In short. In Delhi-NCR, generator use is governed by directions from the air quality authority and state bodies. These directions change with the season and with pollution levels. This page explains how to plan around them, not what they say today. Track the current order, map each set against it, keep documents ready, and have a compliant alternative for critical loads before the poor-air season starts.
Who this page is for: For facility managers and owners of sites in Delhi-NCR, and for sites elsewhere preparing for tighter rules.
Key facts
- Restrictions are staged and tied to air quality, often worst in the cooler months.
- Categories, exemptions and stages are set by official orders that change.
- Name one person to track orders.
- Keep a dated copy of the order you rely on.
- Map every set against the current order.
- Prepare alternatives for critical loads before the season.
Worked example: a data centre’s set map (illustrative)
| Set | Category per certificate | Under the current order | Plan |
|---|---|---|---|
| DG-01 | Newer certified set | Check the order text | Primary backup |
| DG-02 | Newer certified set | Check the order text | Primary backup |
| DG-03 | Older set with emission control device | Check the order text and any exemption | Use only if the order allows |
| DG-04 | Older set, no device | Likely restricted; confirm | Load moved to battery storage and DG-01/02 |
When restrictions tightened, the site already knew which sets could run, and for what. See emission categories and battery storage.
Do not rely on a summary, including this page, to decide what is permitted. Read the current order or ask the authority.
A simple watch process
- Name an owner for tracking orders.
- List the official sources for your location.
- Save each order as a dated file with a one-line summary.
- Update the set map whenever a new order appears.
- Brief operators on what may run.
Before the poor-air season
| Task | Why |
|---|---|
| Test alternative supply | Ready when restrictions start |
| Stock urea and filter consumables | Keep certified sets compliant |
| Brief staff | Correct use under each stage |
| Check documents | Ready for inspection |
Sites in Hyderabad and elsewhere follow their own rules, but planning for tighter limits is good preparation anywhere. See older generators.
Set map sheet
A set map for the same seven-set fleet, assembled as a facility manager would have to assemble it before a poor-air season. The example above maps a four-set data centre and writes “check the order text” in the permitted column; this sheet keeps that discipline across a larger and more mixed fleet and puts the evidence in that column instead — because a published sheet cannot tell anybody what is permitted, and listing what has to be produced is the part that can be written down once and reused.
| Set | Category | Permitted under current order? | Alternative |
|---|---|---|---|
| A, 500 kVA, Unit 1 | Determined by rating and installation year, 2016, read against the classification in the order. Emission control device to be fitted | Check the order text, with the dated copy on file. Evidence: rating plate, 2016 commissioning certificate, device certificate and its commissioning report | Set B at reduced load, with the two non-essential boards off |
| B, 500 kVA, Unit 1 | Determined by rating and installation year, 2011, read against the classification in the order. No device at present | Check the order text and any exemption. Evidence: rating plate, 2011 certificate, latest emission test result, overhaul record once done | Set A alone, same restriction. If neither may run, Unit 1 has no alternative source and that is the gap to close first |
| G, 1010 kVA, Unit 3 | Determined by rating and installation year, 2014. Note that the replacement set will fall to be classified separately | Check the order text for both the existing and the proposed rating. Evidence: rating plate, 2014 certificate, emission test result | None on site. A rental set with its own certification, arranged before the season rather than during it |
| C, 320 kVA, Unit 2 | Determined by rating and installation year, 2019. A dual-fuel conversion would change what has to be certified | Check the order text, and separately whether an approval path exists for the conversion at this location | Set D for part of Unit 2 only; D cannot carry the unit alone |
| D, 250 kVA, Unit 2 | Determined by rating and installation year, 2008. No emission certificate on file | Cannot be answered until the certificate is produced or the set is re-tested. This is the first item to close on the whole sheet | Set C carries Unit 2 |
| E, 200 kVA, warehouse | Determined by rating and installation year, 2021 | Check the order text. Evidence: rating plate, 2021 certificate. Standby duty, 300 hours a year, which may itself be relevant | None. The warehouse accepts an outage, which is a decision already recorded |
| F, 125 kVA, site office | Determined by rating and installation year, 2006. Most likely to be reached by a use restriction rather than a device requirement | Check the order text. Evidence: rating plate, 2006 certificate, hours log — which has not been written up since 2019 | None. The site office accepts an outage |
Every entry in the third column says to check the order, and that is not an evasion — it is the only honest entry a published sheet can carry. Categories, stages and exemptions are set by orders that change with the season and with air quality, so a yes or a no printed here would be wrong within months and would go on being quoted for years.
What the column can hold permanently is the list of documents that settle the question, and that list does not change: the rating plate, the commissioning or installation certificate, the latest emission test result, the device certificate where one is fitted, and the hours log.
Assembling that evidence is itself the exercise, and on this fleet it produced two findings before any order was opened. Set D has no emission certificate on file at all, which means its row cannot be answered under any order, in any season — so it is the first item to close regardless of what the rules turn out to say.
And Set F’s hours log stops in 2019, which matters precisely because F is the set most likely to be reached by a restriction on use rather than on equipment: a restriction on hours is impossible to demonstrate compliance with if nobody has been recording hours. Neither finding needed a lawyer or an order. Both needed somebody to look in the file.
The fourth column is where the planning actually happens, and the entry for Set B is the one worth acting on. If a restriction reached both A and B, Unit 1 would have no alternative source at all — the two 500 kVA sets back each other up, and nothing backs up the pair.
That is a single point of failure created by regulation rather than by engineering, and it is invisible until the alternatives are written down set by set. The answers for G, E and F are all “none”, but G’s has a cost attached and the other two are accepted outages already agreed, which is a different kind of none and should not be recorded with the same word.
Two practices make the sheet worth keeping. One named person owns it, and the order it was last checked against is saved as a dated file beside it, so that the sheet always says which order it is true for. And it is re-walked before each poor-air season rather than when a restriction arrives — a rental set with its own certification can be arranged in a slow week and cannot be arranged in the week everybody else is also looking for one.
Reading a notice: the five things to extract, in order
A restriction notice is a legal document written for a region, and the site’s job is to turn it into four or five operating instructions by the end of the same day. Done in the order below it takes an hour; done in any other order the first question asked is usually the last one that can be answered.
- Which area it applies to, exactly. Restrictions are drawn on administrative boundaries, not on cities as people describe them, and a site on the edge of one is either inside or outside with nothing in between. This is settled first because every other question is conditional on it, and it is settled from the notice’s own schedule of areas rather than from a news summary.
- Which categories of generator it names. Notices distinguish sets by rating band, by emission category and sometimes by whether an emission control device is fitted. A fleet of four sets will usually find itself in two or three different buckets, which is why the answer is never one instruction for the site.
- What it permits rather than what it prohibits. Most notices carve out emergency and life-safety use, and the carve-out is the operating envelope the site will actually run in. Reading only the prohibition produces a shutdown plan; reading the permission produces an operating plan.
- What it requires to be demonstrated. Where a device, a conversion or a category is the basis for running, the notice will say what evidence supports that. This is the point at which a weak file becomes expensive, and it is why the records work is done out of season.
- When it starts, when it is reviewed, and who announces the change. Stages come and go within a season, so the site needs the trigger and the source, not just the current state. A plan that depends on somebody noticing a news item is not a plan.
| Extract | Where it goes | Who needs it within the hour | What goes wrong if it is skipped |
|---|---|---|---|
| Area applicability | One line at the top of the site’s restriction sheet | Whoever authorises generator starts | The site either over-complies and loses availability, or under-complies without knowing |
| Categories named | Against each set on the fleet sheet | Maintenance and the control room | One instruction gets applied to four sets that are in different positions |
| Permitted use | The operating envelope, written as what may run and when | Operators, in words they can act on at 2 am | Sets are kept off during genuine emergencies, which is the worst outcome available |
| Evidence required | A check against each set’s file, with gaps listed | Compliance, immediately | The basis for running cannot be shown when it is asked for |
| Trigger and source | The watch process, with a named owner | Whoever owns the watch | A stage change is missed and the site runs on last week’s rules |
Point three is where most sites lose the most. A notice read as a prohibition produces an instruction not to run, and an instruction not to run gets obeyed during a genuine outage by an operator at night who has no way to weigh it. The restriction sheet therefore states the permission in operational language — which loads may be carried, by which set, under what circumstances — and states it before the prohibition. Life-safety circuits are identified on a drawing in advance, not argued about at the time.
The out-of-season calendar, and why it is short
Everything that makes a restriction season manageable has a lead time longer than the notice period, so the preparation is a calendar rather than a response. It is a short calendar, and it repeats.
| When | What is done | Why it cannot wait for the season |
|---|---|---|
| Six months before | Routes decided for each set: retrofit, convert, replace or document | A retrofit takes weeks and a conversion or replacement takes months |
| Four months before | Load priority register agreed with the departments whose load it sheds | The agreement is the slow part, not the engineering. Shedding nobody agreed to is shedding that gets overridden |
| Three months before | Load-bank tests on any set whose file shows only no-load running | A set with no evidence of capability is the weakest position to be inspected in, and a load bank has to be booked |
| Two months before | Emission tests scheduled so the fleet’s reports are close together and current | Testers are busiest as a season approaches, and a report from eighteen months ago describes a different set |
| One month before | Restriction sheet written, operators briefed, watch owner named | The sheet has to be in the control room before the notice, not after it |
| During the season | Watch the source, update the stage, keep the trend and cleaning records current | Records that lapse during the season are the ones that will be asked for |
One exception is worth stating. A site that is replacing a set should aim to complete it before a season rather than during one, because a current-category set brings its compliance position with it and needs no evidence assembled at all — whereas a changeover week inside a restriction period is the one time the site has neither the old set nor the new one.
Common mistakes
- No one tracking orders.
- Relying on summaries.
- Alternatives arranged too late.
- Documents not ready.
What to send us
Send your location and list of sets. WhatsApp 98852 01608 or use the application engineering enquiry.
Evidence note. The example is illustrative; regulations change, so verify officially.
Questions engineers ask
What should a site extract from a restriction notice first?
Which area it applies to, exactly, because every other question is conditional on it and restrictions are drawn on administrative boundaries rather than on cities as people describe them. Then the categories of generator named, then what the notice permits rather than what it prohibits, then what it requires to be demonstrated, and last the trigger and the source for stage changes.
Why read a notice for what it permits rather than what it prohibits?
Because reading only the prohibition produces a shutdown plan while reading the permission produces an operating plan. Most notices carve out emergency and life-safety use, and that carve-out is the envelope the site will actually run in. A notice read as a prohibition gets obeyed during a genuine outage by an operator at night who has no way to weigh it.
How far in advance does restriction-season preparation have to start?
Six months for the route decisions, because a retrofit takes weeks and a conversion or replacement takes months. Four months for the load priority register, since agreeing it with the departments whose load it sheds is the slow part. Three months for load-bank tests, two for emission tests while testers are still available, and one for the restriction sheet and the operator briefing.
Can I rely on this page for limits?
No. Restrictions in the region are issued as official orders that change with air quality stages and can be revised at short notice. Use the current order from the issuing authority for limits, permitted uses and exemptions, keep a dated copy on site, and recheck it whenever a new stage is announced for the area.
Do hospitals get exemptions?
Check the current order for the categories it covers. Orders often treat essential services such as healthcare differently, but the conditions, such as compliant sets, approved retrofit devices or specific fuels, vary between orders. Confirm the exact category and conditions in writing for your site, and keep the evidence ready for inspection.
Is gas allowed?
Check the fuel conditions in the current order. Some orders treat gas-based or dual-fuel sets differently from diesel sets, but the conditions, such as approved conversion kits, emission certificates and supply arrangements, must be met in full. Confirm the treatment of your specific set in writing before relying on it during a restriction.
What documents help?
Keep the type-approval or emission certificates for each set, approval documents for any retrofit device, recent stack test reports, a running log with every start, stop, load and reason, fuel records and service history. Organised by set and kept on site with a digital copy, they show compliance quickly during an inspection.
General guidance only. Regulations change; verify officially.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.