In short. A good generator sales enquiry tells us what must stay powered, how the set will be used and where it will stand. Send the running load or a load list, the largest motor and how it starts, voltage and phase, standby or prime duty, required backup hours, changeover arrangement, site photographs and the date you need power. With that, Reddy Generators can propose a rating and scope in one conversation instead of several.
Send your enquiry
Why the enquiry decides the outcome
Most mis-sized generators trace back to an enquiry that gave only a kVA number. A figure copied from an old set or a brochure says nothing about motor starting, UPS loads, ambient temperature or future expansion, and any quotation built on it inherits the error. An enquiry that describes the application lets the proposal start from the load and work towards the equipment, which is the order the engineering requires. If you do not know the final capacity, say so and send the facts you have; a load assessment can begin from a list of equipment and its nameplates.
Information that shapes the proposal
| Information | Why it matters | If you do not have it |
|---|---|---|
| Application and site location | Duty, ambient, access and local rules | Always needed |
| Running load or load list | Base for kW and kVA | Send equipment list or DISCOM maximum demand |
| Largest motor and starting method | Often sets the rating more than running load | Send motor nameplate photograph |
| Voltage and phase | 415 V three-phase or 230 V single-phase | Photograph of the main incomer |
| Standby or prime duty | Decides the rating basis and engine choice | Describe hours of use per year |
| Backup hours and fuel | Tank size and refuelling plan | State longest outage you must ride through |
| Changeover | Manual changeover, AMF panel or ATS | Photograph of existing panel |
| Required date | Stock, lead time, installation programme | Give an approximate month |
From load to kVA
The first calculation converts the running load into apparent power.
kVA = kW / PF
kW is the simultaneous running load, PF is its power factor and kVA is the rating the alternator must supply. Worked example (illustrative): an office building runs 90 kW of lighting, lifts, pumps and air conditioning at a power factor of 0.85, which is about 106 kVA. Allowing roughly 20% headroom gives about 127 kVA, so a 125 kVA set is marginal and 160 kVA is the safer candidate. The next check is the lift and pump starting current, and whether the UPS load introduces harmonics. Sizing is explained fully in generator sizing, and the product ranges are listed under generator systems.
Duty, compliance and installation
Tell us how often the set will run. A building with a reliable DISCOM supply may run its set a few hours a month in standby duty. A factory in an area with long outages, or a site with no grid, runs it as prime power, which needs a different rating basis and attention to fuel cost per kWh.
New sets up to 800 kW must meet CPCB IV+ emission norms and come in an acoustic enclosure meeting noise limits; electronic engines bring different service needs. Installation scope also needs defining early: foundation, ventilation and exhaust for indoor sets, cable size and route to the main panel, earthing pits, the AMF or ATS panel and approval by the electrical inspectorate where applicable. These are covered under generator installation.
Documents and photographs that help
- Main LT panel and incomer, with nameplates visible.
- The proposed location of the set, with the route to the panel.
- Nameplates of large motors, chillers and the UPS.
- The existing generator nameplate, if replacing a set.
- Single-line diagram and load schedule, if available.
- Any consultant specification or tender clause the set must meet.
Remove confidential details you do not want shared, and tell us if you would prefer to send drawings through a specific channel.
What happens after you send it
We review the information, ask for anything missing that would change the rating, and then propose a set with its rating basis, emission stage, enclosure, controller and the installation scope. Where the load is complex, such as large motors, VFDs or paralleled sets, we recommend a site visit or load study before final selection. An enquiry does not by itself confirm equipment, availability or price; those are stated in a written quotation. If you need power before a new set can be delivered and installed, see rental and temporary power.
What a complete proposal should contain
A proposal answers the enquiry line by line. When it does, two offers can be compared fairly and nothing important is discovered after the order. These are the items a sound generator proposal states in writing.
| Item | What it should say |
|---|---|
| Rating | kVA and kW, the rating basis (standby or prime) and the site conditions it holds to |
| Set configuration | Engine and alternator, controller, open or acoustic enclosure, base tank capacity |
| Compliance | Emission and noise approval for the model offered |
| Changeover | AMF panel, automatic or manual changeover, rating and number of poles |
| Installation scope | Foundation, cabling and route length, earthing, exhaust, fuel connections, what the site provides |
| Testing | Commissioning checks and a load test at handover, with the results recorded |
| Documents | Manuals, drawings, test records and certificates handed over |
| Exclusions and lead time | Anything not included, and when the set will be delivered and commissioned |
New, used or refurbished: matching the set to the duty
The right condition of set follows from how many hours it will run and how much risk the site can carry.
| Situation | Usually the better fit | Why |
|---|---|---|
| Standby for a reliable supply, few hours a year | Refurbished or new | A tested refurbished set gives dependable standby at a lower purchase step |
| Long daily running on poor supply | New, or refurbished at prime rating | Fuel and wear dominate the cost over the years |
| Short project or uncertain future need | Used, or rental | Lower commitment, with the inspection report showing the condition |
| Critical load where failure is costly | New or refurbished, with a load test witnessed | The test record matters more than the purchase price |
Used sets are sold as is with an inspection report; refurbished sets are rebuilt, load-bank tested and carry a six-month warranty with stated exclusions. See used and refurbished generators.
Site questions that change the scope
- Can a truck and crane reach the position, and is the ground or slab strong enough?
- How far is the set from the main panel, and which way will the cables run?
- Is it a room, a rooftop or open ground, and where will the hot air and exhaust go?
- Are there neighbours close enough for noise to matter at night?
- How will diesel be delivered, and how much needs to be stored?
- Is there an existing set, panel or changeover that must be removed or reused?
Each answer can add or remove work, so they are settled before the price is fixed rather than after the set arrives.
What you receive at handover
A completed sale ends with the set running on load in front of the customer, not with a delivery note. The handover includes the commissioning record with readings at each load step, the protection and changeover tested by simulating a mains failure, operating instructions for the site staff, the manuals and drawings, and the emission and noise documents for the model. Those papers become the start of the generator file for the site and the reference for every later service visit.
Planning the timeline
A generator is rarely the slowest item in a project, but it is often ordered last. Working back from the date power is needed: allow for the proposal and order, delivery of the set, the foundation or slab to be ready and cured, cables and changeover installed, the set placed and connected, and commissioning on load. Where any approval is needed for the installation or for fuel storage, it is started early because it does not move at the pace of the site. If the building needs power before the permanent set can be ready, a rental set bridges the gap and is removed once the permanent one is commissioned.
Stating the required date in the enquiry lets the proposal say honestly whether it can be met and what would make it easier.
Common mistakes
- Sending only a kVA figure; the quotation inherits whatever error was in that number.
- Omitting the largest motor; the set runs the steady load but trips when the borewell pump starts.
- Asking for standby rating for a set that will run daily; the engine is overworked and wears early.
- Leaving installation scope undefined; cables, earthing and the changeover panel appear as extras after the order.
What to send us
Send the application and location, the load list or running load, the largest motor nameplate photograph, voltage and phase, standby or prime duty, required backup hours, changeover arrangement, site photographs and the date you need the set. Phone or WhatsApp 98852 01608, email info@reddygenerators.com, or contact Reddy Generators through the form with your documents.
Questions engineers ask
What should a generator quotation include?
The kVA and kW with the rating basis and site conditions, the engine, alternator, controller and enclosure, emission and noise approval for the model, the changeover arrangement, the installation scope and what the site provides, the commissioning and load test at handover, the documents supplied, the exclusions and the lead time. Without these, two offers cannot be compared fairly.
Should I buy a new, used or refurbished generator?
It follows from the duty. For standby on a reliable supply with few running hours, a load-bank tested refurbished set gives dependable backup at a lower purchase step. For long daily running, fuel and wear dominate, so a new set or a refurbished one at prime rating suits. Used sets are sold as is with an inspection report and suit short or uncertain needs.
Can you size the generator if I do not know my load?
Yes. Send a list of equipment with nameplate photographs or your DISCOM maximum demand reading, and we will estimate running and starting load from them. For complex sites, or where the answer decides a large purchase, a measured load study over a few days is better, because it captures the real peaks, power factor and motor starts rather than estimates.
Do you supply CPCB IV+ compliant generators?
Yes, new sets up to 800 kW are supplied to CPCB IV+. These engines are electronically controlled and carry exhaust aftertreatment, so we explain the service intervals, the fuel quality the engine needs and the space and access the aftertreatment requires before the order is placed, so that nothing about running the set comes as a surprise on site.
Is installation included in the generator price?
Only if the quotation says so. Ask for installation, cabling, earthing, changeover panel and commissioning to be listed separately so offers can be compared. The foundation, the exhaust, fuel connections and any approvals are also worth naming, because these are the items most often assumed by one party and left out by the other.
Should I choose an AMF panel or a manual changeover?
If the load must return automatically without an operator, use an AMF panel with an ATS or contactor changeover. Manual changeover suits sites with staff present and loads that tolerate a longer break. Either way, the changeover is interlocked so that the generator and the mains can never be connected together, and it is tested at handover.
How long does delivery take?
It depends on rating, make and current stock. Smaller ratings are often available quickly; larger sets and special configurations can take longer. The quotation states the lead time. Where power is needed before the permanent set can be commissioned, a rental set can bridge the gap and is removed once the permanent set is running on load.
We also sell inspected, load-tested used and refurbished generators with panel, installation and AMC.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 19 October 2026.