Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Rice & Grain Processing Power

How to size a rice mill generator from the drive list, loaded restarts of whiteners and elevators, fan transients, colour sorter protection and prime duty.

In short. A rice mill is a chain of motor-driven machines, elevators and fans that must start in order and often restart loaded with grain after an outage. The generator is sized from a process-linked load register and the loaded restart, not from total horsepower, with attention to whiteners and polishers, fans, the parboiling plant and the sensitive colour sorters. On the rural feeders that serve most mills the set runs long hours and must be rated for it.

A mill runs on a sequence, not a single motor

Paddy moves through intake, pre-cleaning, parboiling and drying where applicable, dehusking, paddy separation, whitening, polishing, grading, colour sorting, and packing, and between every stage there are elevators, conveyors and aspiration fans. Each machine is driven by its own motor, and the plant control starts them downstream first so that nothing receives grain before it is running.

In the milling clusters around Miryalaguda, Nizamabad and the Godavari districts, a 4 to 8 tonne per hour mill typically has 150 to 400 kW of connected motor load spread over thirty or more drives, nearly all started direct-on-line. On a weak rural feeder, for several hours a day the generator is the process’s only supply. The sizing method we apply is described in generator sizing and load inventory.

Build the load register around the process

A customer who says the mill has 250 horsepower of motors has given useful information, but not a generator specification. The register should list every significant drive with its kW, starting method, process stage, duty and the other drives that run with it. From that register the running demand, the simultaneous groups and the largest starting events fall out, and the generator is selected from those.

Machine groupTypical motor rangeStarting behaviourNotes for generator design
Pre-cleaners, destoners, paddy separators2 to 10 kW eachDOL, light startMany small motors; count them as a group
Rubber roll shellers and huskers5 to 15 kWDOL, moderate startAspiration fan started with it
Whiteners and polishers15 to 75 kW each, often several in seriesDOL, heavy and loaded restartUsually the governing starts; sequence them
Aspiration, husk and dryer fans5 to 55 kWDOL or star-delta, high inertiaSeveral fans together produce a large transient
Elevators and conveyors1 to 7.5 kW eachDOL, may be loaded with grainDownstream first; loaded restart torque
Parboiling plant: soaking pumps, boiler fans and feed pumps5 to 30 kWDOL or star-deltaBoiler controls on UPS; husk-fired boiler needs fans continuously
Colour sorters and their compressed-air plant1 to 3 kW electronics plus 7.5 to 22 kW motorElectronics sensitive; motor DOLSorter on UPS or stabiliser; motor unloaded start

Empty start and loaded restart are different events

On a normal morning start the machines are empty and come up one at a time. After an unplanned outage the whiteners hold rice under pressure and the elevators and conveyors are full of grain. Restarting a loaded whitener or a full elevator demands far more torque, and therefore current, than its empty start, and some machines must be emptied by hand before they can be restarted at all. The generator’s transient capability and the mill’s recovery procedure both have to be written for the loaded case. A set that starts the plant comfortably each morning can trip on under-frequency when a loaded polisher is restarted after an outage.

kVA_start ≈ P_motor × k_start / (η × PF)

P_motor is the motor rating in kW, k_start the ratio of starting to full-load current for the starting method, and η and PF the motor’s efficiency and power factor at full load. A worked example (illustrative): a 55 kW whitener started DOL at 6.5 times full-load current, with efficiency 0.92 and power factor 0.86, draws about 55 × 6.5 / (0.92 × 0.86), close to 450 kVA, for the start.

If the generator is already carrying 120 kW of fans, elevators and the first whitener, the set must accept a transient near 600 kVA while holding voltage within the limits the contactors and sorter electronics accept. A 250 kVA set that carries the mill’s running load with ease cannot do this; a set in the 320 to 400 kVA range, or a soft starter on each whitener, is the usual answer. See motor starting and voltage dip.

Fans, sorters and capacitors

Aspiration fans run throughout the plant, and parboiling mills add dryer fans and the fans of a husk-fired boiler. Fans are high-inertia loads with long acceleration times, and several started together produce a transient as large as the biggest whitener. The dryer and boiler need their fans continuously, so the step sequence should restore them before the milling section, with the boiler’s combustion controls on a UPS or stabilised circuit.

Colour sorters, electronic weighers and the plant PLC are small loads but intolerant of the dips that DOL starts cause on a generator. Feed them through a UPS or at minimum a servo stabiliser, and sequence the big starts away from them.

Most mills also have power factor correction capacitors on the main board, and these must be disconnected when the generator supplies the plant; a lightly loaded alternator feeding a fixed capacitor bank sees a leading power factor and loses voltage control, so an interlock on the changeover is the fix. Husk and bran dust is combustible and abrasive, so the generator room belongs outside the milling building, drawing clean air. See power factor and generator room ventilation.

Duty rating and running hours

Where the feeder fails for three to six hours a day in season, a mill’s generator may accumulate 1500 hours a year or more. That is prime duty, and a standby-rated set used this way will need overhaul early and will run outside the manufacturer’s terms. Sets in this duty should be prime rated, serviced by hours run, and fuelled from a clean, filtered storage tank rather than barrels, because new CPCB IV+ engines are more sensitive to fuel quality than those they replace. Mills that add a line should revisit the generator rather than assume it will cope. See prime power generators.

A rice mill load register (illustrative)

A mill processing paddy through cleaning, parboiling, drying, hulling, whitening, polishing, grading and sorting runs on a sequence. The register lists the sections in the order they start, because that order decides the generator.

SectionMain motorsRunning kWStarting method
Pre-cleaning and elevatorsCleaner, elevators, conveyors20Direct on line, small motors
HuskingRubber roll huskers, aspirators35Star-delta
Whitening and polishingWhitening machines, polishers90Star-delta or soft start
Grading and sortingGraders, colour sorter15Sorter on UPS-backed supply
Fans and dust controlBlowers, cyclones30Star-delta
Total190

The running load of 190 kW is about 238 kVA at 0.8 power factor. The largest single start is a whitening machine, and the hardest event is a loaded restart after a power cut. A 320 kVA set, with sections restarted in order and the whitening machines started one at a time, carries the mill at about 74%.

Why the loaded restart is the real test

In the morning, machines start empty and the mill fills gradually, so each start is light. After a power cut mid-shift, every machine is full of paddy or rice. Huskers, whiteners and elevators must break away under load, drawing more current for longer. A set that starts the mill every morning without trouble can trip on the afternoon restart. Restart timers that bring sections back one by one, and clearing the heaviest machines before restarting where the process allows, solve most of these trips.

Capacitor banks on generator supply

Mills often have capacitor banks to correct power factor on the DISCOM supply. On a generator, a fixed bank left connected when the mill is lightly loaded can push the power factor leading, which many alternators handle poorly, causing voltage to rise and the regulator to lose control. Automatic banks set to disconnect on generator supply, or switched off by the changeover, avoid the problem.

Season and service

Mills work hardest after harvest, often in two or three shifts, in dust from husk and bran. On our standard, oil and filters are changed every 250 to 500 running hours or six months, whichever comes first, and coolant is replaced every year. During the season, air filters and radiator fins are cleaned far more often, because bran dust blocks them within days.

Dryers and parboiling plants

Parboiling and drying sections add boilers, steam pumps and dryer fans. A dryer stopped mid-batch can damage the grain, so dryer fans and the boiler feed pumps are given priority in the restart sequence, ahead of whitening and polishing. Where the dryer burner depends on electrical controls, those controls ride through on a small UPS so the burner restarts cleanly rather than locking out.

Common mistakes

What to send us

Send the drive list with motor kW, starting method and the stage each belongs to, the daily running pattern and outage hours in season, whether the mill has parboiling and drying, and the rating of the capacitor bank on the main board. For an existing set, add a nameplate photograph, the hours run per month and a description of when it trips. Send your generator requirement and we will come back with a restart sequence and the rating we would recommend.

Questions engineers ask

Why does a rice mill generator start the mill in the morning but trip after a power cut?

In the morning machines start empty and the mill fills gradually, so each start is light. After a mid-shift outage every husker, whitener and elevator is full and must break away under load, drawing more current for longer. Restart timers that bring sections back one by one solve most of these trips.

What generator size suits a mill with about 190 kW of running load?

About 238 kVA of running load, with the whitening machine as the largest start and a loaded restart as the hardest event. A 320 kVA set carries the mill at about 74%, provided sections restart in order and the whitening machines start one at a time.

What size generator does a rice mill need?

For a typical 4 to 8 tonne per hour mill the answer usually lies between 250 and 500 kVA, but it depends on the largest whitener or polisher start, how many fans start together and whether the restart is loaded. The drive list and the restart sequence decide it, not the total horsepower.

Why does the generator trip when we restart after a power cut, but not in the morning?

Because the machines are full of grain. A loaded whitener or elevator needs far more starting torque and current than an empty one, and the step exceeds the set’s capacity. Empty the critical machines before restart, sequence the starts, or fit soft starters on the largest drives.

Do we need to switch off the capacitor bank on generator?

Usually yes, or at least make it automatic. A fixed bank left connected at light load can push the power factor leading, which many alternators handle poorly, so voltage rises and the regulator loses control. Automatic banks set to disconnect on generator supply, or switched off by the changeover, avoid the problem.

Can the colour sorter run directly on the generator?

It can, but it is sensitive to voltage dips and distortion from other mill motors. A small UPS or a supply arranged so the sorter is not on the same feeder as large motor starts keeps it from resetting, and it is restarted after the heavy machines have settled on the generator.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 19 October 2026.

CallWhatsAppEnquire