Generator Finder

A step-by-step way to pick the right generator: load, duty, kVA, fuel, emissions rules, site and noise, plus the details to send so we can recommend and quote the right set.

In short. The right generator follows from your load, duty, site and rules. Work through the steps below, then send the details to us. We will size the set properly rather than selecting from the connected load alone.

Step 1: define the load

Step 2: define the duty

DutyMeaning
StandbyRuns during utility failure; few hours per year
PrimeMain source with variable load
ContinuousConstant load, long hours
Rental / temporaryShort-term need. See rental power

Step 3: size

Size for running load, starting surge, site conditions and growth. See generator sizing, ambient derating and altitude derating.

Step 4: rules and fuel

Check emission rules for your location and fuel options. See emissions overview and cleaner fuels.

Step 5: system

Decide on ATS or AMF, parallel operation, redundancy and enclosure. See N+1 and synchronisation.

Step 6: commissioning and support

Plan commissioning, load bank testing and AMC.

What to send us

Load list, duty, location, fuel, space, noise limits and timeline. Send your application details or call 98852 01608.

A worked example, start to finish (illustrative)

A commercial building in Secunderabad needs backup for lifts, fire pumps, lighting, IT and part of the air conditioning.

StepDecisionResult
1. LoadEssential load list after demand factors380 kW running, 0.85 power factor, so 447 kVA
2. DutyStandby, outages of a few hours, occasional long outagesStandby rating applies
3. SizeLargest motor 55 kW star-delta, summer ambient 45 °C, growth 15%Approximately 447 × 1.15 ÷ 0.95 ≈ 540 kVA required, so a 625 kVA class set is shortlisted and the motor start is checked
4. Rules and fuelCheck current emission and noise rules for the set and siteConfirm applicable norms before ordering
5. SystemATS, single set, space for a secondProvision for future paralleling
6. CommissioningLoad bank test, service contractDocumented acceptance

Choosing between standby, prime and continuous

Using a standby-rated set for long running hours shortens its life. Match the class to the duty and confirm definitions with the maker.

Single set, parallel sets or hire

OptionBest when
Single setModest load, an outage of hours tolerable, budget limited
Parallel sets (N+1)Critical load, growth expected, maintenance without outage needed
RentalTemporary need, event, shutdown or bridging a repair. See rental power

Fuel and emissions

Diesel remains the common choice for backup. Cleaner-fuel options, including dual fuel and emission-control retrofits, depend on duty and regulation. Confirm current official notifications for your site. See cleaner-fuel generator systems and emissions and power transition.

Site, noise and ventilation

Generator rooms and canopies need combustion air, cooling airflow and an exhaust path. Poor ventilation derates a set more than altitude does. Acoustic enclosures and silencers meet noise limits at the boundary. Hyderabad’s dust and monsoon humidity affect filters and electrical enclosures.

Which rating band fits which site

Rating bandTypical sitesWhat usually decides the sizeGuide
Under 15 kVAHomes, small shops, clinics, telecom sheltersSingle-phase motors and air conditioners startingUnder 15 kVA
15 to 50 kVAOffices, bank branches, small workshops, apartment common servicesLift and pump starting, single-phase balance15 to 50 kVA
50 to 125 kVACommercial floors, function halls, small factories, cold roomsThe largest motor start50 to 125 kVA
125 to 250 kVAMid-size factories, hotels, hospital blocks, construction sitesBlock loads after transfer and motor groups125 to 250 kVA
250 to 500 kVACommercial towers, process plants, larger hospitalsRedundancy and the restart sequence250 to 500 kVA
500 to 1000 kVAIndustrial plants, data rooms, campusesParalleling, fault level and switchgear500 to 1000 kVA
1000 kVA and aboveLarge plants, utilities, multi-set power stationsSystem design, often several sets in parallel1000 to 2000 kVA

The band is a starting point, not the answer. Two sites with the same running load can need sets a full band apart because of one large motor, a UPS or a demand for redundancy.

The information that settles the choice

InformationWhy it matters
Loads that must run on generator, with kW and power factorSets the running kW and kVA
Largest motor, its kW and starting methodOften decides the size more than the running load
UPS, drives and other electronic loadsHarmonics and recharge load on the alternator
Expected hours: occasional outages, daily cuts or continuousSelects the standby, prime or continuous rating
Site location, room or open yard, and neighboursDerating, enclosure, noise and ventilation
Existing switchboard and incomerChangeover type, AMF panel and cable route
Growth expected in the next few yearsMargin now, or space for a second set later

A photograph of the main switchboard and the nameplates of the largest motors often answer half these questions in one message.

New, used or rented

RouteSuitsWatch for
New setLong service life ahead, current emission stage required, maker warranty wantedLead time for larger ratings
Used or refurbished setStandby duty, budget limits, quick delivery, a proven frameCondition proven by a load test, emission stage accepted at the site
Rental setTemporary need, events, shutdowns, bridging a repair or a delivery waitFuel arrangements, operator and the scope of cables and panels

Reddy Generators sells used sets as is, with an inspection report, and refurbished sets with a six-month warranty, of all major makes from 15 to 2000 kVA, every one load-bank tested before sale; we also rent sets and buy used sets or take them in part exchange. See used and refurbished generators and rental power.

Planning fuel before buying

Fuel is the largest running cost of most sets, so it belongs in the choice. At about 75% load, a 125 kVA set uses roughly 21 to 23 litres an hour, a 250 kVA set about 42 to 46 and a 500 kVA set about 77 to 83, ranges drawn from the published data of several makers.

A site with four hours of outage a day on a 250 kVA set at that load burns about 42 to 46 × 4 × 30, roughly 5040 to 5520 litres a month. That figure sizes the tank, the delivery arrangement and the budget, and it shows why an oversized set, running lightly loaded, wastes fuel as well as capital. See DG fuel consumption chart.

Space and weight to allow for

Canopied set, typicalLengthWidthHeightWeight
125 kVAAbout 3.0 to 3.3 mAbout 1.1 mAbout 1.5 to 1.8 mAbout 1.7 to 2.0 t
250 kVAAbout 3.3 to 3.8 mAbout 1.1 to 1.2 mAbout 1.8 to 1.9 mAbout 2.4 to 3.0 t
500 kVAAbout 4.3 to 4.5 mAbout 1.45 to 1.6 mAbout 2.2 to 2.3 mAbout 4.3 to 4.8 t

Ranges are drawn from data sheets of several makers and differ by engine and enclosure, so the actual set’s drawing governs. Allow about a metre of clear space around the canopy for doors and maintenance, a level foundation able to take the weight, a route for the crane or forklift, and space for the exhaust to discharge away from windows and air intakes. See outdoor installation.

From enquiry to a running set

  1. Load list, duty and site details shared, with photographs.
  2. Sizing checked for running load, largest motor start and site derating.
  3. Set, changeover or AMF panel, cables and earthing proposed as one scope.
  4. Foundation, cable route and exhaust prepared on site.
  5. Set delivered, installed, connected and earthed.
  6. Commissioning with a load test and a transfer test on the real changeover.
  7. Service plan agreed, so the set is ready on the day it is needed.

Noise, exhaust and approvals

Diesel sets in India are subject to noise and emission rules that affect the choice of set and its position. Sets up to the larger commercial ratings are supplied in acoustic enclosures built to a noise limit of 75 dB(A) at 1 m from the enclosure surface, and the exhaust must discharge through a stack whose height above the building is commonly set by a rule of about 0.2 × √kVA metres: about 2.2 m for a 125 kVA set, 3.2 m for 250 kVA and 4.5 m for 500 kVA, added to the height of the building.

The emission stage of the set must be one the local authority accepts. Rules change, so the current notification and the local pollution control board’s requirements are confirmed before ordering. See acoustic enclosures and exhaust systems.

What keeps the set ready afterwards

A standby set fails most often when it is called after months of standing. A service plan that includes regular runs on load, battery and charger checks, fuel quality checks and filter changes on schedule keeps it ready. Reddy Generators services the sets it supplies, and other makes, across Telangana, Andhra Pradesh and the districts within about 300 km of Hyderabad, with project-based service further afield.

Each of these steps is quick when the information in the table above is ready, and each one avoids a mistake that is expensive to correct after the set is installed.

Common mistakes

  1. Sizing on connected load instead of demand.
  2. Ignoring the largest motor start.
  3. Choosing the engine and forgetting the alternator reactance.
  4. Leaving out fuel storage and delivery planning.
  5. No load bank testing at handover.

The master engineering question

If the utility fails now, will this set start, carry my real load and keep running for as long as I need it?

Questions buyers ask

How much diesel does a generator use in a month?

Multiply the hourly use at the expected load by the running hours. At about 75% load a 125 kVA set uses roughly 21 to 23 litres an hour, a 250 kVA set about 42 to 46 and a 500 kVA set about 77 to 83, depending on the make. A 250 kVA set running four hours a day for a month at that load uses roughly 5040 to 5520 litres, which sizes the tank and the budget.

How high must a generator exhaust stack be?

A common rule sets the stack height above the building at about 0.2 times the square root of the kVA rating, in metres: about 2.2 m for 125 kVA, 3.2 m for 250 kVA and 4.5 m for 500 kVA, added to the building height. Confirm the current rule and the local pollution control board requirements before installation.

Can I choose by kVA alone?

No. Two sites with the same kVA of load can need sets a full rating band apart. The largest motor and how it starts, UPS and drive loads, the running hours, site temperature and altitude, and any need for redundancy all change the answer. A short load list with the largest motor settles it.

New or used?

It depends on duty, budget, delivery time and the emission stage the site needs. For standby duty a tested used set is often sound value; for long daily running a refurbished set with a warranty, or a new set, is safer. Whatever the route, insist on a load test of the exact set.

Do I need an ATS?

For automatic changeover when the grid fails, yes, either as an automatic transfer switch or as an AMF panel that starts the set and switches the load. A manual changeover is cheaper but needs someone on site to start the set and switch over during every outage.

Can you size from my bill?

Bills help, because the billed maximum demand shows the peak drawn from the grid. They do not show which loads must run on generator, the largest motor start or the UPS load, so a short load list of the loads to be backed up gives a far better answer than the bill alone.

Guidance only. Final selection needs site data.