Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Islandable Microgrids

How an islandable microgrid separates from the utility and stays stable, balances generation and load, sheds load, and resynchronises when the grid returns.

In short. An islandable microgrid can separate from the utility and keep supplying its loads from local generators, batteries and solar. Disconnecting is the easy part. The hard part is staying stable afterwards: a local source must take over voltage and frequency, generation must match load second by second, reserve must cover the next step, and non-critical load must be shed if sources fall short. Return to the grid needs a planned resynchronising sequence.

The transition step by step

An islanding event typically follows this sequence: an abnormal utility condition is detected; the PCC breaker opens; the island is confirmed; the grid-forming source assumes voltage and frequency control; generation and load are balanced, with load shedding if needed; reserve is re-established; and the island settles into stable operation. In a well-designed system with a grid-forming battery already online, this happens in a fraction of a second and the loads see a brief disturbance rather than an interruption. With generators only, the island normally forms after an open transition and a start interval of around ten to fifteen seconds.

Transition typeInterruption seen by loadRequirements
Open, generator startSeconds, typically 10 to 30AMF logic, standby generator; critical loads on UPS
Open, battery onlineUnder a secondGrid-forming PCS; fast PCC opening
Seamless, battery or running generatorA voltage and frequency disturbance, no breakGrid-forming source already in parallel; fast islanding detection; approved paralleling

What the island must now provide

Once separated, the utility no longer supplies the frequency reference, voltage support, reactive power or fault current. The microgrid must supply all of these internally. In practice that means at least one grid-forming source with enough kW and kVA for the load and its steps, AVR or inverter voltage control capable of supporting motor starts, and protection set for the lower fault level of an island. The detection and control logic is described in islanding detection and transition control.

Balancing generation and load

Inside an island, generation must match load continuously. When load exceeds what the online sources can supply, frequency falls. The system must respond in order: the battery discharges, a standby generator is started, and if that is not fast enough, non-critical loads are shed by under-frequency stages or by the controller.

Island margin (kW) = Σ available source capacity (kW) − Island load (kW)

Available capacity counts only sources that are online and able to respond. Example (illustrative): a 750 kW island load supplied by one 500 kVA set at about 400 kW and a 400 kW battery has a margin of 50 kW, so a 150 kW chiller restart must either wait for the second generator or trigger shedding of 100 kW of non-essential load. The load-shedding planning tool helps set the stages.

Who holds the reference, and how sources share

When both a generator and a grid-forming battery are online in an island, the control philosophy must say which one is in charge. One common arrangement lets the battery hold frequency isochronously while the generator runs at a fixed, efficient output; the battery then absorbs every fluctuation and the generator setpoint is adjusted slowly to keep the battery in its preferred state of charge. Another lets both run in droop so they share changes in proportion to their ratings.

A third makes the generator the reference and uses the battery only for fast support. Each is valid, but mixing them without a plan produces controllers that fight over the same variable. The same question applies to reactive power: AVR and inverter voltage controls must be set so that circulating kVAr does not overload either source. The energy management controls guide explains how these rules sit within the wider control hierarchy.

Motor starting in an island

Island strength is far lower than grid strength, so a direct-on-line motor start that the grid absorbs without notice can cause a deep voltage dip. Check every large motor against the island’s combined generator and inverter capability, and use soft starters or VFDs where the dip would upset other loads.

Energy duration in the island

Power balance keeps the island stable; energy decides how long it lasts. A battery-only island lasts as long as its usable kWh; adding solar extends it in daylight; diesel or gas generation extends it for as long as fuel is available. The island design must state the expected duration for each scenario and what happens when stored energy runs low, for example starting a generator at a defined battery state of charge.

Resynchronising with the utility

When the utility returns and has been stable for a defined period, the island must reconnect in a controlled way. In a closed transition the controller adjusts island frequency and voltage until they match the utility within the sync-check window, then closes the PCC. In an open transition the island load is briefly dropped. The approved method depends on the DISCOM’s rules and the switchgear. Details are in grid-connected microgrids and the islanding readiness assessment.

Building the island load list

An island can only be as reliable as the load list behind it. Before any source is sized, every feeder is placed in one of three classes, and the class decides when it is restored, when it is shed and which source carries it. Sorting the loads this way also exposes the large motors and sensitive equipment that set the transient duty of the island, which matter far more than the average demand.

ClassTypical loadsIn island mode
CriticalProcess controls, servers, safety systems, fire pumps, emergency lightingRestored first, never shed, often behind a UPS
EssentialMain production lines, cold rooms, water pumping, liftsRestored in planned steps, shed only in a deep shortfall
DeferrableComfort cooling, workshop tools, battery charging for vehicles, non-urgent pumpingRestored last, shed first

Worked example: a factory island (illustrative)

A plant with a peak grid demand of about 420 kVA installs two 250 kVA generating sets and a battery system rated 200 kW and 400 kWh, with a rooftop solar plant of 150 kW. The critical and essential loads together peak at about 300 kW, and the deferrable loads add about 60 kW.

The figures show the method: the island is designed for the failure of its largest source, not only for the case where everything starts.

Load shedding stages

Shedding protects the island when demand exceeds what the running sources can supply. It is set in stages, each with a frequency or power trigger and a short delay, so a brief motor start does not trip loads that do not need to go. The values below are illustrative; real settings come from the protection study and the source data.

StageTrigger (illustrative)Loads shed
1Frequency below 49.5 Hz for 2 seconds, or a running source lostDeferrable loads
2Frequency below 49.2 Hz for 1 secondSelected essential loads with the least process impact
3Frequency below 48.8 HzAll remaining non-critical loads

Each stage is restored automatically only when the frequency has recovered and enough capacity is running, and never all at once.

Earthing and protection in island mode

When the utility connection opens, the neutral reference and fault level of the network change. The island must still have one defined neutral earthing point, so that touch voltages stay safe and earth faults can be detected. Fault currents from inverters are small and short, and those from generators fall away after the first few cycles, so overcurrent devices set for the grid may not trip in island mode. The usual answer is a second group of protection settings, switched in automatically when the island forms, and checked in the protection study.

Commissioning tests that prove the island

The results become the baseline for the yearly islanding test, so any drift in response is seen early.

Common mistakes

What to send us

Send the single-line diagram, generator, battery and PV details, the critical and sheddable load lists, the largest motors and their starters, and a record of recent outages and how the site behaved. Tell us the interruption the critical loads can tolerate. Use the application engineering enquiry and we will screen islanding readiness.

Questions engineers ask

How are loads prioritised in an islanded microgrid?

Each feeder is classed as critical, essential or deferrable. Critical loads such as controls, servers and safety systems are restored first and never shed, essential production loads follow in planned steps, and deferrable loads such as comfort cooling come back last and are the first to be shed.

How should an island be sized if one generator fails to start?

Design for the loss of the largest source. In the illustrative factory, two 250 kVA sets and a 200 kW battery carry 360 kW together, and if one set fails, the other carries the 300 kW of critical and essential load while the deferrable loads stay off.

Why does protection need different settings in island mode?

Because fault currents from inverters are small and short, and generator fault current falls away after a few cycles, so devices set for the grid may not trip. A second settings group, switched in automatically when the island forms and checked by a protection study, keeps faults cleared safely.

What tests prove an islandable microgrid at commissioning?

A planned separation at normal load, a deliberate start failure of one set, each shedding stage triggered and restored, the largest motor start in island mode, and resynchronisation to the grid. Recorded results become the baseline for the yearly islanding test, so drift is seen early.

Can a microgrid island without any break?

Yes, if a grid-forming source is already online and the PCC opens fast on islanding detection. Loads still see a short disturbance, so sensitive equipment should stay on UPS. The transition is tested on real load, with voltage and frequency recorded, so the size of the disturbance is known rather than assumed.

What happens if the island runs short of power?

Frequency falls, the battery discharges and the controller starts generators. If they cannot respond in time, under-frequency shedding drops non-critical loads in stages to protect the island. The shedding stages and the loads in each are agreed with the site and tested, and loads return in a planned order once enough capacity is back on line.

Can solar keep running during an island?

Yes, once a grid-forming source sets voltage and frequency, PV inverters can resynchronise and feed the island. The controller must curtail them if generation exceeds load and the battery is full. Running generators must also stay above their minimum load, so curtailment protects them from reverse power.

How often should islanding be tested?

At commissioning and at least annually, and after any change to controls or protection. A deliberate open of the PCC under real load is the only reliable proof. Record frequency, voltage, the loads shed and restored, and the resynchronisation to the grid, so each test can be compared with the last one and any drift in performance is found early.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 19 October 2026.

CallWhatsAppEnquire