What to include in a generator hire enquiry: dates, duration, loads, connection point, cables, fuel and site access, so temporary power is planned correctly.

In short. A generator rental enquiry should state where and when power is needed, for how long, why, and what it must run. Include the running load and largest motor, voltage and phase, daily operating hours, where the set will connect, who supplies cables and fuel, site access and what happens if power is interrupted. If the end date is uncertain, say so; duration is an engineering input as much as a billing one.

Send your enquiry

Fields marked * are required. Give a phone number or an email address, whichever you prefer.

Your details are used only to respond to this enquiry (privacy notice). Photographs, nameplates and documents can be shared by email or WhatsApp after we reply. Prefer to talk? Call 98852 01608 or WhatsApp us.

Why rental enquiries need more than a kVA figure

A rental set must reach the site, connect safely, carry the real load including starts, and keep running for the whole hire. Each of those depends on information that a kVA figure does not carry. The same 250 kVA set may be right for a planned shutdown of a commercial building and wrong for a construction site with a tower crane, because the crane’s starting demand and the changing site layout drive a different arrangement. Describing the requirement lets the proposal cover the complete temporary system, not just the machine.

What to tell us

ItemWhat to describeWhy it matters
Reason for hirePlanned outage, failure, bridging, construction, eventSets urgency, duration and transfer method
DatesPower required from, expected end, chance of extensionAvailability and fuel and maintenance planning
LoadRunning kW or list of equipment, largest motor and starterRating and starting capacity
Voltage and phase415 V three-phase or 230 V single-phaseSet selection and connection
Operating hoursContinuous, day only, outage onlyFuel, operator and service needs
Connection pointBusbar, panel, changeover, distance from setCable size, length and termination
FuelWho supplies, how often, storage on siteRuntime and reserve
Consequence of interruptionInconvenience, production loss, safetyWhether a standby second set is justified

Duration, extension and fuel

State the dates explicitly and say whether an extension is likely. Many bridging and construction hires run well past their original end date, and a plan made for two weeks may not suit three months, particularly for fuel, servicing and cable protection. Fuel is the item most often left vague.

Daily fuel (L) = consumption at expected load (L/h) × daily running hours

Diesel generator calculator

Fuel use, runtime, tank size and cost

How this is calculated

Real power is kVA × power factor. Fuel use is estimated as L/h ≈ 0.04 × rated kW + 0.22 × load kW, which follows the usual shape of modern diesel gensets: about 0.26 L per kWh near full load, rising towards 0.38 L per kWh at a quarter load because the engine’s fixed losses are spread over less output.

If you enter the full-load figure from your engine datasheet, the curve is scaled to match it. Runtime is usable fuel ÷ L/h. Tank size is L/h × hours, plus the reserve margin, divided by the usable fraction.

These are planning estimates, typically within 10 to 15% of a healthy engine. Actual use depends on the engine model, its condition, altitude, ambient temperature and how the load varies. For a figure you can rely on, use the manufacturer’s fuel curve or a metered test.

Estimates only, worked out in your browser. For a checked selection, send us your load list and site details or call 98852 01608.

Consumption comes from the set’s fuel curve at the load it will carry, and daily running hours from the site’s operating pattern. Worked example (illustrative): a 125 kVA set carrying about 70 kW may use around 19 to 20 L/h. Running 16 hours a day, that is about 310 litres a day, so a 300-litre base tank will not last a day and refuelling or an external tank must be planned. The fuel runtime calculator repeats this with your figures.

Connection, protection and site access

Tell us where the temporary supply will connect and send photographs. A busbar that looks suitable on a drawing may be impractical if heavy cables cannot be routed to it safely. Moving a site from DISCOM transformer supply to a generator reduces available fault current, so the existing protection may need review.

Where the site will switch between grid and rental supply, an interlocked changeover or ATS is needed so the set cannot back-feed the network; see rental ATS. Check that a truck or crane can reach the placement area, that the ground is firm and above monsoon water, and that exhaust will discharge away from occupied spaces. Accessories such as cables and distribution panels are covered under rental cables.

Earthing and safety on a temporary site

A rental set needs a tested earth for its frame and, where it is the source, for its neutral, arranged consistently with the site’s existing earthing so that earth-fault protection still operates. Earth electrodes for a long hire should be tested before energising and again if the set is moved. Cables crossing roads or work areas need mechanical protection, and distribution boards on construction sites need residual current protection for hand-held tools. Tell us whether the site has an existing earth grid near the placement area, because it affects what we bring.

What happens after you send it

We review the load and site details, ask for anything that would change the rating or connection, and propose a set with the cables, distribution, earthing, fuel arrangement and service during the hire. The proposal states what the site provides and what the rental includes. Sending an enquiry does not reserve equipment; availability and mobilisation are confirmed for the actual dates in writing. For planned shutdowns, enquire early so the transfer sequence can be agreed with the site team; see planned-outage power.

What matters most in each kind of hire

The same 125 kVA set can be the right answer for very different hires, but the questions that decide success change with the situation.

SituationWhat decides success
Construction siteMotor starts from hoists, mixers and pumps; fuel logistics; secure placement; robust cabling across a changing site
Event or exhibitionFixed dates with no slack, quiet acoustic sets near people, safe cable routes for the public, a backup plan if a set stops
Planned shutdown of a substation or transformerExact connection point and phase rotation, a tested changeover, the set running before the shutdown begins
Breakdown of a permanent setSpeed, a connection that matches the existing panel, and a clear end date once the permanent set is repaired
Bridging until a new set arrivesRating matched to the real load, extension terms if delivery slips, a smooth swap at the end
Load testing or commissioning supportThe right voltage and connection, metering, and a set sized for the test rather than the building

Worked example: fuel for a two-week event (illustrative)

An exhibition hires a 125 kVA acoustic set for 14 days, running about 10 hours a day at roughly 60% of its rating.

ItemWorkingResult
Running load100 kW × 0.6About 60 kW
Fuel per hour60 kW × about 0.30 litres per kWhAbout 18 L/h
Fuel per day18 × 10 hoursAbout 180 litres
Fuel for the event180 × 14 daysAbout 2520 litres

A base tank of a few hundred litres therefore needs topping up every day or two, and the refuelling time is planned outside public hours. Stating the daily hours and the expected load in the enquiry is what makes this plan possible before the set arrives.

Handover at delivery and at return

Those records settle the hire cleanly and show how the set was actually used, which is the best basis for sizing the next hire or a permanent set. See the rental power section.

Safety on a hired set

A rental set is often installed quickly and by people new to the site, which is when mistakes happen. The essentials do not change: the set is earthed before it is connected, the changeover makes back-feeding into the grid impossible, cables are protected where vehicles and people cross them, fuel is stored and handled away from ignition sources with spill protection, and only trained people open panels or refuel. A short safety briefing at delivery, recorded with the handover, covers all of them.

Common mistakes

What to send us

Send the site location, dates and expected duration, the reason for the hire, running load and largest motor nameplate, voltage and phase, daily hours, photographs of the connection point and the placement area, and your fuel arrangement. For urgent breakdowns, call or WhatsApp 98852 01608 as well. Or contact Reddy Generators through the form and attach the photographs.

Questions engineers ask

How much diesel will a rented generator use?

Multiply the running load in kW by about 0.25 to 0.33 litres per kWh, depending on the size of the set, then by the hours it runs. A 125 kVA set carrying about 60 kW for 10 hours a day uses roughly 180 litres a day, so a two-week event needs about 2520 litres and a refuelling plan, not just the base tank.

What should be checked when a rental generator is delivered?

That the set is earthed before connection, the phase rotation matches the site, the changeover is tested and makes back feeding impossible, cables are protected where people and vehicles cross, and the fuel level and hour meter are recorded. The site should also be shown how to start, stop and isolate the set safely, with the briefing noted in the handover.

What is the minimum rental period?

Minimum terms depend on the size of the set and the location, because transport and installation are a large part of the cost for short hires. The current terms are stated in the quotation. If the end date is uncertain, say so in the enquiry, so that extension terms are agreed at the start rather than when the hire is already running.

Can a rental set connect to my existing AMF panel?

Often yes, if the panel and cable terminations are suitable. Send a photograph of the panel and its rating so we can check. The connection is then planned with the correct cable size, phase rotation and earthing, and the changeover is tested at delivery so that the rental set and the mains can never be connected together.

Do you provide an operator?

Operator support can be included where the hire needs it, such as continuous running or critical loads. State your requirement in the enquiry. Where no operator is provided, the site staff are shown at delivery how to start, stop and isolate the set, check fuel, oil and coolant daily, and report alarms straight away.

What if the rental set breaks down?

The rental agreement should state the response and replacement arrangement. For critical loads, discuss a second set or a standby arrangement before mobilising. Daily checks by the site and alarms reported at once catch most problems early, and the hours run and fuel used are recorded so any fault can be traced to its cause.