Automotive Manufacturing Power

Generator design for automotive plants, shop by shop: paint shop continuity, welding unbalance, press shop safe stops, robot controllers on UPS and sequencing.

In short. An automotive plant is several factories under one roof, and each shop fails differently when power is lost. Paint shops need continuity for ovens and air supply, body shops impose pulsing welding loads with poor power factor, press shops have large flywheel motors, and assembly depends on conveyors and robot controllers. Generator power is designed shop by shop, from the restoration sequence and the real load study, rather than from one plant-wide kVA figure.

One plant, several load characters

Vehicle and component plants, and the tier suppliers around them, combine process areas whose electrical behaviour has little in common. The press shop draws steady power into flywheels and then hits the supply with short, heavy torque demands. The body shop runs hundreds of resistance spot-welding guns, each pulling tens of kVA for a fraction of a second at a power factor that can be below 0.5, often across only two phases.

The paint shop is a continuous thermal process with large air supply units, ovens, pre-treatment pumps and regenerative thermal oxidisers that cannot simply be switched off and on. Assembly is conveyors, torque tools, test rigs and the automation network. A generator proposal that treats all of this as one load number will be wrong for every shop at once.

ShopLoad characterContinuity priorityGenerator consideration
Press shopLarge motors, flywheel energy, high inrushLow; stop safely, restart laterUsually excluded from standby; safe-state hydraulics only
Body shopPulsed welding, low PF, unbalance, robotsMedium; robots must hold position and recoverRobot controllers on UPS; welding rarely on generator
Paint shopContinuous ovens, ASUs, pumps, oxidisersHigh; stopped bodies are scrapped or reworkedLargest standby block, staged restart, long autonomy
Assembly and testConveyors, tools, PLCs, end-of-line rigsMedium to highControls on UPS, conveyors in sequence
UtilitiesMotors, chillers, cooling towers, water treatmentHigh; everything depends on themFirst loads restored, motor starts staged

The paint shop usually sets the standby capacity

When supply fails mid-cycle, bodies in the electro-deposition tank, the ovens and the spray booths are at risk. Pre-treatment and e-coat circulation pumps must keep running to prevent settling and uneven coating, booth air supply must be maintained to keep the pressure cascade and solvent concentration safe, and ovens must be held or brought down in a controlled way.

Many plants therefore put the paint shop’s circulation, air handling, oven controls and oxidiser on the essential bus and accept that spraying stops. These loads are large motors on fans and pumps, mostly on VFDs, with several hundred kW of restart stepping in over a few minutes. The generator is sized from that staged restart, as described in generator sizing, and the autonomy is set by how long the plant will wait for the DISCOM rather than by tank size.

Controlled shutdown versus continuity

The plant has to decide, shop by shop, whether the generator provides production continuity or a controlled stop. A controlled stop for the press and body shops needs a fraction of the power that continuity would. Writing this decision down before sizing is the most useful step in the project.

Welding, unbalance and power factor

Spot welding is a difficult load for any source. Each weld is a pulse of high current at low power factor, frequently single-phase or two-phase, and a body shop produces thousands of them per hour at random phase positions. On the DISCOM supply the transformer and grid impedance absorb this. On a generator the negative-sequence current from unbalanced welding heats the rotor damper windings, and the reactive pulses make the AVR work continuously.

Alternators have a stated limit for continuous negative-sequence current, and sustained welding on a generator should be checked against it. Most plants keep welding off the standby bus and protect only the robot controllers, safety PLCs and the cell network on UPS so that the line can recover position when supply returns. Where welding must run on generator, the set is oversized and the guns are balanced across phases deliberately. See voltage unbalance and negative sequence.

kVA_demand = Σ(P_connected × f_utilisation × f_coincidence) / PF_avg

Here P_connected is the installed kW of each load group, f_utilisation the fraction of rating at which it actually runs, f_coincidence the probability it runs at the same time as the others, and PF_avg the expected power factor of the mix.

A worked example (illustrative): a paint shop utility block with 900 kW of connected fan and pump motors, running at 0.75 utilisation and 0.85 coincidence at a power factor of 0.88, presents about 900 × 0.75 × 0.85 / 0.88, close to 650 kVA of running demand. Measured load profiles from the plant’s energy meters are far better than assumed factors, and we ask for them before quoting; see load study.

Automation, robots and the network

A modern line runs on PLCs, safety controllers, robot controllers, Ethernet switches and manufacturing execution servers, small loads that cannot tolerate even the ten seconds of a generator start. If they drop, robots lose their program position, conveyors lose tracking of which body is where, and recovery can take hours even after power returns. They belong on UPS, with the UPS input on the generator bus so it carries them through a long outage. The same applies to the compressed air instrumentation that many robot grippers and clamps depend on. See no-break, short-break and long-break architecture.

Architecture, prime duty and testing

Large plants distribute at 11 kV or 33 kV with shop substations at 415 V, so the generator plant is often medium voltage with paralleling switchgear feeding an essential bus, or a group of LV sets dedicated to the paint shop and utilities. Tier suppliers with 1 to 5 MW of demand typically run several LV sets in parallel. Where the DISCOM applies load relief or the feeder is weak, the sets may run daily and must carry a prime rating and a fuel contract to match.

New engines up to 800 kW must meet CPCB IV+, which affects fuel quality requirements and aftertreatment service. Before the plant relies on the system, each set should be load bank tested and the shop restoration sequence run as a transfer test with production, recording the lowest voltage and frequency and any controller that faulted. The multi-set design questions are covered in paralleling and multi-DG capacity and N+1 studies.

Why the paint shop sets the capacity (illustrative)

A car plant’s paint shop holds bodies in ovens and booths that must be kept within temperature and airflow limits, or the bodies in process are scrapped. Its essential loads usually set the standby capacity.

LoadPurposeDemand
Booth air supply and exhaust fansAirflow and solvent safety450 kW
Oven circulation fans and burner controlsHold oven conditions or cool safely220 kW
Pre-treatment and electrocoat circulation pumpsKeep baths mixed and in specification160 kW
Conveyors to clear bodies from ovensAvoid overbaked bodies80 kW
Controls, IT and lightingSafe operation and records60 kW
Total970 kW

That is about 1210 kVA at 0.8 power factor before margin and motor starts, so two paralleled sets of about 1010 kVA, or a larger single set with a reserve plan, are typical for this scope alone.

Welding on generator supply

Resistance welding draws heavy single-phase pulses that unbalance the generator and cause voltage dips. Body shop welding is therefore rarely carried on standby supply. Where some welding must continue, welders are spread across phases, the alternator is selected with margin for unbalance, and the dip at each weld is checked so robots and controls on the same supply are not disturbed.

Prime duty, testing and service

Some plants run generators for hours every day because of grid limits, which makes them prime rather than standby. On our standard, oil and filters are changed every 250 to 500 running hours or six months, whichever comes first, and coolant is replaced every year. Plants running sets daily reach the hour limit within weeks, so services are scheduled around production shifts, and load tests confirm that the paint shop scope can still be carried as the plant grows.

Robots, PLCs and the plant network

Robots, PLCs and the plant network lose position, data and synchronisation if their supply breaks even briefly. They are placed on UPS so they ride through the transfer to generator, and their controllers are brought back in a defined order so lines restart safely. The generator then carries the UPS input and recharge, while the UPS keeps the automation stable through the dips caused by motor restarts on the same supply.

Common mistakes

What to send us

Send the single-line diagram with shop substations, the metered demand profile for each shop or feeder, the paint shop and utilities motor list with starting methods, and the list of controllers and networks that must be on no-break supply. State for each shop whether you want continuity or a controlled stop, and how many hours of autonomy you need. Send your application details and we will reply with a shop-by-shop restoration sequence for review.

Questions engineers ask

Why does the paint shop usually set the generator size in a car plant?

Bodies in ovens and booths are scrapped if temperature and airflow are lost, so booth fans, oven circulation and burner controls, bath circulation pumps, conveyors to clear the ovens and controls must run. In the example on this page that is about 970 kW, roughly 1210 kVA before margin, more than any other protected area.

Why are robots on UPS when the plant has a generator?

Robots, PLCs and the plant network lose position, data and synchronisation if their supply breaks even briefly, and the generator needs seconds to take load. The UPS rides them through the transfer and through the dips caused by motor restarts, while the generator carries the UPS input and recharge.

Which parts of a car plant normally run on the generator?

Usually the paint shop essentials, controls and IT, safety systems, critical utilities and lighting. Body shop welding and press lines normally wait for the grid. The paint shop booths, ovens and bath circulation typically set the standby capacity, because bodies in process are scrapped if they stop.

Can resistance welding run on a diesel generator?

It can, but heavy single-phase welding pulses unbalance the generator and cause voltage dips, so it is rarely carried on standby supply. Where some welding must continue, welders are spread across phases, the alternator has margin for unbalance, and dips are checked against the robots and controls on the same supply.

Why do robots need UPS if there is a generator?

Because they lose position, data and synchronisation if their supply breaks even briefly, and the generator needs seconds to take load. The UPS carries them through the transfer and through dips from motor restarts, while the generator carries the UPS input and recharge for the rest of the outage.

How long should the paint shop be able to run on diesel?

Long enough to clear or protect the bodies in process and bring baths, booths and ovens to a safe state, which the plant defines from its own process. Plants with long or frequent outages may run the paint shop for hours, so fuel and servicing are planned for that duty.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 19 October 2026.