these modes down before design begins also tells each supplier exactly what their panel must do.

Choosing where to begin in this section

Begin with the system design guide if the project is new, because it sets the order of decisions. For an existing site, begin with the layer that is causing trouble: transfer guides for changeover problems, paralleling and load sharing guides for sets that do not share load evenly, and protection and earthing guides for nuisance trips or unexplained earth fault alarms. Each guide links to the layers next to it, so a problem can be followed across the interfaces where it usually starts.

Questions engineers ask

What are the main layers of an integrated generator power system?

Sources, transfer, paralleling, distribution, protection and earthing, controls and monitoring, and the grid interface. Each layer must be designed with the others in mind, because a choice in one, such as the number of sets, changes what the transfer, protection and control layers must do.

Is it better to use one large generator or two smaller sets in parallel?

It depends on what one failure would cost. One large set is simplest. Two sets share load efficiently at night but may need load shedding if one fails at full load. Three sets in N+1 cover any single failure without shedding, at the cost of more equipment, space and controls.

Where do integrated power systems most often fail?

At the interfaces between supplier scopes: neutrals bonded at more than one point, protection checked only on mains fault levels, loosely defined control signals between panels, and operating modes that were never tested, such as one set failing on load or mains returning during a test.

Which operating modes should be tested before handover?

Mains failure, the failure of one set while on load, mains return and retransfer, testing on load while mains is healthy, and maintenance with one set isolated. Each mode should be tested with real loads or a load bank, recorded, and repeated after any major change to the system.

What is the difference between an ATS and an AMF panel?

An ATS is the switch that moves the load between mains and generator. An AMF panel adds the logic that senses the mains failure, starts the generator, transfers the load and returns it when mains is restored. Many sites use an AMF panel that controls an ATS or a pair of interlocked breakers.

When do generators need to be paralleled?

When one set cannot carry the load, when the site needs N+1 redundancy, or when load varies widely and running fewer sets at light load saves fuel. Paralleling needs synchronising controls, load sharing and protection designed together. The switchgear must also be rated for the combined fault level, and the scheme is tested on load with one set tripped to prove the rest carry the load.

Engineering content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. For advice on your own site, send us your requirement or call 98852 01608.