In short. Since 2015, Reddy Generators has supplied a 125 kVA rental generator to a business services company at Begumpet, Hyderabad, and maintained it throughout. After more than ten years the contract is still running: the client has chosen, year after year, to keep renting rather than buy its own set.
| Client | A business services company (name withheld) |
|---|---|
| Site | Office, Begumpet, Hyderabad |
| Equipment | 1 × 125 kVA diesel generator |
| Scope | Rental, maintenance and breakdown attendance |
| Since | 2015, continuing (more than ten years) |
Why a customer keeps renting for ten years
A business services office runs on computers, networks and air conditioning, and needs power every working hour. Renting gives the client a working generator without owning it: servicing, repairs, parts and statutory upkeep stay with Reddy Generators, and the client pays a single monthly charge. When a rental continues for a decade, the customer is repeatedly choosing the service over the alternative of buying.
What an office load looks like on a 125 kVA set
A business services office of this kind runs a mix of loads that behave very differently on a generator. Computers and network equipment sit behind a UPS and draw a steady, slightly distorted current. Air conditioning is the largest block and the most demanding, because each unit draws a surge when it restarts after a transfer. Lighting, pantry equipment and small pumps make up the rest. Understanding this mix matters more than the total, because the restart of cooling, not the steady load, usually sets the limit.
| Load group (illustrative) | Typical share of running load | Behaviour on generator |
|---|---|---|
| Air conditioning | About half | Large restart surges; stagger after transfer |
| Computers, servers and network via UPS | About a quarter | Steady; UPS recharge adds load after an outage |
| Lighting | About a sixth | Steady; LED drivers add some distortion |
| Pantry, pumps and sundry | The remainder | Short motor starts from pumps |
Worked example: checking a 125 kVA set for an office (illustrative)
A 125 kVA set gives 100 kW at 0.8 power factor. Suppose an office of this size has a running load of about 70 kW on a hot afternoon. That leaves about 30 kW of headroom, which is useful, because after a mains failure the UPS recharges its batteries and several air-conditioning units try to restart within seconds of each other.
If six units of about 2 kW each restarted together, the brief surge could be several times their running current. Staggering their restart by a few seconds each, through the units themselves or a simple timer, keeps the step within what the set can accept. The headroom also covers growth: a few more workstations or another cooling unit can be added without changing the set, provided the load is checked again first.
A ten-year service plan for a rental set
A set that stays on one site for a decade needs a plan that runs by calendar as well as by hours. Office standby sets often run a few hundred hours a year, so the six-month limit usually comes first.
| Task | Typical interval |
|---|---|
| Oil and filter change | 250 to 500 running hours or six months, whichever comes first |
| Coolant replacement | Yearly |
| Starting battery test | At each visit; replacement as the test shows |
| Load test at a meaningful load | At least yearly, by load bank if the office load is light |
| Fuel tank drain and sample | Every few months |
| Changeover and control checks | At each visit |
| Major inspection or overhaul | By engine hours and condition, not by calendar alone |
Renting and owning compared
The choice between renting and owning a set is a comparison of who carries each cost and risk over the period, not just of monthly rent against purchase price.
| Item | When renting | When owning |
|---|---|---|
| Equipment purchase | Not needed | Paid at the start |
| Servicing and parts | Supplier responsibility | Owner arranges and pays |
| Breakdowns | Supplier attends and repairs | Owner arranges repair |
| Upkeep of approvals and records | Supplier supports | Owner manages |
| Fuel | Customer account | Owner |
| End of term | Return, renew or change size | Resale or continued use |
For an office whose core business is not engineering, transferring the servicing, repair and record-keeping to the supplier is often the deciding factor.
What makes a long rental installation work
- A proper earthing arrangement, tested at installation and periodically after.
- An armoured cable and changeover arrangement sized for the full set rating.
- A level base with drainage and space around the set for servicing.
- A running log of hours, fuel and service visits, visible to both sides.
- A named contact on the client side for access and daily checks.
These items do not change from year to year, but checking them at each service visit keeps the installation as sound in year ten as it was in year one.
Managing change over a long contract
Over a decade, offices change. Teams grow, cooling is added, and new rules on emissions or electrical safety may arrive. A long rental handles this best when the load is reviewed every year against the set rating, when any new rule is checked for its effect on the installed set, and when the contract allows the set to be changed for a different size if the load moves far from the original. Treating the rental as a living arrangement rather than a fixed purchase keeps it matched to the office it serves.
A short checklist for a business considering long-term rental
- List the loads and measure the running load on a busy day.
- Identify the largest restart surge, usually cooling.
- Decide what must run during an outage and what can wait.
- Agree the service plan, breakdown arrangements and record keeping in writing.
- Plan a yearly review of load, records and any new rules.
Keeping office equipment comfortable on generator supply
Office equipment cares about voltage, frequency and waveform. A healthy 125 kVA set holds voltage closely, but large steps can still cause short dips, and the UPS rectifier adds some distortion to the generator waveform. Three simple measures keep things steady: loads are restored in a sensible order after transfer, the UPS input settings allow the normal small frequency movement of a generator, and the set is never run so lightly loaded that its voltage regulator struggles. A brief recording during a planned test, with the office working normally, confirms that computers and network equipment ride through the transfer without resets.
Fuel management for an office standby set
An office set may stand for weeks without running, then carry the building through a long outage. Fuel in the base tank must be clean and enough for that outage. A practical routine is to record the fuel level after every run, keep the tank topped up above a set level, drain water from the bottom every few months and take a sample once a year. Because fuel is on the customer account in a rental, the running log of hours and fuel lets the client see exactly what was used and why, and makes it easy to reconcile deliveries.
Testing under realistic conditions
A start on no load proves very little. A meaningful test transfers the office to the generator, runs it at its normal load for long enough to reach working temperature, and checks that the return to mains is clean. Where the office load is light, a load bank supplies the missing load so the engine is proved at a healthy output and does not suffer from light-load running. Every rental set is load-bank tested before dispatch; periodic tests on site keep that confidence for the life of the contract.
What the client should see each month
- Hours run and the reason, such as outage or test.
- Fuel added and the level after each run.
- Service carried out, with readings taken.
- Any fault found and the action taken.
A short record like this turns the generator from an unseen box in the car park into an asset whose condition the office manager can follow.
Lessons for similar offices
For offices of this size, the most common problems are not engine failures but restart surges from cooling, flat starting batteries after long idle periods, and loads added over the years without anyone checking the set. Each is avoided by the same habits: a staggered restart, regular battery checks, and a yearly look at the load list. A rental arrangement that includes these habits as part of the service is what lets a contract run for many years with the generator ready whenever the mains fails.
Allowing for growth across the contract
An office that starts with a running load of about 70 kW may reach 85 or 90 kW over several years as staff numbers and cooling grow. At that point the 125 kVA set still carries the load, but with less margin for restart surges and hot afternoons. A sensible rule is to review the set size once the measured running load passes about 80% of its kW rating. In a rental, changing to a larger set at that point is a planned swap rather than a capital project, which is one of the practical advantages of renting over a long period.
Choosing and keeping a good location
Office sets usually sit in a basement car park, a ground-level yard or a terrace. Each location needs space for servicing on all sides, a clear path for fuel delivery, exhaust discharged away from windows and air intakes, and protection from vehicles. Over a long contract, the area around the set tends to fill with stored items or parked vehicles, so keeping it clear is part of every service visit. A set that can be reached easily is serviced properly; one boxed in by clutter is not.
Outcome and limits
The set has been in service at Begumpet since 2015 and the contract continues. This record is based on Reddy Generators’ contract records; operating logs are not published.
Questions engineers ask about this project
How is a 125 kVA generator checked for an office load?
Compare the running load with the 100 kW the set gives at 0.8 power factor, then check restart surges. In the illustrative office, about 70 kW of running load leaves headroom for UPS recharge and staggered air-conditioning restarts after a transfer, plus some growth before the set needs reviewing.
What service plan suits a generator rented for many years?
One that runs by calendar as well as hours: oil and filters every 250 to 500 running hours or six months, coolant yearly, battery tests at each visit, a yearly load test by load bank if the office load is light, fuel draining and changeover checks.
When should a long-term rental generator be changed for a larger one?
When the measured running load passes about 80% of the set kW rating, because margin for restart surges and hot afternoons is then thin. In a rental, swapping to a larger set is a planned change rather than a capital project, which suits growing offices.
What records should an office receive from its rental generator supplier?
Hours run and the reason, fuel added and the level after each run, service carried out with readings, and any fault with the action taken. A short monthly record lets the office manager follow the condition of the set and reconcile fuel on the customer account.
Is it cheaper to rent a generator for ten years than to buy one?
It can be, once maintenance, repairs, replacement parts, compliance and the cost of downtime are included. Renting moves all of those to the supplier, and the customer pays one predictable monthly charge. Compare both over the same period, including fuel and the value of reliable supply.
What keeps a rental generator reliable over many years?
Scheduled servicing, prompt breakdown attendance, and replacing worn parts before they fail. The supplier carries that responsibility for the whole contract. Oil and filters every 250 to 500 running hours or six months, coolant every year, and regular load tests keep the set ready for every outage.
Engineering record reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Client name withheld. Source: company contract records. Last reviewed: 20 October 2026.