Generator Cable Size Calculator

How to size the cable between a diesel generator and the switchboard: design current, derating, voltage drop, fault withstand, neutral and earth conductors.

In short. A generator feeder cable passes three checks, not one. It must carry the generator’s full-load current after derating for ambient temperature, grouping and installation method; it must keep voltage drop within the allocation for the circuit, including during motor starting; and it must withstand the fault current until protection clears. The neutral, earth conductor and terminations are sized with it. Current alone, read from a kVA figure, is a starting point and never a specification.

Start from the design current

I = S × 1000 ÷ (√3 × VLL)

I is the full-load line current in amperes, S is the generator rating in kVA, and VLL is the line-to-line voltage in volts, 415 V for Indian low-voltage sets. For single-phase sets the divisor is simply the line-to-neutral voltage of 230 V. Worked example (illustrative): a 500 kVA set gives 500,000 ÷ (1.732 × 415), or about 696 A. The feeder is sized for the generator’s rated current rather than the connected load, because the set may one day carry its full rating, and many designers add a margin above it.

Keep that cable margin separate from the generator’s own limits: a standby rating normally carries no overload allowance, and any short-term overload on a prime rating must be confirmed from the maker’s data for the selected set and duty. The generator current guide tabulates the arithmetic for common ratings.

Generator ratingFull-load current at 415 V, three phaseTypical arrangement (illustrative, copper XLPE)
125 kVA174 AOne 3.5-core 95 or 120 mm²
250 kVA348 AOne 3.5-core 240 mm² or two 3.5-core 120 mm²
500 kVA696 ATwo or three 3.5-core 300 mm², or single cores in trefoil
1000 kVA1391 AFour to five parallel runs of single-core 400 mm², or busduct
1500 kVA2087 ABusduct is usually the better answer

The right-hand column shows the scale only; the actual size depends on the derating factors and the route, and a cable schedule is produced from the manufacturer’s current ratings for the installation method in question.

Derating for the real installation

Published current ratings under IS 7098 for XLPE and IS 1554 for PVC assume a reference ambient, typically 40 °C in air and 30 °C in ground, a single circuit, and a stated installation method. Each departure applies a factor. A generator room at 50 °C reduces an XLPE rating by roughly 10%; six circuits touching on a tray reduce it by 25 to 30%; cables buried in hot, dry soil with a thermal resistivity above the assumed 1.5 K·m/W derate further.

The factors multiply, and it is not unusual for a cable to deliver only 60% of its tabulated rating on a crowded tray through a hot room. Aluminium conductors, common for large feeders on cost grounds, need about 1.6 times the copper cross-section for the same current and require bimetallic lugs at copper terminals. Parallel runs must be identical in length, size and routing so that they share current equally, and single-core cables in parallel are laid in trefoil groups with each group containing all three phases to limit reactance and armour heating.

Voltage drop and motor starting

A cable that carries the current comfortably can still deliver poor voltage at the far end. Common Indian practice limits total drop from source to the final load to about 3 to 5%, and the generator feeder is usually allocated 1 to 2% of that so that the distribution beyond it has room. The check that is most often missed is motor starting: a motor drawing six times its full-load current during direct-on-line starting produces six times the steady-state drop in the feeder, which adds to the generator’s own transient dip.

A 2% feeder becomes a 12% feeder for a few seconds, the motor sees perhaps 75% voltage, and its starting torque, which falls with the square of voltage, is barely half of nominal. The method and an example are in voltage drop, and the generator side of the same problem is in motor starting.

Fault withstand and protection

S = If × √t ÷ k

S is the minimum conductor cross-section in square millimetres, If is the fault current in amperes, t is the clearing time of the protection in seconds, and k is a constant for the conductor and insulation, about 143 for copper XLPE, 94 for aluminium XLPE and 115 for copper PVC. Worked example (illustrative): if the generator feeder can also be energised from the utility side with a prospective fault current of 25 kA cleared in 0.2 seconds, the minimum copper XLPE section is 25,000 × 0.447 ÷ 143, or about 78 mm², which the feeder easily exceeds but a small control or earth conductor on the same bus might not.

On the generator side the fault current is different in character: the subtransient contribution is typically 6 to 10 times rated current for the first cycles, decaying to a sustained value of about 2.5 to 3 times rated with PMG excitation and far less without it. Instantaneous elements set for utility fault levels may never see a generator fault, and the cable must then survive the longer clearing time of a thermal or overcurrent element. The study method is in fault current and protection coordination.

Neutral, earth and terminations

The neutral is sized full size, not reduced, wherever the load contains single-phase electronic equipment, because third-harmonic currents add in the neutral and can exceed the phase current. The earth conductor between the generator frame, the neutral earthing point and the switchboard is sized under IS 3043 to the fault current and clearing time, and the neutral-earth link location is decided once, in accordance with the switching arrangement, as explained in earthing and neutral grounding. At the alternator terminal box, check that the number and size of lugs fit the palms, that single-core cables enter through a non-magnetic gland plate, and that there is space to form the bends without stressing the terminals. Rental and temporary feeders use flexible cables with mechanical protection, ramps at crossings and connectors rated for the current, as described under temporary power cables.

Related photographs and videos

Cable engineering.
Cable protection and earthing coordination.

Two costs the cable schedule does not show

The method above takes a design current, applies the corrections for the real installation, and checks volt drop and fault withstand. Two parts of that method are routinely done in a way that looks complete and is not, and both are clearer as pictures than as rules.

Corrections multiply

Each correction factor for ambient, grouping, installation method and soil is a fraction of the cable’s reference capacity, and where several apply they multiply. The commonest error is to apply the largest one and stop, which is how a feeder in a hot, crowded tray ends up sized for only one of the two conditions it actually meets.

What cable derating costs before any cable is chosenCurve of the reference capacity a cable must have, as a multiple of the load current, against the combined correction factor. One correction of 0.87 needs 1.15 times the load; two corrections multiplying to 0.57 need 1.75 times. Correction factors multiply together rather than being applied one at a time. 1.00 0.90 0.80 0.70 0.60 0.50 Combined correction factor (every correction multiplied together) 1.0 1.2 1.4 1.6 1.8 2.0 Capacity needed, as a multiple of the load one correction: 0.87 needs 1.15x two corrections together: 0.87 × 0.65 = 0.57 needs 1.75x What derating costs, before any cable is chosen Correction factors multiply together, and the capacity to start from is the load current divided by their product.
Chart C03. The reference capacity a cable must have, as a multiple of the load current, against the combined correction factor. Corrected capacity is the reference capacity times the product of every correction that applies, so the capacity to look for is the load current divided by that product. The two marked points are illustrative factors, not a schedule for any installation.

Read the two marked points. One correction of 0.87 asks for 15% more cable than the load. Two corrections together, 0.87 for a hot room and 0.65 for a crowded tray, multiply to 0.57 and ask for 75% more. For the 348 A of a 250 kVA set that is a cable rated 611 A before correction — and a schedule that applied only the grouping factor would have chosen one rated 535 A, a size short, with nothing in the drawing to reveal it.

Joints make heat out of sight

A cable can be correctly sized along its whole length and still fail at one end, because the termination is a resistance in series with the load, and heat there goes as the current squared.

Heat produced in a single electrical jointCalculated heat in one connection against joint resistance from 10 to 200 microhms, at 348 amps and at 696 amps, the full-load currents of a 250 kVA and a 500 kVA set at 415 volts. A 500 kVA set at full load through a joint of 100 microhms produces 48 watts in that one connection. 10 25 50 100 200 Joint resistance (microhms) 0 20 40 60 80 100 Heat produced at the joint (W) a 500 kVA set at full load, through a joint of 100 microhms: 48 W in one connection 348 A 696 A A joint you cannot see, making heat you can Calculated loss in a single connection. Microhms are small; the current squared is not.
Chart T01. Heat produced in one connection, P = I²R, against joint resistance from 10 to 200 microhms, at 348 A and 696 A, the full-load currents of a 250 kVA and a 500 kVA set at 415 V. A heat figure, not a temperature and not an acceptable-resistance limit.

At full load on a 500 kVA set, a joint of 100 microhms dissipates 48 W in one connection, concentrated in a few square centimetres of contact and insulated by the lug, the gland and the panel around it. Double the resistance, which a loosening or an oxidising contact does without any visible change, and the heat doubles; double the current and it quadruples. That is why the joints on a generator feeder fail before the cable does, and why they fail at the end of a long full-load run rather than at the start.

Both charts point at the same discipline. The schedule records the cable; it should also record every correction factor applied and why, and every termination’s tightening torque and who made it. A feeder that was right on paper and wrong in service is almost always a factor that was not multiplied in, or a joint that was never torqued to a figure, and both are invisible once the panel door is shut.

Common mistakes

What to send us

Send the generator rating and voltage, the route length and how the cable will be installed, the ambient temperature along the route, how many other circuits share the tray or trench, the switchboard’s fault level and protection settings, the largest motor started direct-on-line, and the load mix. A sketch of the route with the terminal box and switchboard positions helps. Send your application details and we will prepare the cable schedule with the derating, voltage-drop and fault checks shown.

Questions engineers ask

Do cable correction factors add or multiply?

They multiply, and applying only the largest one is the commonest cable sizing error. A hot room at 0.87 and a crowded tray at 0.65 together give 0.57, so a 250 kVA set’s 348 amps needs a cable rated about 611 amps before correction. Using the grouping factor alone would have chosen a cable rated about 535 amps, a size short, with nothing on the drawing to show it.

Why do generator feeder terminations fail before the cable does?

Because a termination is a resistance carrying the full current, and its heat goes as the current squared. At full load on a 500 kVA set, a joint of 100 microhms makes 48 watts in a few square centimetres, insulated by the lug and the panel around it. A loosening or oxidising contact raises the resistance without any visible change, which is why joints fail at the end of a long full-load run. Record the torque on every termination.

What cable size is needed for a 250 kVA generator?

The full-load current is about 348 A at 415 V. Depending on route, ambient and grouping that is typically a single 3.5-core 240 mm² copper XLPE cable or two 120 mm² cables in parallel, before the voltage-drop and fault checks. The schedule should be produced from the manufacturer’s ratings for the actual installation.

Can aluminium cable be used for a generator feeder?

Yes, and it is common above about 95 mm². It needs roughly 1.6 times the copper cross-section, bimetallic lugs at copper terminals, and care with termination torque and creep. Alternator terminal boxes sometimes lack space for the larger lugs, so check before ordering. Torque is rechecked after the first months.

Should the generator feeder be rated for the generator or the load?

For the generator’s full rated current, because the set can be loaded to its rating and the cable should not be the element that limits or overheats first. The downstream distribution is then sized for its own loads. Then check voltage drop for the route length.

Why is a half-size neutral not acceptable on generator feeders?

Because modern loads are rich in single-phase electronic equipment whose third-harmonic currents add arithmetically in the neutral. A reduced neutral can carry more than the phase conductors and overheat. Full-size neutrals are the norm, and oversized neutrals are specified where the harmonic content is severe.