In short. Each enquiry route asks for the details that matter for that type of request, so we can reply with a useful answer the first time instead of a list of questions. Choose the form that matches your need. For anything urgent, such as a breakdown or an emergency rental, call or WhatsApp us directly.
Where to start
| If your question is… | Start with |
|---|---|
| Buying a new generator | Generator Sales Enquiry |
| Hiring a generator | Generator Rental Enquiry |
| Sizing, design or a technical question | Application Engineering Enquiry |
| Finding a spare part | Spare Parts Enquiry |
| Service, repair or an AMC | Service & AMC Enquiry |
| Projects, suppliers and partnerships | Projects, Suppliers & Partners |
All 6 guides in this section
- Generator Sales Enquiry — What to include in a diesel generator purchase enquiry: loads, largest motor, voltage, duty, site and timeline, so we can propose the right kVA and scope.
- Generator Rental Enquiry — What to include in a generator hire enquiry: dates, duration, loads, connection point, cables, fuel and site access, so temporary power is planned correctly.
- Application Engineering Enquiry — How to frame a generator application engineering question on sizing, motor starting, transfer, paralleling or changes, and which data makes the review quick.
- Spare Parts Enquiry — How to request generator spare parts: nameplates, serial numbers, part numbers, photographs and the reason for replacement, so the right part is supplied.
- Service & AMC Enquiry — Learn what to send for a generator breakdown, scheduled service or AMC enquiry, from nameplate photos and alarms to hours run and site access…
- Projects, Suppliers & Partners — Find out what project teams, parts suppliers and service partners should include when approaching Reddy Generators, from load data to evidence.
What to send with each kind of enquiry
The quickest useful answer comes from an enquiry that already holds the facts an engineer would otherwise have to ask for. The table lists them by route; a partial list is still welcome, and anything missing can be filled in on a call.
| Enquiry | Essential details | Helpful extras |
|---|---|---|
| Buying a generator | Loads that must run during an outage, largest motor and how it starts, voltage and phase, standby or long running hours | Electricity bills, photographs of the site and main panel, timeline |
| Used or refurbished set | Rating needed, duty, indoor or outdoor, whether an acoustic enclosure is required | Preferred make, budget for running hours rather than purchase alone |
| Selling a set or part exchange | Make, rating, year, running hours, service history, photographs of nameplates and the set | Reason for sale, whether it runs on load today |
| Hiring a generator | Dates and duration, loads, connection point, site address and access for a truck | Cable route length, fuel arrangement, who operates the set |
| Service, repair or annual maintenance | Make and rating, running hours, the fault and when it started, alarms or fault codes shown | Service history, photographs or a short video of the fault |
| Spare parts | Engine model and serial number, alternator or controller model, the part needed and why | Part number from the old part, photographs |
| Engineering question | The question, the single-line diagram or load list, the ratings involved | Measured readings, existing study reports, deadlines |
| AMF panel or changeover | Generator and supply ratings, existing panel arrangement, automatic or manual transfer | Photographs of the main panel and the cable entry |
What happens after you send an enquiry
- Read and routed: the enquiry goes to the person who handles that kind of work, whether sales, rental, service, parts or engineering.
- Questions only where needed: if something essential is missing, a short call or message settles it, rather than a long form going back and forth.
- Site visit where it helps: for installations, larger sets, changeovers and faults that cannot be diagnosed remotely, a service engineer inspects the site before anything is proposed.
- A clear proposal: the rating and why, the scope of supply and installation, what is excluded, and what the site must provide.
- Follow-through: delivery, installation, commissioning on load and handover with the test records, and then service for as long as the set is in use.
For a breakdown: what to say on the first call
When a set has stopped or will not start, a call or WhatsApp message on 98852 01608 is faster than any form. Five facts let a service engineer start working on the problem before reaching site: the location, the make and rating, whether the set will crank, the alarm or fault message on the controller, and what happened just before it stopped. A photograph of the controller screen and of any leak or damage often narrows the fault to one or two causes. Until help arrives, keep the set isolated, do not keep cranking a set that will not start, and do not open a hot radiator cap.
Photographs that save a site visit
- Every nameplate: engine, alternator, set builder and controller.
- The whole set from each side, showing the space around it.
- The controller screen, including any alarm or fault code.
- The main panel and the changeover or AMF panel with doors open, if safe to do so.
- The cable route from the set to the panel, and the exhaust and air paths for a room.
- For a used set offered for sale: the hour meter, the engine from both sides and the radiator face.
Where Reddy Generators works
Reddy Generators supplies, rents and services diesel generators across Telangana and Andhra Pradesh and in every district within about 300 km of Hyderabad, with project-based supply and service elsewhere in India. The office is at Tarnaka, Secunderabad, and the workshop at Pedda Amberpet, Hyderabad, where sets are inspected, rebuilt and load-bank tested; workshop visits are by appointment. Enquiries are answered seven days a week, from 8:30 am to 8:30 pm, by phone and WhatsApp on 98852 01608 or by email to info@reddygenerators.com.
Choosing the right route
Some needs cross more than one route. A factory replacing an old set may need a sales enquiry for the new one, a part exchange for the old one and a changeover panel for both; a site waiting for a new set may need a rental set in between. In those cases one enquiry describing the whole situation is better than several partial ones, because the answer can then be planned as one job: the right set, the right timing, and no gap in supply while it happens.
A load list in five lines (illustrative)
Most purchase and rental enquiries can be sized from a short list, and nobody needs to be an engineer to write it. One line per load or group of loads, with what it is, how many, its rating and how it starts:
| Load | Quantity | Rating | Starting |
|---|---|---|---|
| Lift | 1 | 11 kW | Drive |
| Water pump | 2, one at a time | 7.5 kW each | Star-delta |
| Air conditioners | 12 | 1.5 ton each | Inverter |
| Lighting and sockets | Whole building | About 15 kW | Not applicable |
| UPS for computers | 1 | 20 kVA | Recharges after an outage |
From that, the running load, the largest start and the effect of the UPS can be worked out, and the rating follows. See the generator sales enquiry guide.
Comparing quotations on the same basis
Two quotations for the same kVA can describe very different jobs. Before comparing them, check that each states the same things.
| Check | Why it changes the comparison |
|---|---|
| Rating basis: standby or prime | A standby rating gives a larger number for the same machine |
| New, used or refurbished | Condition, testing and warranty differ completely |
| Enclosure and emission compliance | Decides whether the set can be installed and used where it is needed |
| Scope of installation | Cabling, changeover, earthing, exhaust and foundation may or may not be included |
| Testing at handover | A load bank test proves the rating; a no-load run proves only that it starts |
| Service after sale | Who services the set, how quickly, and with what parts |
Replacing a set without losing supply
Changing an old generator for a new or refurbished one usually means a short period with no standby supply. It can be planned so that the gap is a few hours, not days: the new set prepared and tested before the old one is removed, cables and changeover prepared in advance, the work scheduled at the lowest-risk time, and, where the site cannot accept any gap, a rental set connected for the changeover period. The old set can be taken in part exchange, which simplifies removal and reduces the cost of the new one. See the generator rental enquiry guide.
What a sound maintenance arrangement covers
Whether a set is serviced visit by visit or under an annual maintenance contract, the work should be defined, not left to memory. A sound arrangement lists the visits and what each includes, the running checks between visits, the parts and consumables covered or excluded, the response to a breakdown, the testing on load at least once a year, and the records left after each visit. Agreeing those points at the start avoids disputes later and keeps the set ready for the day it is needed. See the service and AMC enquiry guide.
Parts and engineering questions
A parts request is answered fastest with the engine model and serial number, because the same engine family can use different parts across its life; a photograph of the old part and its number removes the remaining doubt. An engineering question, such as whether a set will start a motor, how to parallel two sets, or whether an existing set can take more load, is answered from data: ratings, a single-line diagram, a load list or measured readings. See the spare parts enquiry and application engineering enquiry guides.
Before you sell or exchange a used generator
A set offered for sale or part exchange is valued on its condition and evidence, not only its age. Run it on load if possible and note any smoke, leaks or alarms; gather the service history and any test reports; photograph the nameplates, the hour meter and the set from every side; and say honestly what is known to be wrong. A set with a clear history and a recent load run is easier to assess and is valued with more confidence, and the inspection at the workshop then confirms what the papers say.
Projects, suppliers and partners
Consultants, contractors and suppliers working on larger projects often need a generator partner early, while the design is still moving. The useful early inputs are the project location and stage, the expected load and redundancy, the site constraints for the set and fuel, and the programme dates. With those, ratings, layouts and the supply and installation scope can be developed alongside the rest of the design rather than squeezed in at the end. See the projects, suppliers and partners route.
Keeping your own record of the enquiry
For anything larger than a single part, it helps to keep a short note of what was asked and answered: the loads and site details sent, the rating and scope proposed, the decisions made on calls and the documents received. When the project moves forward months later, or someone new takes it over, that note avoids repeating the same questions and keeps the original reasoning visible. The same note becomes the first page of the generator file once the set is installed, and it is the quickest way to brief anyone who joins the project later.
Questions engineers ask
What details should I send for a generator quote?
The load (kW or a load list), the largest motor and how it starts, standby or prime use, site location, and any space or noise limits. Photos of the site, the existing panel and any nameplates help, and for rental, the dates and whether cable or an operator is needed. With these details the right set can be proposed without repeated questions.
How quickly do you respond?
Breakdowns and emergency rentals are best handled by phone or WhatsApp. Written enquiries are answered as soon as the details have been reviewed. Call or WhatsApp 98852 01608; the office is open seven days a week, 8:30 am to 8:30 pm. Share the alarm text, nameplate photos and site location so the right engineer and parts are arranged.
What details should I send when enquiring about a generator?
For a purchase or hire, the loads that must run during an outage, the largest motor and how it starts, the voltage and phase, the duty and the site address. For service or parts, the make, rating, engine model and serial number, running hours and the fault or part needed. Photographs of nameplates, the set and the main panel save a site visit.
What should I do when my generator will not start?
Keep the set isolated, do not keep cranking it, and do not open a hot radiator cap. Call or WhatsApp 98852 01608 with the location, the make and rating, whether it cranks, the alarm or fault message on the controller and what happened just before it stopped. A photograph of the controller screen often narrows the fault to one or two causes.
Engineering content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. For advice on your own site, send us your requirement or call 98852 01608.