Ports & Marine Power

Generator engineering for ports, terminals, shipyards and harbours, covering crane transients, reefer loads, conveyor restarts, long cable runs and corrosion.

In short. At a port, power does not stop at the generator terminals; it must survive the journey through salt, moisture, distance and heavy, dynamic loads. Cranes impose rapidly changing and regenerative demand, reefer yards are large steady loads with pull-down peaks, conveyors restart loaded, and shipyard welding is nonlinear. Size the plant on transients and restoration, specify enclosures and switchgear for a marine atmosphere, and check the cable runs for voltage drop at the far end.

The port power chain

A port or terminal on the Andhra Pradesh coast, a container freight station inland or a shipyard is electrically a chain: grid supply, substation and transformers, medium and low voltage distribution, normal and emergency switchgear, the generator plant, and then a long reach of cable to cranes, pumps, reefer points, terminal buildings, lighting masts, security, IT, workshops and sometimes vessels alongside. Each link is exposed to a marine atmosphere and to continuous operation. Port power engineering is therefore the sum of load, transients, distribution, environment, protection and continuity, and a generator chosen on kVA alone fails at one of the other five.

Start with operations rather than equipment. Which operations cannot stop, which can shut down safely, which loads are safety-related, which need UPS ride-through, which can be shed, and how long the facility must run without the grid. The answers differ between a container terminal, a bulk terminal, a shipyard, a fishing harbour with ice plants and a temporary marine construction site, and the critical-load register that results is the input to everything else. The method is on critical-load classification.

Load types that behave unlike ordinary industry

LoadElectrical characterWhat it does to a generatorEngineering response
Quay and yard cranesRapid cycles of hoist, lower, travel; regenerative on loweringLarge swings in kW and kVAr; reverse power on loweringSize on crane cycle data; confirm braking resistors or regenerative handling
Reefer container pointsMany motors, steady average with pull-down peaksHigh base load, diversity neededMeasured diversity per terminal; staged energisation
Bulk conveyorsLarge motors, often loaded at restartStarting torque far above normalSequenced restart downstream to upstream; starter review
Pumps (ballast, dredge, fire, drainage)Direct-on-line starts against existing headHigh inrushSoft start where possible; sequence
Shipyard weldingIntermittent, nonlinear, high peaksAverage kW misleads; harmonic heatingSize on peak coincidence; alternator for nonlinear duty
High-mast lightingDischarge or LED drivers, switched in banksInrush on energisationStagger bank switching
Terminal operating systemsServers, gate systems, radioCannot tolerate the transfer gapUPS with generator behind

Cranes

Crane rated power is not the generator requirement. A ship-to-shore crane may be rated at over a megawatt, but its demand over a cycle swings from a large positive peak during hoisting to a negative value during lowering as the drives regenerate.

A diesel plant cannot absorb that energy and will trip on reverse power unless the crane’s braking resistors are active or the plant always carries enough other load to absorb the regeneration. Rubber-tyred gantry cranes, whether diesel-electric or electrified, have the same behaviour on a smaller scale. Actual crane electrical data and the operating cycle are required; a steady-state kVA figure is not adequate. Dynamic response is covered on generator transient response.

Reefers

A reefer yard is the most constant large load in a container terminal. Each refrigerated container draws a few kilowatts on average and considerably more during pull-down after plugging in or in high ambient, and a yard of several hundred slots adds up to a megawatt-class load that must be held through any outage to protect cargo. The design value is the measured coincident demand of the terminal, with staged re-energisation of reefer banks after transfer so that the pull-down peaks do not coincide.

Conveyors and post-outage recovery

A normal start and a post-outage recovery are different events. After an outage, bulk conveyors may be loaded with material, pumps face an existing hydraulic condition, and cranes are mid-cycle. Restoration of a conveyor network typically proceeds from the discharge end upstream, each belt proven running before the next is started, following the plant’s own control philosophy. The generator must be sized for the loaded restart of the largest belt, not its running load. Starting methods are compared on motor starting on generators.

Distance and voltage drop

Port sites are large, and generator output may travel hundreds of metres to a crane rail, a reefer block or a berth. Voltage drop then becomes a design variable in its own right, because a motor at the far end that sees a depressed voltage draws more current, starts more slowly and may stall.

ΔV = √3 × I × L × (R cos φ + X sin φ)

In this expression ΔV is the line-to-line voltage drop in volts, I is the load current in amperes, L is the one-way cable length in kilometres, R and X are the cable resistance and reactance in ohms per kilometre, and cos φ is the load power factor.

For a 300 A load at 0.85 power factor over 250 metres of 240 square millimetre copper cable with R of about 0.1 and X of about 0.08 ohms per kilometre, ΔV is roughly 1.73 × 300 × 0.25 × (0.085 + 0.042), about 16 volts or 4% of 415 V at full load, and several times that during a direct-on-line start (illustrative). Cable values must be taken from the manufacturer’s data for the installation method and temperature. The screening method is on voltage drop and cable sizing.

Environment, enclosures and temporary distribution

Salt-laden air, humidity, spray and sun attack everything on a quay. Generator enclosures and switchgear should have a marine-grade coating system, corrosion-resistant fasteners and hinges, sealed cable entries, and an ingress protection rating suited to the exposure, with air intakes positioned and filtered to limit salt reaching the radiator and alternator. Radiators and windings need inspection at shorter intervals than inland.

Where the power is temporary, the source is mobile but the physics are not: temporary cables experience transport, coiling, rain, sunlight, diesel and oil contamination, abrasion from vehicles and repeated connection, and should be inspected, insulation-tested, identified, protected by ramps or trays and re-inspected through the hire. Earthing and bonding of temporary distribution on a wet quay deserve a deliberate design rather than a single rod. Practical guidance is on rental cables and distribution and acoustic and weatherproof enclosures.

Reefer yard sizing (illustrative)

Refrigerated containers are the most time-sensitive port load. A yard with 120 reefer points needs a supply that covers realistic simultaneous demand, not the nameplate of every container.

ItemWorkingResult
Average reefer demandTypical running draw in hot weatherAbout 5 to 7 kW each
Occupied points120 points, about 80% occupied at peak96 containers
Simultaneous demand96 × about 6 kW, with diversityAbout 460 to 580 kW
Restart after outageContainers restarted in groupsAvoids a block step from all units together
GeneratorRunning kVA plus margin and restart stepsAbout 800 to 1000 kVA, often as paralleled sets

The real figure is confirmed from the yard’s metering in the hottest month. Diversity matters: containers cycle their refrigeration, so they rarely all draw full power at once, unless they all restart together after an outage.

Salt, humidity and enclosures

Port air carries salt that corrodes enclosures, terminals and radiators. Sets for port use need corrosion-resistant enclosures and coatings, sealed terminal boxes, radiators suitable for coastal air, and anti-condensation heaters in alternators and panels. Inspection is more frequent than inland: terminals are checked for corrosion, enclosures for paint damage, and radiators rinsed of salt deposits.

Service in marine conditions

On our standard, oil and filters are changed every 250 to 500 running hours or six months, whichever comes first, and coolant is replaced every year. In marine conditions the coolant inhibitor level and the condition of exposed metalwork are checked at every visit, and insulation resistance on alternators is tested more often, because moisture and salt attack windings faster than inland.

Long distances across the terminal

Port loads are spread over large areas: crane rails, reefer blocks, workshops, gates and lighting towers. Feeding distant loads from one generator position at 415 V can give large voltage drops, so far-end motors fail to start. Ports either place sets close to the major load groups, or distribute at higher voltage with local transformers. Voltage is measured at the furthest load with the yard running, not only at the generator terminals.

Cranes on generator power

Container cranes draw large, rapidly changing loads and can return energy to the supply when lowering. On a generator, that regenerated energy has nowhere to go unless the crane drive dissipates it in braking resistors, or other loads absorb it. Before a crane is put on generator supply, the crane maker confirms how regeneration is handled, and the set is sized for the hoisting peaks.

Common mistakes

What to send us

Send the critical-load register or operating model for the facility, the single-line diagram with cable lengths to the main load centres, crane electrical data and duty cycles where cranes are included, the number of reefer points and measured yard demand, conveyor and pump ratings with starter types, the required autonomy, and the exposure of the proposed generator location. For temporary marine work, include the site layout and the planned duration. Send your port or marine power requirement.

Questions engineers ask

How is a reefer yard generator sized?

From realistic simultaneous demand, not the nameplate of every container. Around 96 occupied points at about 6 kW each in hot weather gives roughly 460 to 580 kW with diversity, so about 800 to 1000 kVA, often as paralleled sets, with containers restarted in groups after an outage. Yard metering in the hottest month confirms it.

Why do container cranes need special checks on generator supply?

Cranes draw large, rapidly changing loads and return energy to the supply when lowering. On a generator that regenerated energy has nowhere to go unless the crane drive dissipates it in braking resistors or other loads absorb it, so the crane maker confirms how regeneration is handled and the set is sized for the hoisting peaks.

Can a diesel generator run a container crane?

Yes, when it is sized on the crane’s cycle data rather than its rating, when the regenerative energy on lowering is absorbed by braking resistors or by other load on the bus, and when the governor and voltage regulator can follow the rapid swings. Crane electrical data and operating cycle are essential inputs.

How much generator capacity does a reefer yard need?

Enough for realistic simultaneous demand in the hottest month, with diversity, plus margin for restarting containers in groups after an outage. Around 96 occupied points can need roughly 460 to 580 kW, so about 800 to 1000 kVA, confirmed from the yard metering in the hottest month rather than from container nameplates.

What enclosure specification suits a port?

A corrosion-resistant enclosure and coating, sealed terminal boxes, radiators suitable for coastal air, and anti-condensation heaters in alternators and panels. Inspection is more frequent than inland, with terminals checked for corrosion, paintwork repaired and radiators rinsed of salt deposits at each visit, so corrosion is caught long before it causes a failure.

Why do far-end motors fail to start on the generator?

Because voltage drop in long cables adds to the dip from the generator during starting, so the motor terminal voltage falls too far. Sets placed closer to load groups, larger or parallel cables, or distribution at higher voltage with local transformers solve it, after measuring voltage at the far end.