In short. Four calculations come up on almost every generator job: converting between kW and kVA, working out the current a set delivers, understanding power factor, and estimating how long the fuel will last. Each guide below shows the formula, a worked example with real Indian site values (415 V, 50 Hz, 0.8 PF), and the common mistakes that lead to an undersized set or a dry tank.
Where to start
| If your question is… | Start with |
|---|---|
| Converting kW to kVA and back | kW ↔ kVA Guide |
| Full-load current for cable and breaker sizing | Generator Current Guide |
| What power factor means for a generator | Power-Factor Guide |
| How long the fuel will last | Fuel Runtime Guide |
All 4 guides in this section
- kW ↔ kVA Guide — Understand the difference between kW and kVA, convert between them with the right power factor, and see why kVA is only the first step in generator sizing.
- Generator Current Guide — Calculate generator full-load current from kVA and voltage for three-phase and single-phase supplies, with a 415 V reference table and the limits of the figure.
- Power-Factor Guide — What power factor means for a diesel generator, how lagging and leading loads affect the alternator and AVR, and how to handle capacitor banks on generator.
- Fuel Runtime Guide — How to calculate how many hours a diesel generator will run on the fuel it really has, allowing for unusable volume, reserve, load profile and refuelling.
The generator formulas on one card
Almost every generator calculation reduces to a handful of relationships between kW, kVA, power factor, voltage, current and fuel. The card below collects them with the units each expects; the guides in this section explain each one in depth.
| To find | Formula | Example |
|---|---|---|
| kVA from kW | kVA = kW ÷ power factor | 100 kW at 0.8 = 125 kVA |
| kW from kVA | kW = kVA × power factor | 250 kVA at 0.8 = 200 kW |
| Reactive power | kVAr = √(kVA² − kW²) | 187.5 kVA and 150 kW give 112.5 kVAr |
| Three-phase current | I = kVA × 1000 ÷ (1.732 × V) | 125 kVA at 415 V = 174 A |
| Single-phase current | I = kVA × 1000 ÷ V | 15 kVA at 230 V = 65 A |
| Fuel per hour | L/h = kW × litres per kWh at that load | 150 kW × 0.29 = 43.5 L/h |
| Runtime | hours = usable litres ÷ L/h | 891 L ÷ 43.5 L/h = about 20 h |
| Data sheet fuel | L/h = g/kWh × kW ÷ 840 | 210 g/kWh at 400 kW = 100 L/h |
| Engine speed | rpm = 120 × frequency ÷ poles | 50 Hz with 4 poles = 1500 rpm |
Worked example: from load to fuel plan (illustrative)
A factory office block draws 150 kW at a power factor of 0.8 during an outage, and the owner wants to know the set, the current and how long the base tank lasts.
| Step | Working | Result |
|---|---|---|
| Load in kVA | 150 ÷ 0.8 | 187.5 kVA |
| Set rating | 187.5 ÷ 0.75 for a comfortable loading | 250 kVA, running at 75% |
| Running current | 187.5 × 1000 ÷ (1.732 × 415) | About 261 A |
| Full-load current of the set | 250 × 1000 ÷ (1.732 × 415) | About 348 A, which sets the breaker and cable |
| Fuel at this load | 150 kW × about 0.29 L per kWh | About 43.5 L/h |
| Usable fuel | 990 litre base tank × 0.9 | About 891 litres |
| Runtime | 891 ÷ 43.5 | About 20 hours |
Each step uses one formula from the card, and each result feeds the next. The chain stops being reliable the moment one unit is mixed up, which is why the units are written beside every figure.
Quick reference: current and fuel for common ratings
| Set rating | kW at 0.8 power factor | Full-load current at 415 V | Fuel at full load (chart value) |
|---|---|---|---|
| 62.5 kVA | 50 kW | 87 A | About 15.5 L/h |
| 125 kVA | 100 kW | 174 A | About 28 L/h |
| 250 kVA | 200 kW | 348 A | About 56 L/h |
| 500 kVA | 400 kW | 696 A | About 108 L/h |
| 1000 kVA | 800 kW | 1391 A | About 200 L/h |
The full ranges, with makers’ data and every rating from 7.5 to 3000 kVA, are in the full-load current chart and the DG fuel consumption chart.
Six checks that catch most calculation errors
- kW or kVA? A load schedule in kW and a set rating in kVA cannot be compared until the power factor is applied.
- Which voltage? Current at 400 V is about 3.75% higher than at 415 V for the same kVA; use the voltage the set actually runs at.
- Which power factor? Diesel sets are rated at 0.8; a load at 0.9 does not give more kW, because the engine limits real power.
- Usable or nominal fuel? Tanks are rarely fully usable; 80 to 90% is a common planning figure.
- Load-dependent fuel? Litres per kWh rise at light load, so a half-loaded set does not run twice as long.
- Rounded too early? Round the final answer, not each step, or small errors add up across the chain.
When a calculation is not enough
Simple formulas size the steady load. They do not tell you whether the largest motor will start, how deep the voltage dip will be, how harmonics from drives and UPS will heat the alternator, or how a hot plant room reduces the rating. Those questions need the alternator data, the load profile and site conditions, and on larger installations they become engineering studies. The calculation guides below give the first answer; the motor starting, derating and power quality guides elsewhere on the site take it further. For a review of your own figures, send them through the application engineering enquiry.
Units used in these guides
- kW: real power, the work the load does and the figure fuel follows.
- kVA: apparent power, the figure a generator set is rated and ordered by.
- kVAr: reactive power, drawn by motors and transformers to set up their magnetic fields.
- Power factor: kW divided by kVA; 0.8 lagging is the rating basis of diesel sets.
- A: current per phase, which sizes breakers, cables and busbars.
- L/h and L/kWh: fuel per hour and fuel per unit of energy, the second being the fair way to compare sets and loads.
kW and kVA in practice
The difference between kW and kVA is the most common source of an undersized set. A load schedule written in kW tells you the work done; a generator is limited by both the engine, which caps kW, and the alternator, which caps kVA through its current. At the rated power factor of 0.8 the two limits meet.
If the real load runs at a poorer power factor, say 0.7, the alternator reaches its kVA limit before the engine reaches its kW, so a 250 kVA set carries only about 175 kW. If the load runs at a better power factor, the engine limit applies first and the set still delivers no more than 200 kW. Working in kVA for the alternator and kW for the engine, and checking both, removes the problem. See the kW and kVA guide.
Power factor on generator supply
Power factor correction capacitors that suit the utility supply can cause trouble on a generator. At light load, a fixed capacitor bank can push the power factor leading, and an alternator running leading can lose voltage control, because its regulator has to reduce excitation to hold voltage. The usual cures are to switch capacitor banks off on generator supply, or to use automatic banks that follow the load, and to check the alternator capability chart for the leading limit. See the power factor guide.
Using the current figure correctly
Full-load current is the steady figure at rated kVA and voltage. It sizes the breaker frame, the cable and the busbars, but it is not the whole story: a motor start can draw several times its running current for a few seconds, harmonic currents from electronic loads add heating, and the neutral on buildings with many single-phase electronic loads can carry more current than the phases.
Single-phase sets draw much more current for the same kVA than three-phase sets, because one conductor carries it all: 15 kVA is about 65 A at 230 V single-phase against about 21 A per phase at 415 V three-phase. See the generator current guide.
Fuel runtime beyond the base tank
A runtime figure is only as good as the load and fuel assumptions behind it. Plan on the usable fuel, not the nominal capacity; work at the real load, not the rating; keep a reserve so the set never runs the tank dry, which draws in sediment and air; and schedule the refill before the low-level alarm, allowing for how long a delivery takes after a storm or on a holiday. For long outages the base tank becomes a day tank fed from bulk storage, and the transfer pump becomes part of the reliability of the whole system. See the fuel runtime guide.
Sizing from the electricity bill: what it can and cannot tell you
The maximum demand on a commercial or industrial electricity bill, in kVA, is a useful starting point because it is measured rather than estimated. It is not a generator size on its own. It is usually an average over a short demand interval, so it hides motor starts; it includes loads that need not run on the generator; and it says nothing about the power factor at the moment of the peak. Use it to check a load list, not to replace one, and add the largest motor start and any UPS recharge before choosing a rating.
From a calculated figure to a standard rating
Calculations produce awkward numbers; generator sets come in standard ratings. Common ratings in India include 15, 20, 25, 30, 40, 62.5, 82.5, 100, 125, 160, 180, 200, 250, 320, 380, 400, 500, 625, 750, 1010, 1250, 1500 and 2000 kVA, with others available from individual makers. The rule is simple: take the calculated kVA after allowing a comfortable running margin, then choose the next standard rating up, and check that rating against the largest motor start and the site conditions.
Two cautions apply. A calculated figure that lands just above a standard rating, such as 128 kVA, should not be squeezed onto the 125 kVA set below it on the hope that the load is overstated; it should either be checked with measured data or move up a step. And a figure far below the next rating, such as 90 kVA against a 125 kVA set, is a warning of light loading, wet stacking and poor fuel economy, which a smaller set or a measured load study may avoid.
Where a measured load profile is available, it replaces every assumption above. A week of logged readings on the incoming supply, covering a hot afternoon and the busiest working hours, gives the real running kW, the real power factor and the real peaks, and a calculation built on those figures is one the whole project team can trust.
Questions engineers ask
How do I convert kW to kVA for a generator?
Divide kW by the power factor. Generators are rated at 0.8 PF, so 100 kW of load needs at least 125 kVA before any margin for motor starting or growth. Then check the largest motor start, the site ambient temperature and altitude, and any harmonic loads, because these often decide the final rating rather than the running kW alone.
What is the full-load current of a 125 kVA generator at 415 V?
About 174 A per phase. Line current is the apparent power divided by the square root of three times the line voltage: 125 × 1000 ÷ (1.732 × 415) = 173.9 A. The figure is the same at any power factor, because kVA already includes it; at 400 V it rises to about 180 A and at 433 V it falls to about 167 A. Size breakers and cables on this full-load current, with derating for grouping, ambient temperature and route length applied on top. The formula in short: kVA × 1000 ÷ (√3 × 415).
How do I calculate kVAr for a generator load?
Take the square root of kVA squared minus kW squared. A load of 187.5 kVA at 150 kW draws about 112.5 kVAr. The figure shows how much reactive power the alternator must supply, which matters for motors, transformers and capacitor banks, and it is the reason a set can reach its kVA limit before its kW limit.
How long will a generator run on a full tank?
Divide the usable fuel by the litres per hour at the real load. A 990-litre base tank with about 90% usable holds about 891 litres, and a 250 kVA set carrying 150 kW uses about 43.5 litres an hour, so it runs about 20 hours. At lighter load it runs longer, but not in proportion, because fuel per kWh rises.
Engineering content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. For advice on your own site, send us your requirement or call 98852 01608.