In short. Temporary power cables are sized on four checks, not one: the derated current-carrying capacity at site ambient and grouping, the voltage drop over the actual route length, the short-circuit withstand until the protective device clears, and the mechanical duty of a cable that is dragged, coiled and driven over. Flexible copper cable with a tough rubber sheath, laid on a protected route with proper terminations, is what makes a rental generator useful at the load end.
Why cable decides the outcome of a rental job
A generator can hold 415 V at its terminals all day while a pump 150 metres away sees 370 V and will not start. The cable between them has resistance and reactance, and under load that impedance drops voltage and dissipates heat. On rental jobs the cable is chosen under time pressure, the route is longer than planned, and the same drums have been to twenty sites before, so cables deserve the same attention as the generator. The broader method is set out in generator cable sizing; what follows is the temporary-power application of it.
The four checks
Design current and derated capacity
Begin with the real load current, not the generator rating. For a three-phase load, I = kVA × 1000 / (√3 × 415). The published current rating of a cable assumes a reference ambient, typically 30 or 40 degrees Celsius, and a single cable in free air.
In a Telangana summer the air on a site can be 45 degrees Celsius, cables lie in the sun or bunched together, and each of those conditions reduces the permitted current. Derating factors of 0.8 to 0.9 for ambient and a further 0.7 to 0.8 for grouping are common, so a cable that carries 300 A in the catalogue may safely carry only 200 A on site.
Voltage drop
Vd = √3 × I × L × (R cos φ + X sin φ)
Here Vd is the line-to-line voltage drop in volts, I the load current in amperes, L the one-way route length in kilometres, R and X the cable resistance and reactance in ohms per kilometre, and cos φ the load power factor. For a 120 mm² copper flexible cable, R is about 0.19 ohm per kilometre and X about 0.08 ohm per kilometre (illustrative, confirm against the manufacturer’s data).
A 200 A load at 0.85 power factor over 120 metres gives Vd ≈ 1.732 × 200 × 0.12 × (0.19 × 0.85 + 0.08 × 0.53) ≈ 8.5 V, or about 2% of 415 V, which is acceptable. Double the length and halve the conductor and the drop approaches 8%, which is not. A 5% total limit to the furthest load is a sound working target, with motor starting checked separately because starting current can be six times running current for a few seconds. See voltage drop and motor starting.
Short-circuit withstand
During a fault the cable must carry the fault current without its insulation exceeding its short-circuit temperature until the breaker opens. The adiabatic check I²t ≤ k²S² applies, where S is the conductor area in mm² and k is 115 for PVC-insulated copper and 143 for XLPE or EPR copper. Rental generators produce limited fault current, but a long clearance time, which is common with generator supply because the fault current is low, can still damage a small cable. Protective device and cable are chosen together.
Mechanical and environmental duty
Permanent cables sit still. Rental cables are unrolled, pulled around corners, driven over, left in standing water during the monsoon and exposed to diesel at the generator end. Heavy-duty flexible copper cable with an elastomeric sheath, often referred to as trailing or welding-grade cable, survives this; PVC-sheathed building wire does not. Where vehicles cross the route, use cable ramps or bury the cable in a protected trench. Keep cables off hot exhaust components and away from the generator’s radiator discharge.
Single-core, parallel conductors and current sharing
Above roughly 300 to 400 A per phase, rental practice is to run several single-core cables per phase, because one conductor large enough would be impossible to handle. Parallel cables share current equally only if they are the same size, length and construction, with the same contact resistance at the lugs. Clamp each conductor during commissioning; one carrying 30% more than its partners has a loose termination or a longer route and will overheat first. Single-core AC cables must be laid in trefoil or a flat symmetric formation so the magnetic fields cancel, and never individually enclosed in steel.
| Generator rating at 415 V | Full-load current | Typical temporary feeder (illustrative) |
|---|---|---|
| 125 kVA | 174 A | 1 × 4-core 70 mm² copper flexible |
| 250 kVA | 348 A | 1 × 4-core 185 mm² or 2 × 95 mm² single-core per phase |
| 500 kVA | 696 A | 2 × 185 mm² or 3 × 120 mm² single-core per phase |
| 1000 kVA | 1391 A | 4 × 240 mm² single-core per phase, plus neutral |
The table is a starting point for short runs at moderate ambient; length, grouping and derating change the answer.
Neutral and earth conductors
A three-phase four-wire temporary system needs a neutral sized for the actual unbalance and harmonic content. Where the load is mostly single-phase or non-linear, the neutral should be the same size as the phase conductors.
The protective earth conductor runs with the power cables from the generator earth terminal to every panel and must be large enough to carry fault current until the protection trips; a separate earth cable of at least half the phase conductor area is typical on temporary systems, with a full-size conductor for the smaller feeders. The generator frame, the panel enclosures and the site electrode are all bonded. Details are in earthing and neutral grounding.
Routing, protection and inspection on site
Plan the route on the site drawing before the drums arrive, avoiding lifting zones, vehicle gates, hot-work areas and planned excavations. Elevate cables on hooks or stands so they stay out of water and away from feet, and use ramps or a covered trench at road crossings. Terminate every cable in a gland or connector. Inspect every shift for cuts, crushing and hot connectors, and run an insulation-resistance test before each new deployment, because damage from the last site is often invisible. Panels and connectors are covered in temporary distribution panels.
Sizing a temporary feeder (illustrative)
A 320 kVA set feeds a factory board 80 metres away at its full rating. The current is 320,000 ÷ (1.732 × 415), about 445 A. The table shows how the four checks decide the cable.
| Check | Working | Decision |
|---|---|---|
| Current capacity | About 445 A continuous, laid on the ground in summer heat | Two 120 mm² copper conductors per phase, or one 300 mm² where handling allows |
| Voltage drop | Two 120 mm² per phase over 80 metres at 445 A | About 1.5%, within limits |
| Fault withstand | Conductors protected by the generator breaker for the generator fault level | Breaker setting checked against cable withstand |
| Earth and neutral | Full-size neutral where single-phase or harmonic loads are present | Neutral equal to phase; earth sized for fault current |
Each figure is confirmed from the cable maker’s data for the actual conductor and installation; the table shows the order in which the checks are made.
Inspecting cables at every deployment
- Walk the whole length and look for cuts, crushing, kinks and heat damage on the sheath.
- Check every connector and lug for discolouration, cracks, loose pins and corrosion.
- Test insulation resistance between conductors and to earth before connecting.
- Confirm phase identification at both ends so phase rotation is correct.
- After the first hours on load, check connector temperatures by hand-held thermometer or thermal camera.
Rental cables are bent, coiled, transported and laid again and again, so their condition changes far faster than that of fixed cables. A cable that passed last month is not assumed to pass today.
Routing in public and working areas
Where people or vehicles cross a cable route, the cable is protected by ramps rated for the traffic, or routed overhead with proper supports, never left loose on a path. Routes avoid standing water and hot surfaces, are kept clear of sharp edges, and are marked so that excavation or vehicle movement does not damage them. At each end, cables are supported so the weight does not hang on the terminals.
Harmonics and the neutral
Where the load includes many single-phase electronic devices, such as computers, LED lighting and UPS units, third harmonic currents add up in the neutral instead of cancelling. The neutral can then carry as much current as a phase, or more. Temporary cables for such loads therefore use a neutral at least equal to the phase conductor, and the neutral current is measured once the load is running.
Common mistakes
- Sizing the cable from generator kVA divided by voltage with no derating. The cable runs hot in the afternoon sun and the insulation ages in weeks.
- Ignoring route length when the generator position changes on delivery day. Voltage at the far end falls below what motors and drives will tolerate.
- Running parallel conductors of unequal length or mixed sizes. One conductor carries far more than its share and its termination burns.
- Laying single-core cables through separate steel openings or apart from each other. Induced heating and higher reactance appear where nobody expects them.
- Reusing a drum without an insulation test. A crushed section from the previous job becomes an earth fault on the new one.
What to send us
Send the generator rating, the load list with the largest motor, the measured route length from the generator position to each panel, a site sketch showing roads, water and lifting areas the route must cross, and photographs of the connectors on your existing equipment. We will size the feeders, confirm the voltage drop and propose the protection. Send a generator rental enquiry with these details.
Questions engineers ask
What cable does a 320 kVA rental generator need over 80 metres?
At full load the current is about 445 A. Two 120 square millimetre copper conductors per phase carry it on the ground in summer heat with a voltage drop of about 1.5% over 80 metres. The choice is confirmed from the cable data for the actual conductor, and the neutral is sized for any single-phase or harmonic load.
Why can the neutral carry more current than a phase?
Single-phase electronic loads such as computers, LED lighting and UPS units draw third harmonic currents that add up in the neutral instead of cancelling. On sites with many such loads the neutral can carry as much as a phase or more, so temporary cables use a full-size neutral and its current is measured once the load runs.
Can I use aluminium cable for a temporary generator feeder?
It is possible for fixed runs but rarely sensible on rental jobs. Aluminium needs a larger section, tolerates repeated bending and coiling poorly and needs bimetallic lugs that must be fitted correctly. Flexible copper cable is the usual choice for temporary feeders that are laid and recovered many times.
How long can a cable be from a 500 kVA generator?
It depends on the current and conductor size, not the generator. At full load with two 185 mm² copper conductors per phase, around 100 to 150 metres keeps the drop near 3%. For longer distances, increase the conductor size, add parallel runs, move the generator or consider a step-up transformer.
Why does my generator show 415 V but the pump trips on under-voltage?
The cable is dropping the voltage between the generator and the pump, and the dip is worse during starting when the current is several times higher. Measure the voltage at the pump terminals during a start. The remedy is a larger cable, a shorter route or a soft starter.
Do temporary cables need to be tested before use?
Yes. An insulation-resistance test with a 500 V or 1000 V tester between conductors and to earth, a continuity check and a visual inspection of the sheath and connectors should be done before every deployment and recorded. It takes minutes and prevents most earth faults on site.
Generators by rating
- Under 15 kVA generators
- 15–50 kVA generators
- 50–125 kVA generators
- 125–250 kVA generators
- 250–500 kVA generators
- 500–1000 kVA generators
- 1000–2000 kVA generators
- 2000 kVA and above generators
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 19 October 2026.