Four 30 kVA generators powering a private bank’s Hyderabad branches since 2017 and 2019

Four 30 kVA rental generators backing up a bank’s Hyderabad branches under nine-year leases, two since 2017 and two since 2019, with no complaint recorded.

In short. Since late 2017, Reddy Generators has supplied and maintained 30 kVA rental generators at four Hyderabad branches of a private-sector bank: Hitech City (Madhapur), Secunderabad Cantonment, Kothapet (Dilsukhnagar) and Vanasthalipuram. The sets run under nine-year leases and have kept the branches supplied through grid failures ever since: more than eight years at Kothapet and Vanasthalipuram, and since 2019 at Hitech City and Secunderabad Cantonment, with no service complaint recorded by the bank in that time, according to Reddy Generators’ records.

ClientA private-sector bank (name withheld)
BranchesHitech City (Madhapur), Secunderabad Cantonment, Kothapet (Dilsukhnagar), Vanasthalipuram
Equipment4 × 30 kVA diesel generators, one per branch
ContractDG rental agreements dated 21 November 2017 (Dilsukhnagar and Vanasthalipuram) and 2019 (Hitech City and Secunderabad Cantonment); nine-year minimum terms, since extended
HandoverKothapet (Dilsukhnagar) 20 December 2017; Vanasthalipuram 1 March 2018; Hitech City and Secunderabad Cantonment 2019
ScopeSupply, connection to the branch panel, maintenance and breakdown attendance
StatusRunning; leases extended

The requirement

A bank branch cannot close its counters, ATMs or core-banking terminals because the grid fails. The bank’s branch set-up team wanted each new Hyderabad branch to have its own backup generator, installed into the branch distribution board and maintained for the life of the lease by one supplier.

How it has run

Each branch received a 30 kVA set connected into its panel, with possession formally handed over to the branch on commissioning. Reddy Generators has carried all servicing and breakdown attendance since, and the leases have continued without any break in service.

What a bank branch needs during a power cut

A branch cannot stop serving customers when the grid fails. Its loads are modest in size but varied in sensitivity, and the generator has to support all of them in the right order.

Load (illustrative)SensitivityUsual arrangement
Core banking terminals and networkVery highBehind a UPS, backed by the generator
ATM and its coolingVery highBehind a UPS, backed by the generator
CCTV and alarm systemsVery high, for securityBehind a UPS, backed by the generator
LightingMediumOn the generator
Air conditioningComfort, but largeOn the generator, with staggered restart

Worked example: checking a 30 kVA set for a branch (illustrative)

A 30 kVA set gives 24 kW at 0.8 power factor. A branch might run about 6 kW of terminals, network, ATM and security through its UPS, 4 kW of lighting and about 9 kW of air conditioning from four or five split units, roughly 19 kW in total. That leaves margin for the UPS to recharge after an outage and for the air-conditioning units to restart. If every unit tried to restart at once, the brief surge could exceed what the set accepts comfortably, so restarts are staggered by a few seconds each.

Connecting into the branch panel

A branch generator works only as well as its connection. The changeover arrangement must keep mains and generator from ever being connected together, the generator earth must be tested and bonded to the branch earthing, and the cable must be sized for the full set rating. The UPS input settings are checked for generator operation, so the UPS stays on its rectifier rather than draining its batteries whenever generator frequency moves slightly.

Maintaining sets across several branches

Several branches spread across a city need a coordinated plan rather than separate arrangements.

ActivityApproach for multiple branches
Routine servicePlanned route covering branches in turn, at the six-month or hour limit
Coolant replacementYearly, grouped with a service visit
Starting battery checksAt every visit, because branch sets may stand idle for long periods
Load testAt least yearly, by load bank if the branch load is light
RecordsOne format for all branches, so the bank sees a consistent picture

Service visits in a secure environment

Banks have strict access and security rules. Service visits are arranged with the branch in advance, staff carry identification, generator areas are kept locked, and keys are controlled. Visits are timed to avoid disturbing customers, and any work that needs a planned interruption of supply is agreed with the branch manager beforehand.

Location, noise and exhaust in commercial buildings

Branches often sit in busy commercial buildings, so the set is usually placed in a car park, terrace or service yard. Acoustic enclosures keep noise acceptable for neighbours and customers, exhaust is directed away from windows, air intakes and walkways, and the set is protected from vehicles. The area around it is kept clear so it can be serviced and refuelled safely.

A nine-year lease in numbers (illustrative)

If a branch set runs about 300 hours a year, a nine-year lease adds up to roughly 2700 hours. Because the six-month limit arrives before the hour limit, it would receive about eighteen oil and filter services and nine coolant changes over the term, with several starting battery replacements. Planning these as part of the lease, rather than reacting to faults, is what keeps a small set reliable for close to a decade.

Records that support bank audits

Banks are audited regularly, and backup power is part of business continuity. A record for each branch showing service dates, test results, hours run, fuel and any faults gives auditors the evidence they need and lets the bank compare its branches at a glance.

Lessons for similar branch networks

For bank branches, reliable backup comes from simple disciplines applied consistently: the right set size with margin for restarts, a sound connection into the branch panel, UPS settings that suit generator supply, regular battery checks on sets that rarely run, and one maintenance plan and record format for all branches. These keep counters, ATMs and security systems working whenever the grid fails.

The restart order after a transfer

When the branch moves to the generator, UPS-backed loads continue without a break, so the first loads the set sees are the UPS recharge, lighting and air conditioning. A sensible order is to let lighting return at once, allow the UPS to begin recharging, and bring air-conditioning units back one by one over the following minute. On a 30 kVA set this simple sequence keeps every step comfortably within what the engine accepts.

Worked example: fuel for a branch set (illustrative)

At about 19 kW and roughly 0.30 litres per kWh, a branch set uses close to 6 litres an hour. An eight-hour outage during banking hours uses about 45 litres. Keeping the base tank above a level that covers at least a full working day, and recording the level after every run, means the branch is never caught short during a long outage.

Testing without disturbing customers

A meaningful test transfers the branch to the generator and runs it on load, which is best done just before opening or after closing, or on a quieter afternoon agreed with the branch. Where the branch load is too light to load the engine properly, a portable load bank is used outside banking hours, so the set is proved at a healthy load without any effect on customers.

Earthing in multi-storey commercial buildings

A branch in a commercial building shares the building earthing system with other tenants. The generator earth is tested and connected to the building main earthing bar, so no voltage difference can appear between the generator frame and the branch equipment during a fault. Where the set stands on a terrace or in a basement far from the main bar, the bonding conductor is sized and protected for its route.

When a branch moves or is refitted

Branches are refurbished, enlarged or relocated during long leases. Each change is a chance to recheck the load, the set size and the connection. A rental arrangement makes it straightforward to move the set to a new address, or exchange it for a different size, rather than leaving the branch with equipment that no longer matches its needs.

Monsoon precautions

Basement and yard locations can flood in heavy rain. Sets are placed on raised plinths where needed, cable joints are sealed, and the area is checked after heavy rain before the set is relied on again.

Sizing the branch UPS alongside the generator

The branch UPS only needs to bridge the seconds between mains failure and the generator taking load, plus a margin in case the first start fails. Sizing it for that duty rather than for a long runtime keeps its batteries smaller and cheaper, but it makes generator readiness part of the branch continuity plan: the starting battery, fuel and automatic start are tested as carefully as the UPS itself.

Signs a branch set needs attention

Reporting any of these early allows a fault to be fixed before the next outage.

Outcome and limits

The first branches have been supplied continuously since late 2017, and each branch since its own handover. The statement that no service complaint has been recorded is based on Reddy Generators’ own records; branch-level outage logs are held by the bank and are not published.

Questions engineers ask about this project

Which bank branch loads need a UPS as well as a generator?

Core banking terminals and network equipment, the ATM and CCTV and alarm systems, because they cannot tolerate even a short break. They run through a UPS backed by the generator, while lighting and air conditioning run directly from the generator after transfer. The UPS bridges the seconds before the generator takes load.

Is a 30 kVA generator enough for a bank branch?

Often, depending on the load. In the illustrative branch, about 19 kW of UPS-backed equipment, lighting and air conditioning sits well inside the 24 kW the set gives, leaving margin for UPS recharge and staggered air-conditioning restarts after a transfer. The load is rechecked whenever the branch adds equipment.

How are generators maintained across several bank branches?

With one coordinated plan: a service route covering branches at the six-month or hour limit, yearly coolant changes, starting battery checks at every visit, at least yearly load tests and one record format for all branches, so the bank sees a consistent picture. Visits are agreed with each branch in advance.

How many services does a branch generator need over a nine-year lease?

In the illustrative case of about 300 running hours a year, roughly eighteen oil and filter services and nine coolant changes, because the six-month limit arrives before the hour limit, plus several starting battery replacements planned over the term. Planning these in advance keeps the set reliable for the whole lease.

How long can a generator rental contract run?

As long as the customer needs. These branch leases were written for nine years, which suits a bank that wants dependable backup without owning or maintaining the equipment. Leases can be extended when the branch needs, and each set is serviced and load-tested on a written schedule throughout.

Why would a bank rent rather than buy branch generators?

Renting keeps capital free, and the rental supplier carries the maintenance, repairs and replacement. The bank simply gets power when the grid fails. Every set is load-bank tested before dispatch, and service visits follow a written schedule, so each branch knows when its set was last checked and what was found.

What size generator suits a bank branch?

A 30 kVA set typically carries a branch’s lighting, computers, network equipment, ATMs and some air conditioning. The right size comes from the branch’s own load list. Measure the running load at peak time, check the largest motor start, and stagger air-conditioner restarts after each transfer to keep the set well within its rating.

Engineering record reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Client name withheld. Sources: DG rental agreements of 21 November 2017 and 20 March 2019, branch possession letters of December 2017 and March 2018, and lease records. Last reviewed: 20 October 2026.