Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Warehousing & Logistics Power

Backup power for warehouses, fulfilment centres and logistics hubs, covering WMS and network loads, dock equipment, forklift charging and rental site layout.

In short. A warehouse can have the lights on and still be stopped, because dispatch depends on the warehouse management system, the network, scanners, dock equipment and security as much as on illumination. Backup power should carry the digital and safety loads first, the handling equipment needed for the operating model next, and treat forklift charging as deferrable. Size from the shift profile, not the connected load, and plan cable routes around vehicle movement.

What actually stops when a warehouse loses power

Logistics sites in the corridors around Hyderabad, Medchal, Shamshabad and along the Vijayawada highway are built around flow: goods in, put away, pick, pack, dispatch. An outage interrupts the flow in ways that are not obvious from the electrical drawing. The warehouse management system server or its link to the cloud drops, so no pick lists are issued. Wireless access points go dark, so handheld scanners cannot confirm anything.

Dock levellers and shutter doors stop mid-travel, so vehicles cannot be loaded. Conveyors and sorters stop with parcels on them. Barcode and label printers reset. CCTV and access control fail at the moment when the site is most exposed. A modern fulfilment centre with automated storage or a sorter is more fragile still, because its control system must be re-homed before anything moves.

The engineering consequence is that the backup scope must be built from the operating model rather than from a list of electrical equipment. Ask what must keep running to receive, pick and dispatch during an outage of the expected duration, and what can wait.

Classify the loads by what they do for dispatch

FunctionTypical equipmentConsequence of lossPriority on generator
Life safetyFire pumps, sprinkler controls, emergency lighting, smoke vents, PAStatutory and safety exposureFirst, by design
Digital controlWMS servers, network switches, access points, scanners, printersNo transactions, no dispatchUPS, then generator
SecurityCCTV, access control, gate barriers, perimeter lightingTheft and audit exposureEarly
Dock operationsLevellers, shutter doors, dock lightsVehicles cannot load or unloadEarly, sequenced
Material flowConveyors, sorters, vertical lifts, cranesThroughput lossDepends on operating model
Task lightingHigh-bay LED in active aislesPicking stopsActive zones only
MHE chargingForklift and reach-truck chargersDeferrable for hoursShed, restore later
Temperature-controlled zonesChillers, cold roomsProduct lossSee cold-storage guidance
Offices and canteenAir conditioning, pantryInconvenienceLast or excluded

Where the site includes cold rooms or a frozen zone, the refrigeration plant changes the sizing entirely and has its own rules, which are covered on cold-storage power. The general method of ranking loads is on critical-load classification.

Sizing from the shift profile

Warehouse demand moves through the day. Inbound peaks in the morning, picking and packing through the shift, dispatch in the evening, and the forklift fleet charging overnight. The generator should be sized for the loads that will run together during backup operation, which is rarely the site’s metered maximum demand, because charging and offices are shed. Measure or log the demand for a week if a meter is available, then subtract the deferrable and excluded loads and add the starting demand of the largest motor in the retained set, usually a conveyor drive, a sorter or a chiller.

S_gen = (P_retained / PF) + S_start

In this expression S_gen is the indicative generator kVA, P_retained is the running kW of the retained loads, PF is their power factor and S_start is the transient apparent power of the largest motor start once the base load is on the bus.

For a 20,000 square metre dry warehouse with 110 kW of retained lighting, IT, security, docks and conveyors at 0.85 PF, and a 22 kW conveyor drive started direct-on-line, S_gen is about 130 kVA plus roughly 170 kVA of transient, pointing to a 200 to 250 kVA set depending on the acceptable voltage dip (illustrative). If the same site insisted on charging 40 forklifts during the outage, the figure would double, which is why charging is normally deferred. The full method is on generator sizing.

Battery charging as a managed load

Forklift chargers are large, numerous and tolerant of delay. A fleet of lead-acid trucks charges for eight hours overnight; lithium fleets use opportunity charging through the shift. In both cases a load management scheme that blocks chargers on loss of mains and releases them in groups once the generator has capacity avoids a much larger set. If the generator is a paralleled plant, chargers become the lowest priority step in the controller’s shedding table; see load management.

Fire load and generator location

Warehouses carry a high fire load in packaging, pallets, plastics and stored goods, and the fire authority’s requirements for the sprinkler and hydrant pumps often set a minimum generator capability regardless of commercial preference. The generator itself and its fuel storage should be located so that they are not inside the storage hazard, with the CPCB stack height, ventilation and acoustic requirements met, and with vehicle protection where trucks reverse nearby. The room or enclosure needs maintenance access that does not require closing a dock. Installation considerations are set out on installation planning.

Temporary and rental power on a working site

Many logistics sites take a rental set for an HT shutdown, a transformer change or a peak season, and the problems are rarely electrical. The set must be placed where trucks do not reverse into it, cable routes must cross yards and docks without becoming trip or crush hazards, and the connection point must be agreed with whoever controls the main switchboard. Define cable routes and ramps on the actual site plan, agree who operates the changeover and who refuels, and confirm the site’s operating hours so that testing does not coincide with the dispatch peak. Practical points are on rental and temporary power and rental cables and distribution.

A dispatch-first load register (illustrative)

A regional distribution centre classifies its loads by what each does for dispatch. The register shows how a site of about 900 kW connected load needs far less on the generator.

ClassLoadsSupplyDemand
DigitalWMS servers, network, scanners, label printersUPS, generator behind it25 kW
Safety and securityFire systems, emergency lighting, CCTV, access controlGenerator, with batteries where required30 kW
Dock operationsDock levellers, shutters, dock lightingGenerator45 kW
Picking areaLighting in active aisles, conveyors and sortersGenerator, restarted in sequence120 kW
Cooling for staff areas and server roomServer room AC, selected ventilationGenerator35 kW
DeferrableForklift chargers, general HVAC, yard lighting at dayShed, resumed on the DISCOM supplyNot on generator

The protected demand is 255 kW, about 320 kVA at 0.8 power factor. A 400 kVA set carries it at about 80% with conveyors restarted in sequence, instead of a set sized for the full connected load.

Forklift chargers and battery equipment

Forklift and pallet-truck chargers are heavy, rectifier-type loads. During a short outage, most fleets have enough charge to keep working, so chargers are usually deferred until the DISCOM supply returns. Where a site runs three shifts with little spare battery capacity, a share of the chargers can be placed on the generator, staggered so they do not start together and allowed for in the alternator selection because of their harmonic current.

Seasonal peaks and growing sites

Warehouses grow. Festival peaks bring extra shifts, temporary conveyors and more lighting, and new tenants add cold rooms or automation. The generator plan records the present protected load and the margin left, and the margin is checked whenever a new load is proposed. Where growth is expected, a set position, cable route and changeover rated for a larger future set save a complete re-installation later.

Service and testing

On sets we maintain, oil and filters are changed every 250 to 500 running hours or six months, whichever comes first, and coolant is replaced every year. Because a warehouse standby set rarely sees real load, a periodic test on the protected loads, or on a load bank, proves it can carry the dispatch operation when it matters.

When a cold room joins the warehouse

Many warehouses add a cold room or chilled zone for pharmaceuticals or food. Refrigeration then becomes the most time-sensitive load on the site, because stock can be lost within hours. The cold room is added to the protected register with its own restart step, its controller and temperature logger are put on UPS, and the generator margin is checked for the refrigeration start before the room is commissioned.

A quick check each quarter of the protected load against the register keeps the plan honest, because warehouse loads change faster than most buildings.

Common mistakes

What to send us

Send a site plan showing docks, yard and the main switchboard, a load list grouped by function with motor ratings for conveyors, sorters and any refrigeration, the IT and network loads, the number and type of charging points, and your metered demand data if available. Tell us whether the requirement is a permanent standby set, a rental for a shutdown or season, or both. Send your warehouse power requirement.

Questions engineers ask

Which warehouse loads should be on the generator first?

The digital loads that make dispatch possible, such as WMS servers, network, scanners and label printers on UPS, then safety and security systems, dock equipment, picking-area lighting and conveyors restarted in sequence. Forklift chargers and general HVAC are usually deferred until the DISCOM supply returns.

How should a warehouse plan its generator for growth?

Record the present protected load and the margin left, and check that margin before every new load such as a cold room or automation line. Where growth is expected, a set position, cable route and changeover rated for a larger future set avoid a complete re-installation later.

What size generator does a warehouse need?

It depends on the retained loads, not the floor area. A dry warehouse that retains safety, IT, security, docks and some conveyors often needs 150 to 300 kVA (illustrative), while adding refrigeration or full charging can multiply that. Measure, decide what is shed, then size.

Should forklift chargers be on the generator?

Usually not. During a short outage most fleets have enough charge to keep working, so chargers are deferred until the DISCOM supply returns. On three-shift sites with little spare battery capacity, a share of chargers can be placed on the set, staggered and allowed for in the alternator selection.

Do WMS servers and network equipment need a UPS as well as a generator?

Yes. The generator needs seconds to start and transfer, and servers, switches and scanners drop out in that gap, losing transactions and forcing restarts. A UPS carries them through the transfer and the generator then carries them and recharges the UPS for the rest of the outage.

How should a rental generator be placed on a busy logistics site?

Away from truck routes, dock aprons and turning areas, on firm ground with barriers, with exhaust directed away from docks and offices and cables protected where vehicles cross. Fuel deliveries need their own safe access, and the position should not block emergency routes or fire hydrants.

Can a warehouse generator also serve a future cold room?

It can, if the margin was planned. The cold room adds a refrigeration load with its own starting step, and stock can be lost within hours, so it is added to the protected register, its controller goes on UPS and the generator capacity is checked for the start before commissioning.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 19 October 2026.