Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Grid-Connected Microgrids

How a grid-connected microgrid works alongside the DISCOM supply, what the point of common coupling must do, and what changes the moment the utility is lost.

In short. A grid-connected microgrid runs with the utility present most of the time, using local generators, batteries and solar to reduce cost, shave peaks and raise self-consumption. The utility provides the voltage and frequency reference, fault current and system strength. The point of common coupling must manage import, export and protection, and the design must state exactly what happens when the utility disappears, because the grid was doing far more for the site than supplying kWh.

Normal operation with the utility present

In grid-connected mode the DISCOM network is the reference. It sets voltage and frequency, absorbs mismatches between local generation and load, and supplies large fault currents that let protection operate quickly. Local sources work as grid-following resources: the battery charges and discharges to setpoints, PV injects what it can, and generators, if permitted to parallel, run at fixed output. The microgrid controller’s job in this mode is mainly economic and contractual.

Typical strategies

The point of common coupling

The PCC is the electrical and contractual boundary. It needs a breaker capable of separating the site under fault, metering that measures import and export, and protection that meets the DISCOM’s requirements, typically under and over voltage, under and over frequency, rate of change of frequency or vector shift for islanding detection, reverse power where export is not allowed, and directional overcurrent. The controller must know the PCC breaker status, power direction and utility condition at all times.

PCC functionPurposeTypical device
IsolationSeparate the site on fault or utility failureACB or VCB with motorised operation
Islanding detectionStop local sources feeding a dead utility networkMultifunction relay with ROCOF and vector shift
Export controlHold export at zero or the approved limitExport limiter feeding the controller; reverse power relay
Synchronising checkPermit reconnection only when matchedSync-check relay
MeteringBilling and controller feedbackDISCOM meter and a separate controller meter

Paralleling generators with the utility

Many sites want diesel or gas generators to run in parallel with the grid, for peak shaving, closed-transition testing or no-break return. That needs synchronising switchgear, protection approved by the utility and a clear operating permission. Indian DISCOMs vary in their requirements and some restrict DG paralleling altogether. The switchgear side is covered in utility paralleling and the control side in utility and DG synchronisation.

What the grid was doing for you

The moment the utility is lost, the site changes from a load connected to a strong network into an autonomous power system. Everything the grid silently provided must now come from inside the boundary: voltage reference, frequency reference, reactive power, inertia, fault current, and the absorption of every load step. If no local source is ready to form the grid, the island collapses and the site goes dark until a generator starts through AMF logic. A grid-connected design must therefore state, for each source, what it does at the instant of utility loss and who takes over the reference. Read islandable microgrids for that transition.

Pgap = Pload − Plocal

Pgap is the utility import at the moment of loss, which local grid-forming sources must pick up at once. If a site imports 400 kW with 300 kW of PV running, losing the grid leaves a 400 kW gap (illustrative), and the PV itself may trip on the disturbance, raising the gap to 700 kW.

Planning for Indian supply conditions

Grid-connected microgrids in Telangana and Andhra Pradesh face supply conditions that a European design template may not anticipate: frequent short interruptions, voltage sags from upstream faults, scheduled maintenance outages announced at short notice, and wide voltage variation at the end of long rural feeders. Each of these is a possible islanding trigger.

The controller settings must distinguish a genuine loss of supply from a brief sag that the site should ride through, otherwise the microgrid islands several times a day and wears out its switchgear. Recording a few weeks of supply quality at the PCC with a power quality analyser before setting thresholds is time well spent. The same data show whether voltage regulation by the battery inverter, through reactive power, could reduce the number of sags that trip sensitive production equipment.

Returning to the grid

When utility power returns and has been stable for a set time, the site either reconnects by synchronising its island to the grid in a closed transition, or by briefly dropping the load in an open transition. Closed transition needs synchronising equipment at the PCC and utility permission. Seamless transfer in either direction is not an inherent feature of every microgrid; it has to be designed, tested and approved.

Operating modes of a grid-connected microgrid

ModeWhat runsWhat the controller does
Grid-following, self-consumptionGrid, solar, batteryUses solar on site, stores surplus, imports the rest
Peak managementGrid, battery, sometimes generatorKeeps import below a demand threshold
Zero or limited exportGrid, solar, batteryCurtails solar or charges the battery so export stays within the agreed limit
Islanding on grid failureBattery or generator forms the gridDisconnects from the grid and keeps critical loads supplied
ResynchronisationAll sourcesMatches the island to the returning grid and reconnects

Export limits and how they are kept

Many connections allow little or no export to the distribution network. The controller measures power at the point of connection many times a second and, when export approaches the limit, reduces solar output or diverts surplus into the battery. A typical set-up holds net import slightly above zero, so that a sudden load drop does not push power back into the network before the controller responds. The export limit, the measurement point and the response time are agreed with the distribution utility and tested at commissioning.

Peak management worked through (illustrative)

A commercial site has a contracted demand of 400 kVA and an afternoon peak of about 450 kVA for two hours on hot days. A battery with an inverter of 80 kW and 250 kWh nameplate can hold import near 390 kVA during the peak, discharging up to about 60 kW for two hours, which is 120 kWh delivered and well within its usable energy at end of life. The same battery also provides a short-outage bridge and smooths solar swings, so one asset serves several purposes, with a reserve held for outages.

Protection at the point of connection

Approvals and metering

Connecting solar, a battery or a generator in parallel with the network needs approval from the distribution utility, with the single-line diagram, protection settings, equipment certificates and metering arrangement. Net or gross metering, the export arrangement if any, and the tests the utility will witness are agreed before installation. Changes after approval, such as adding battery capacity or changing export settings, are notified and approved before they are made.

Reviewing performance

Monthly data on import, export, peak demand, solar used and curtailed, battery cycles and islanded periods shows whether the microgrid delivers what was planned. Where peaks still exceed the threshold, the battery strategy or reserve is adjusted; where solar is often curtailed, more storage or shifted loads may help.

Moving into island mode safely

When the grid fails, the microgrid must separate before its own sources can energise the network. The loss-of-mains protection opens the connection breaker, the forming source holds voltage and frequency for the island, and the controller sheds any load the island cannot carry. When the grid returns, the controller waits for it to be stable, matches voltage, frequency and phase, and reconnects. Each step is tested at commissioning, because a failed separation is a safety risk to utility staff and a failed reconnection can disturb sensitive loads.

Common mistakes

What to send us

Send the single-line diagram from the DISCOM meter downward, the sanctioned load and contract demand, twelve months of interval data, details of PV, battery and generator assets, and any correspondence with the DISCOM on paralleling or export. Submit through the application engineering enquiry and we will outline the PCC scheme and operating modes.

Questions engineers ask

How is a zero-export limit kept on a microgrid?

The controller measures power at the point of connection many times a second and reduces solar output or charges the battery as export approaches the limit, usually holding net import slightly above zero. The limit, measuring point and response time are agreed with the utility in writing and tested at commissioning.

Can a battery reduce my maximum demand charges?

Yes, by discharging during the peak. In the illustrative site, an 80 kW, 250 kWh battery holds import near 390 kVA during a two-hour peak of about 450 kVA, delivering about 120 kWh, while still keeping a reserve for outages and smoothing solar output. Savings depend on the tariff and on how often peaks occur.

What protection is needed where a microgrid connects to the grid?

Loss-of-mains detection, reverse power or export limiting where export is restricted, voltage and frequency protection set to utility requirements, interlocks that delay reconnection until the network is stable, and separate protection settings for island mode, where inverter fault currents are much lower, so the settings are checked by a protection study for both modes.

How does a microgrid move into island mode?

Loss-of-mains protection opens the connection breaker, the forming source holds voltage and frequency, and the controller sheds any load the island cannot carry. When the grid returns and is stable, the controller matches voltage, frequency and phase before reconnecting. Each step is tested at commissioning, because a failed separation endangers utility staff.

Can my microgrid export power to the DISCOM?

Only under the utility’s net-metering, gross-metering or other approved arrangement, with the required metering and protection. Many industrial connections are set for zero export, which the controller must enforce. A reverse-power or export-limit relay at the point of connection backs up the controller, so a control fault cannot push power into the network, and the function is tested at commissioning.

Will the site stay powered when the grid fails?

Only if a local source is ready to form the grid and the PCC opens fast enough. Without a grid-forming battery or a running generator, the site sees a break until the standby generator starts. Critical loads therefore keep their UPS, sized for the start and transfer time.

What is anti-islanding protection?

It disconnects local sources when the utility network is lost so that they do not energise lines the DISCOM believes are dead. The PCC can be designed to open first, after which the site can island deliberately. Settings are agreed with the DISCOM and tested.

Is a grid-connected microgrid worth it if the grid is reliable?

The economic functions such as peak shaving and solar self-consumption can still justify it. The resilience functions add cost and are worth it mainly where outages are frequent or costly. Interval meter data and a costed outage estimate show which functions earn their cost, so the design includes only those, with space left to add resilience later.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 19 October 2026.

CallWhatsAppEnquire