In short. When the grid connection opens, local generation must either disconnect quickly or form a controlled island. Unplanned islands endanger line crews and risk an out-of-phase reclose by the utility onto running generators. Detection must be fast enough to be safe yet stable enough not to trip on ordinary grid disturbances. The hardest case is the one where local generation almost exactly matches the site load: frequency barely moves, so frequency-based methods may never see the island.
Who this page is for: For engineers of sites that parallel generators, solar or storage with the grid, and for anyone setting loss-of-mains protection.
Key facts
- Rate of change of frequency ≈ (power mismatch ÷ rating) × f ÷ (2H), where H is the inertia constant in seconds.
- A large mismatch gives a fast frequency change that ROCOF detects within a few hundred milliseconds.
- A near-zero mismatch gives almost no change: use tie-breaker status or utility transfer trip.
- Vector shift detects the sudden phase jump but can false-trip on grid faults.
- After an unplanned island, shed load to the local capacity within a fraction of a second.
- Never reconnect without synchronising and the utility’s permission.
Detection methods
| Method | Principle | Limitation |
|---|---|---|
| Under and over voltage and frequency | Island drifts outside limits | Misses well-balanced islands |
| Rate of change of frequency (ROCOF) | Fast frequency change on mismatch | Sensitive to settings and grid events |
| Vector shift | Sudden phase jump when the grid opens | Can nuisance trip |
| Tie-breaker status | Direct signal that the connection opened | Only sees the local breaker |
| Transfer trip from the utility | Signal when the utility breaker opens | Needs a reliable communication channel |
Worked example: why balance defeats ROCOF (illustrative)
A factory runs a 1250 kVA generator (inertia constant H about 1.5 s) in parallel with the grid.
| Case | Mismatch when the grid opens | Frequency change | Detection |
|---|---|---|---|
| Site imports 400 kW | 400 ÷ 1250 = 0.32 | 0.32 × 50 ÷ 3 ≈ 5.3 Hz per second | ROCOF set at 1 Hz/s trips in well under 0.5 s; load must be shed at once |
| Site imports 10 kW | 10 ÷ 1250 = 0.008 | About 0.13 Hz per second | Below a 1 Hz/s setting: ROCOF may not see the island at all |
Running close to zero import is exactly how many sites operate to avoid export, so the balanced case is common. The robust answer is a direct signal: tie-breaker status, or a transfer trip from the utility, with ROCOF and vector shift as backups. See interconnection studies.
Do not rely on ROCOF alone where generation and load are closely matched. An undetected island can energise the utility network and be hit by an out-of-phase reclose. Use a direct breaker or transfer-trip signal where you can.
Planned and unplanned islanding
| Planned | Unplanned |
|---|---|
| Match generation to load, assign the lead set, open the tie | Detect loss, open the tie, assign the lead set |
| Little or no disturbance | Shed load to fit capacity within a fraction of a second |
| Switch protection to island settings | Stabilise voltage and frequency, then restore loads in stages |
Reconnection
Wait until the utility supply is stable and any waiting time the utility requires has passed. Then match voltage, frequency and angle and close through a sync-check. See sync-check logic.
Utility rules
Utilities require that local generation must not energise a dead network. Where a site parallels or exports, loss-of-mains protection with agreed settings and witnessed tests is normally required. Take settings from the utility’s requirements and the interconnection study, and prove them by injection. See microgrid controller.
Islanding protection sheet
| Item | Value |
|---|---|
| Typical import or export at the tie (kW) | |
| Generation rating and inertia | |
| ROCOF and vector shift settings | |
| Direct signal: tie status or transfer trip | |
| Shed table for unplanned islanding | |
| Witness test date |
Worked example: why vector shift also needs a real mismatch (illustrative)
Vector shift looks for the sudden jump in the phase of the terminal voltage when the grid opens. The jump comes from the change in current through the generator’s internal reactance, so it is roughly the change in load, in per unit of the set rating, times that reactance, in radians. For the same 1250 kVA set, with a transient reactance of about 0.2 per unit:
| Mismatch at the moment the grid opens | Phase jump | Against a 6 degree setting |
|---|---|---|
| 400 kW, 0.32 per unit | 0.32 × 0.2 = 0.064 rad ≈ 3.7 degrees | Not detected |
| 650 kW, 0.52 per unit | 0.52 × 0.2 ≈ 0.104 rad ≈ 6 degrees | At the edge of detection |
So a mismatch that rate of change of frequency catches easily, 5.3 Hz per second in the example above, may not move the phase enough for vector shift. Each method has its own blind zone, and neither covers the balanced case. That is why the direct signal, tie-breaker status or utility transfer trip, is the primary method wherever it can be had, and the measured methods are backups.
The first second of an unplanned island
Suppose the same factory imports 400 kW with the 1250 kVA (1000 kW) set carrying 1000 kW, so the site load is 1400 kW, and the grid is lost. The set is now asked for 1.4 times its rating.
| Item | Working | Result |
|---|---|---|
| Overload on the set | (1400 − 1000) ÷ 1000 | 0.4 per unit |
| Rate of frequency fall | 0.4 × 50 ÷ (2 × 1.5) | about 6.7 Hz per second |
| Time to fall from 50 to 47.5 Hz | 2.5 ÷ 6.7 | about 0.37 s |
If the set’s under-frequency trip sits at 47.5 Hz, shedding has well under 0.4 s to remove at least 400 kW, less the governor’s help in that time, which is small. Frequency-stage shedding is too slow for this; the shed must be triggered directly by the tie-breaker opening, with a pre-calculated shed table that is updated continuously from the import measured just before the event.
Inverter-based sources and islanding
- Grid-following inverters, the usual solar and many battery inverters, need a voltage to follow. They include their own anti-islanding detection and stop within the time their standard allows when the grid is lost.
- Grid-forming sources, a generator or a grid-forming battery inverter, set voltage and frequency and are what allows a planned island to exist at all.
- Interaction: several inverters with active anti-islanding methods can disturb each other or the generator, and an island formed by a generator can be tripped by inverters that mistake it for an unwanted island. Agree which sources may stay on in island mode and set the others to disconnect, or switch their settings when the island forms.
Reconnection, step by step
| Step | Condition | Typical value (illustrative) |
|---|---|---|
| 1. Grid healthy | Voltage and frequency inside limits continuously | For the period the utility requires, often a few minutes |
| 2. Permission | Utility signal or agreed automatic rule | As in the connection agreement |
| 3. Synchronise the island to the grid | Voltage, slip and angle inside the window | About 5%, 0.1 to 0.2 Hz, 10 degrees |
| 4. Close the tie through sync-check | Independent check relay permits the close | Close angle recorded |
| 5. Return controls to grid-parallel modes | Governor to import control, regulator to power factor | Taken from the tie breaker auxiliary contacts |
| 6. Ramp and restore | Shed loads restored in stages | Over tens of seconds to minutes |
What a witness test of loss-of-mains should include
- Injection tests of every loss-of-mains element at its pickup and time setting.
- A real opening of the tie with the site importing a known amount, with the trip time and shed recorded.
- A test of the direct signal path: tie status or transfer trip, including what happens if the signal is lost.
- Reconnection by synchronising, with the close angle and current recorded.
- A check that grid disturbances recorded on site, such as voltage dips, did not cause trips under the final settings.
Keep the results with the settings and the utility’s approval. A loss-of-mains scheme that has only been injection tested has not been shown to detect a real island.
Settings that satisfy the utility and ride through grid faults
| Element (illustrative ranges) | Pickup | Delay | Main risk if set wrongly |
|---|---|---|---|
| Undervoltage | About 80 to 85% | About 1 to 2 s | Trips on every remote grid fault if too fast |
| Overvoltage | About 110% | About 0.5 to 1 s | Misses voltage rise in an over-generated island if too slow |
| Underfrequency | About 47.5 to 48 Hz | About 0.5 s | Races load shedding if set above the shed stages |
| Overfrequency | About 51.5 to 52 Hz | About 0.5 s | Misses an island with surplus generation |
| Rate of change of frequency | About 0.5 to 1 Hz per second | About 0.2 to 0.5 s | Nuisance trips on grid disturbances if too sensitive |
| Vector shift | About 6 to 12 degrees | None | Trips on grid faults and large motor starts if too low |
The utility’s requirements come first and the ranges above are only a starting point. The tension is always the same: the utility wants fast, sensitive disconnection so no island survives, and the site wants to stay connected through the brief disturbances of a healthy grid. A direct signal from the tie breaker or the utility breaker resolves most of that tension, because it lets the measured elements be set less sensitively without leaving the balanced case uncovered.
Keep the shed table live
The amount to shed on an unplanned island equals the import at the moment the grid is lost, plus a margin for the governor’s slow first response. That import changes all day, so the shed table must be recalculated continuously, every second or so, from the measured import and the measured load on each sheddable feeder. A fixed table written at commissioning sheds too little on a busy afternoon and too much at night. Record the table actually used at each event, so the next review can see whether it was right.
Common mistakes
- ROCOF as the only detection on a balanced site.
- Settings so sensitive that grid faults cause trips.
- No shed table for the unplanned island.
- Reconnecting without synchronising.
What to send us
Send the utility connection details, generator and inverter data, and present relay settings. WhatsApp 98852 01608 or use the enquiry form.
Evidence note. The formula is a first estimate that ignores governor response and load behaviour; settings follow the utility’s requirements and a study.
Questions engineers ask
Why can vector shift miss an island?
Because the phase jump it looks for is roughly the load change in per unit of the set rating times the set reactance. On a 1250 kVA set with a transient reactance of 0.2, a 400 kW mismatch gives only about 3.7 degrees, below a typical 6 degree setting, even though rate of change of frequency sees about 5.3 Hz per second. Each method has a blind zone.
How fast must load be shed after an unplanned island?
Often within a few tenths of a second. A 1000 kW set left carrying 1400 kW is 0.4 per unit overloaded; with an inertia constant of 1.5 s frequency falls at about 6.7 Hz per second and reaches 47.5 Hz in about 0.37 s. Shedding must be triggered directly by the tie breaker opening, from a shed table updated before the event.
Why can islanding be dangerous?
An undetected island keeps part of the network live after the utility has opened it, so line staff can meet a conductor they believe is dead. The island also drifts in phase from the grid, and when the utility recloses, the two can meet far out of phase, with currents and torques that can damage the generator, its coupling and the switchgear.
Can ROCOF cause nuisance trips?
Yes. Grid faults, large load steps and switching can produce brief frequency swings that exceed a sensitive setting, tripping the site off a healthy grid. Settings of about 0.5 to 1 Hz per second with a short delay, agreed with the utility, balance sensitivity against stability. Record any trips and compare them with grid events before changing settings.
Is islanding allowed?
Only where the utility and local rules permit it. Unintended islanding of the utility network is not allowed. Planned islanding of a private site, with the tie breaker open and the site fully separated, is commonly allowed, provided the transitions, protection and reconnection follow the agreed conditions and are witnessed.
How is it tested?
By injection tests of each loss-of-mains element, a witnessed real opening of the tie with the site at a known import, a test of any direct signal such as tie status or transfer trip including its failure, and reconnection by synchronising. Record trip times, shed amounts and close angles, and keep them with the utility approval.
This guide gives general principles. Follow the utility’s requirements and local regulation.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 8 November 2026.