Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Main-Tie-Main Automatic Transfer Control

How main-tie-main schemes work: two incomers and a bus tie, transfer logic on loss of one source, interlocks, fault lockout, retransfer, fault-level limits and tests that prove no double feed.

In short. A main-tie-main board has two incomers and a tie breaker, and normally only two of the three are closed. If one source is lost, its incomer opens and the tie closes, so the remaining source feeds both sections. The logic must answer two questions before it closes the tie: was the source lost, or is there a fault on the bus? And can the remaining source carry both sections? Getting either wrong turns a single failure into a whole-board outage.

Who this page is for: For consultants, panel builders and plant engineers with double-ended switchboards, with or without generators.

Key facts

  • Normally both incomers are closed and the tie is open.
  • Never allow all three closed unless a designed, synchronised paralleling mode exists.
  • Block automatic transfer if the incomer tripped on a fault.
  • Check the remaining source can carry both sections; shed load if not.
  • Wait for motor residual voltage to decay (often below about 25%) before closing the tie.
  • An open-transition transfer typically takes a few seconds, set by the loss-of-source delay and residual-voltage decay.

Transfer logic

StepCondition
1. Detect loss of source AUndervoltage on all phases for a short delay
2. Check for a fault on section 1No protection operation, no lockout
3. Open incomer AConfirmed open by feedback
4. Check source BHealthy voltage and enough capacity
5. Shed if neededDrop non-essential loads so B can carry both sections
6. Wait for residual voltage to decayBelow the threshold, or a fixed delay
7. Close the tieAll interlocks satisfied
8. Restart loads in stagesLargest motors first

Worked example: can the survivor carry both sections? (illustrative)

Two 1000 kVA transformers feed a main-tie-main board. Section 1 carries 650 kVA and section 2 carries 550 kVA.

EventLoad on the remaining transformerAction
Transformer A lost, tie closes1200 kVA = 120%Shed about 250 kVA of non-essential load first, leaving about 950 kVA, 95%
Bus fault on section 1Not applicableTransfer blocked; section 2 stays on transformer B
Source A restoredBack to normal splitRetransfer after a stability delay, manual or automatic

Timing: loss detected in about 0.5 to 2 s, incomer opens in about 0.1 s, tie closes after the residual-voltage check, and the section is typically back on supply within a few seconds. Without the shed step, the surviving transformer would run at 120%, overheating and ageing fast, and its overload protection could trip it, taking both sections off. See transformer capacity.

Never let the tie close automatically after an incomer has tripped on a fault. Closing onto a faulted section transfers the fault to the healthy source and takes out the whole board.

Interlocks

All three breakers must never be closed together unless closed-transition paralleling with synchronising checks has been designed in. Back the software with key interlocks or hard-wired logic. See interlocking and permissives.

Open and closed transition

Open transition gives a short break on the transferred section. Closed transition parallels the sources briefly so there is no break, but it needs synchronising checks and switchgear rated for the combined fault level. See closed transition.

With generators

A generator may be a third source for one or both sections. Define the order of preference (other incomer first, or generator first) and the generator’s limited capacity in the logic. See utility and DG transfer.

Motor residual voltage and restart

When a section transfers, running motors keep generating for a moment. Closing the tie while their voltage is high and out of phase gives a heavy transient. Use a residual-voltage check or a fixed delay, then restart loads in stages. See restart control.

Main-tie-main settings sheet

ItemValue
Loss-of-source threshold and delay 
Fault lockout signals 
Section loads and survivor loading (%) 
Load to shed before tie close 
Residual-voltage threshold or delay 
Retransfer mode and delay 

Worked example: how long to wait for motor residual voltage (illustrative)

When a section loses supply, its running motors keep spinning and, for a short time, generate a voltage that decays with the motors’ open-circuit time constant and drifts in phase as they slow down. Closing the tie while that voltage is high and out of phase gives a heavy current and torque transient. The voltage falls roughly as e−t ÷ T, so the time to fall to 25% is T × ln 4 ≈ 1.39 T.

Motor group open-circuit time constant TTime to 25%Typical of
0.5 s0.5 × 1.39 ≈ 0.69 sSmall and medium low-voltage motors
1.0 s1.0 × 1.39 ≈ 1.39 sLarger low-voltage motors
1.5 s1.5 × 1.39 ≈ 2.08 sLarge, high-inertia drives

A residual-voltage relay measuring the section bus is better than a fixed delay, because it closes the tie as soon as the voltage has actually decayed, whatever mix of motors happens to be running. A fixed delay must be set for the slowest case, which wastes time on every other transfer.

Fast transfer: closing before the motors drift

Some critical plants close the tie within about 100 ms, before the motors have slowed much, so the process barely notices. This is only safe while the resultant voltage across each motor, the vector difference between the new supply and the motor’s residual voltage, stays within about 1.33 per unit, a commonly used motor limit.

Residual voltage and phase driftResultant voltageClose?
0.8 per unit, 40 degrees behind√(1 + 0.64 − 2 × 0.8 × cos 40°) ≈ 0.64 per unitYes
0.8 per unit, 120 degrees behind√(1 + 0.64 + 0.8) ≈ 1.56 per unitNo: wait for residual voltage to decay

A fast-transfer scheme therefore measures phase angle and residual voltage continuously and closes only inside the safe zone; if the window is missed, it falls back to a residual-voltage transfer. Without that measurement, a fixed fast close is a gamble on where the motors happen to be.

Is it a loss of source or a fault? The signals that decide

SignalWhat it meansTransfer
Undervoltage on all three phases, incomer protection not operatedSource lost upstreamPermit
Incomer overcurrent or earth fault operated, or lockout relay setFault on the section or its incomerBlock
Busbar protection operatedFault on the section busBlock
Voltage lost on one phase only, or VT supervision alarmProbably a blown VT fuse, not a lost sourceBlock and alarm
Incomer opened by an operator or a permitPlanned outagePer the agreed procedure, usually manual

The VT fuse row is the one most often missed. A single blown fuse can look like a lost source to a simple undervoltage element, and an automatic transfer then switches a healthy section off a healthy supply. Use undervoltage on all three phases together with VT supervision.

Setting the loss-of-source delay around the utility’s reclose

Many overhead feeders reclose automatically after a fraction of a second to a second or two. If the loss-of-source delay is shorter than the reclose time, the board transfers on every temporary fault and then transfers back minutes later, two interruptions where one would have done. Set the delay slightly longer than the upstream reclose dead time, for example 1.5 s against a 1 s reclose, unless the load cannot tolerate the wait, in which case the motors and processes must be designed to ride through the reclose instead.

Retransfer between two utility sources

Two transformers fed from different utility feeders, or even different substations, can sit several degrees apart in phase, and the angle can change with network loading. Measure it before deciding on closed retransfer. If the angle stays well inside the sync-check window, a closed retransfer with a parallel timer avoids a second break; if it wanders, open retransfer, with a residual-voltage check, is the honest choice. Either way the utility should agree, because a closed retransfer briefly parallels two parts of its network.

The test matrix that proves the logic

ScenarioExpected result
Source A lostIncomer A opens, load shed if needed, tie closes after residual check
Source B lostMirror of the above
Fault on section 1Incomer A trips and locks out; tie stays open
VT fuse blown on section 1No transfer; alarm
Both sources lostGenerator start and transfer per its own logic, if fitted
Tie fails to closeAlarm; no repeated attempts
Source returns during the transferSequence completes, then retransfer per its rules

Run every row at commissioning and the first three at each major maintenance. Logic that has only been tested for a clean loss of source has not been tested for the cases that cause whole-board outages.

When each section also has a generator

On many sites each section of a main-tie-main board can also be fed from its own standby set. The logic then needs a written order of preference for every combination of lost sources, because the cheapest-looking choice is not always the safest one.

  • One transformer lost: close the tie onto the healthy transformer, usually preferred to starting a set, because it restores supply in seconds rather than tens of seconds, provided the survivor can carry both sections after shedding.
  • Both transformers lost: start both sets, close each onto its own section, and keep the tie open unless the sets are designed to run in parallel, which avoids paralleling two machines through the tie without synchronising.
  • One set fails to start: close the tie so the running set carries both sections, after shedding to its rating, and only through a synchronising or dead-bus check.

Write each case as a row in the cause and effect matrix and test it, including the failed-start case, which is the one most often left untested.

What the operator needs to see and do

An automatic transfer that the operator cannot follow invites mistakes during recovery. Show on the panel and the mimic which sources are healthy, which breakers are closed, whether automatic transfer is enabled or blocked and why, and what load was shed. Provide a clearly labelled automatic and manual selector, and make manual closing of the tie pass through the same interlocks and checks as the automatic sequence, so a manual action can never do what the logic would have blocked.

Common mistakes

  • Tie closing onto a faulted section.
  • No capacity check before closing the tie.
  • No residual-voltage delay.
  • Software-only interlocks.

What to send us

Send the single-line diagram, transformer data, section loads and present logic. WhatsApp 98852 01608 or use the enquiry form.

Evidence note. Timings and thresholds are typical values for illustration; the design and equipment data govern.

Questions engineers ask

How long should a tie wait for motor residual voltage?

Until the section voltage has fallen to about 25%, which takes about 1.39 times the motor open-circuit time constant: about 0.7 s for a 0.5 s time constant and about 2.1 s for 1.5 s. A residual-voltage relay is better than a fixed delay, because it closes as soon as the voltage has actually decayed for whatever motors are running.

Can a blown VT fuse cause a false transfer?

Yes. A single blown fuse removes one phase voltage, and a simple undervoltage element can read it as a lost source, switching a healthy section off a healthy supply. Require undervoltage on all three phases, use VT supervision to block the transfer and raise an alarm, and include a blown-fuse case in the commissioning tests.

Why is the tie normally open?

To keep the two sections independent, so a fault or disturbance on one does not affect the other, and to keep the fault level at each section to what one transformer can deliver. Closing all three breakers would parallel the two sources, roughly doubling the fault level and needing switchgear rated for it, so it is done only in a designed, synchronised mode.

What if B cannot carry both sections?

Shed non-essential load before or as the tie closes, so the remaining source stays within its rating. With two 1000 kVA transformers carrying 650 and 550 kVA, the survivor would see 120%; shedding about 250 kVA brings it to about 95%. The shed list should be calculated from measured loads, not fixed at commissioning.

Is retransfer automatic?

It can be, after the returned source has stayed healthy for a set time, often a few minutes, and with the same checks as the original transfer. Many sites prefer manual retransfer after someone has reviewed why the source was lost. Closed retransfer avoids a second break but needs synchronising, a parallel timer and utility agreement.

Can two utility sources be out of phase?

Yes. Transformers fed from different feeders or substations can differ by several degrees, and the angle changes with network loading. Measure it before choosing closed transition. If it stays well inside the sync-check window, closed transfer with sync-check and a parallel timer is possible; otherwise use open transition with a residual-voltage check.

This guide gives general principles. Confirm with a project design.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.

CallWhatsAppEnquire