How grid-forming and grid-following sources work together: who sets voltage and frequency, droop and virtual inertia, mode changes, island stability and common control conflicts.

In short. A grid-forming source sets voltage and frequency. A grid-following source reads them and injects power. An island needs at least one grid-forming source, and two sources fighting for the lead cause oscillation. Mode coordination defines who leads, who follows, how the lead is shared or handed over, and what happens when the leader trips.

Who this page is for: For control engineers and consultants on sites combining generators, solar and batteries, especially those that must run islanded.

Key facts

  • Synchronous generators are naturally grid-forming.
  • Typical solar inverters are grid-following and need a stable voltage to follow.
  • Battery inverters can be either, depending on mode and capability.
  • Several grid-forming sources can share the lead using droop.
  • If the only grid-forming source trips, the island collapses unless another takes over.
  • Grid-forming inverters give limited fault current; check protection in island mode.

Definitions

TypeBehaves likeExamples
Grid-formingA voltage source behind impedance; sets frequency and voltageSynchronous generators, grid-forming battery inverters
Grid-followingA current source; needs a stable voltage referenceTypical solar inverters, some battery modes

Worked example: a solar-heavy island (illustrative)

A remote site has 400 kW of solar, a 250 kVA (200 kW) generator and a 300 kW grid-forming battery inverter. Load at noon is 250 kW.

CaseLeaderOutcome
Generator off, battery grid-formingBatterySolar follows; surplus 150 kW charges battery until full, then solar is curtailed
Battery also in grid-following mode by mistakeNoneIsland cannot hold frequency; everything trips
Generator and battery both grid-forming without droop coordinationBothPower swings between them
Both grid-forming with matched droopSharedStable; each takes its share of steps
Battery trips while leading aloneNoneCollapse; the generator then starts and re-forms the bus (black start), unless it was already running and sharing the lead

The site’s controls were set so the battery leads by day, the generator is started automatically when battery charge is low, and both share the lead with matched droop while running together. See microgrid controller.

Do not run an island with only grid-following sources, or with two grid-forming sources that are not coordinated. Define the leader for every mode, and what takes over if it trips.

Coordination rules

  • Name the grid-forming source for each mode.
  • Share the lead with droop when more than one forms the grid.
  • Define handover: planned and on trip.
  • Limit solar output when the battery is full and no other load can take it, and keep any running generator above its minimum load with no reverse power.
  • Check island fault current and protection. See inverter fault current.
  • Detect islanding reliably. See islanding detection.

Leader and follower sheet

ModeGrid-formingGrid-followingIf leader trips
Grid-connected   
Island by day   
Island by night   

Worked example: what a grid-forming battery does for frequency (illustrative)

The rate at which frequency falls after a load step is the step times the frequency, divided by twice the stored kinetic energy in the island. For the remote site above, a 250 kVA generator with an inertia constant of about 1.5 s stores about 1.5 × 250 = 375 kW·s. A grid-forming battery inverter can be set to behave as if it had inertia; at an equivalent of 4 s on its 300 kW rating, it adds about 1200 kW·s.

Island makeupStored energyRate of fall for a 100 kW step
Generator alone375 kW·s100 × 50 ÷ (2 × 375) ≈ 6.7 Hz per second
Generator plus grid-forming battery375 + 1200 = 1575 kW·s100 × 50 ÷ (2 × 1575) ≈ 1.6 Hz per second

The battery cuts the initial rate of fall about fourfold, which gives the generator’s governor time to respond and keeps frequency above the trip settings of grid-following inverters. It is the main reason inverter-heavy islands use grid-forming batteries rather than relying on a small generator alone.

Worked example: is the island strong enough for the solar? (illustrative)

Grid-following inverters need a voltage stiff enough to follow. A common measure is the short-circuit ratio: the short-circuit capacity at the connection divided by the inverter rating. Many grid-following inverters are specified for a ratio of about 3 or more; check the maker’s figure.

Island modeShort-circuit capacityRatio for 400 kW of solar
Generator running, X″d about 0.12250 ÷ 0.12 ≈ 2083 kVA2083 ÷ 400 ≈ 5.2
Battery alone, limited to about 1.5 times 300 kWabout 450 kVA450 ÷ 400 ≈ 1.1

With the generator running, the solar sees a reasonably stiff source. With the battery alone, the island is very weak for the full solar output, and the inverters may oscillate or trip. The usual remedies are inverters specified for weak-grid operation, limiting solar output when the battery leads alone, or keeping the generator running at times of high solar output. Ask the inverter makers for their minimum ratio before designing the battery-only mode.

Grid-forming inverters have a current ceiling

A synchronous generator can deliver several times its rated current for a short time; a grid-forming inverter typically delivers only about 1.2 to 1.5 times. During a fault or a large motor start, the inverter reaches its limit and its voltage collapses instead of holding up. That limits the largest motor that can be started in a battery-led island, and it means fault protection in that mode must work at low currents. Check both before allowing the battery to lead alone.

Handing the lead over

HandoverSequence
Battery to generator, plannedGenerator starts and synchronises to the battery-formed bus; both share by droop; battery moves to grid-following or stays as a second leader
Generator to battery, plannedBattery confirmed grid-forming and sharing; generator unloads to a few percent; generator breaker opens
Battery leading alone tripsIsland collapses; black start from the generator follows
Generator trips while sharing with the batteryBattery carries the island alone if within its limits; shedding acts if not

Each row must be tested with load on. The first two should pass without the load noticing; the last two show how much margin the plant really has.

Settings for the followers in an island

Grid-following inverters carry trip windows for voltage and frequency written for the public grid. In an island, frequency and voltage move more, especially on generator alone, and windows set for the grid can trip all the solar on an ordinary load step, which then makes the step worse. Agree island-mode windows with the inverter maker and, where the utility rules allow, switch the inverters to them when the site islands, then back on reconnection.

Proving the leader logic

Test every mode on the leader and follower sheet with real load: a load step with each leader, a solar drop of several hundred kilowatts, each handover, and a trip of the leader. Record frequency, voltage and the power of each source through each event. A design that has only been simulated has not shown how the real inverters, governors and regulators behave together, and that interaction is exactly where islands fail.

Voltage control with mixed sources

The leader sets frequency and voltage, but every source can supply reactive power, and they must not fight over it. Generators share reactive power through their voltage droop; grid-forming inverters through a reactive droop; grid-following inverters usually run at a fixed power factor or follow a reactive set point. Match the reactive droop of the grid-forming sources on a per-unit basis, as for kW, and agree what the followers do with reactive power in each mode. Capacitor banks for power factor correction should be switched out or controlled when the site islands, because on a weak island they can lift the voltage beyond what the leader can hold.

Protection in each mode

ModeFault current availableProtection approach
Grid-connectedHigh, from the utilityNormal overcurrent and earth-fault settings
Island led by the generatorModerate, about three times the set rating sustainedGenerator setting group, voltage-restrained overcurrent
Island led by the battery aloneLow, about 1.2 to 1.5 times the inverter ratingEarth-fault and undervoltage-based tripping, sensitive settings, checked feeder by feeder

The protection setting group should follow the mode automatically, selected from the same signals the controller uses to choose the leader, so the settings in service always match the source that is actually supplying the fault.

Specifying inverters for island duty

  • Which inverters must form the grid, and in which modes.
  • Minimum short-circuit ratio at which grid-following inverters remain stable.
  • Island-mode voltage and frequency trip windows, and how they are switched.
  • Current limit and behaviour during faults and large motor starts.
  • Emulated inertia and droop settings, and how they are coordinated with the generators.

Put these in the purchase specification, not in a commissioning discussion; changing an inverter’s capability after delivery is rarely possible.

Keep the mode history

Log every change of leader, every handover and every follower trip with its time, the sources running and the frequency and voltage at the moment. Over months this history shows whether handovers are clean, whether followers trip on ordinary events, and whether the island spends long periods in its weakest mode. Those are the facts that justify a settings change, an extra source or a different inverter, and they are hard to argue with when they come from the plant itself.

Curtailing solar without losing the lead

When the battery is full and the load is light, surplus solar has nowhere to go, and if nothing limits it the frequency rises until inverters trip. The cleanest arrangement is for the grid-forming battery to raise the island frequency slightly as it approaches full charge, and for the solar inverters’ frequency response to reduce their output as frequency rises, so curtailment happens without any communication at all. A controller command to limit solar is then the normal path and the frequency response is the backup. Both should be tested with the battery deliberately held at full charge on a bright day.

Common mistakes

  • No grid-forming source in the island.
  • Two leaders without droop coordination.
  • No plan if the leader trips.
  • Grid-connected protection settings used in the island.

What to send us

Send the source list with inverter modes and the single-line diagram. WhatsApp 98852 01608 or use the application engineering enquiry.

Evidence note. Ratings and outcomes are illustrative; studies and makers’ data govern.

Questions engineers ask

How much does a grid-forming battery reduce frequency swings?

It adds stored energy, real or emulated, that slows the rate of frequency change. A 250 kVA generator with an inertia constant of 1.5 s stores about 375 kW-s, so a 100 kW step drops frequency at about 6.7 Hz per second. A 300 kW battery emulating 4 s adds about 1200 kW-s, cutting the rate to about 1.6 Hz per second.

What short-circuit ratio do grid-following inverters need?

Many are specified for a short-circuit ratio of about 3 or more: source short-circuit capacity divided by inverter rating. A 250 kVA generator gives about 2083 kVA, a ratio of about 5.2 for 400 kW of solar, but a 300 kW battery limited to 1.5 times gives only about 450 kVA, a ratio near 1.1, too weak for many inverters.

Can solar run alone in an island?

Not with ordinary grid-following inverters, which need a voltage and frequency to follow and stop when they lose it. An island needs at least one grid-forming source, a generator or a grid-forming battery inverter, and enough strength at the connection point for the solar inverters to follow it stably. Some inverters can form the grid, but few solar installations use them.

Do generators count as grid-forming?

Yes. A synchronous generator behaves as a voltage source behind its internal reactance, setting voltage and frequency and supplying inertia and high fault current naturally. Several generators share the lead through their droop settings. Their limits are minimum load, step acceptance and start time rather than any inability to form the grid.

Why do inverters trip in weak islands?

Because island voltage and frequency move further and faster than on the public grid, and inverter trip windows written for the grid are exceeded on ordinary load steps. Weak sources, with a low short-circuit ratio, can also make inverter control loops interact and oscillate. Island-mode windows, weak-grid settings or a stronger source address it.

Is virtual inertia needed?

For islands dominated by inverters, it helps a great deal: a grid-forming battery emulating inertia slows frequency changes, giving governors time to respond and keeping followers inside their trip windows. On a generator-led island with modest inverter capacity it is less important. A study of the largest steps and source trips decides.

This guide gives general principles. Confirm with inverter manufacturer data.