In short. Transformer sizing for a generator-fed system has two parts. The steady-state part is simple: the transformer kVA must carry the demand after diversity, with margin for growth and site temperature. The harder part is energisation. A transformer draws magnetising inrush of several times rated current for a few cycles, and a diesel generator with high sub-transient reactance sees that as a severe voltage dip. The generator, not the transformer, is usually the limiting item.
Where transformers appear in a generator installation
Most generator sets sold in India below 1000 kVA produce 415 V directly and feed the switchboard without a transformer. A transformer enters the picture in four common situations: a step-up from a 415 V generator plant to an 11 kV campus ring main, a medium-voltage generator feeding step-down substations, an isolation transformer on a sensitive load, and a rental set back-feeding an existing 11 kV intake during a long DISCOM outage. Each case asks two questions: can the transformer carry the load, and can the generator energise it.
The steady-state calculation
S = (√3 × VLL × I) ÷ 1000
Here S is the three-phase apparent power in kVA, VLL is the line-to-line voltage in volts and I is the line current in amperes. Rearranged, it gives the full-load current on either side: a 1000 kVA transformer at 11 kV draws 52.5 A on the primary and delivers 1391 A at 415 V (illustrative). Those currents fix cable sizes, breaker ratings and CT ratios, which is why the kVA must be settled before switchgear is ordered.
The kVA itself should come from a load study rather than the sum of nameplates. Apply diversity, add known expansion, then derate for site conditions. Transformer ratings under IS 1180 and IS 2026 assume a reference ambient; a transformer in a poorly ventilated substation in Hyderabad in May runs hotter and should not sit at 100% for long periods. We normally look for 60 to 80% loading under the maximum demand the generator will actually carry. The generator sizing guide and the transformer capacity and loading calculator cover the demand side.
Why energisation is the real problem
When a transformer is switched onto a live source the core may saturate on the first half cycle, and the magnetising current can reach eight to twelve times rated current before decaying over several cycles to a few seconds. The peak depends on the point on the voltage wave at which the breaker closes and on the residual flux in the core, so it is partly chance. On a stiff DISCOM supply this is a nuisance.
On a diesel generator it is a different event. The alternator’s sub-transient reactance, typically 0.10 to 0.20 per unit, limits the current it can push into a near short circuit, and the inrush is drawn through that reactance. Terminal voltage collapses, the AVR forces field current to recover, and the controller may trip on under-voltage or over-current. The engine is hardly involved, because magnetising current is almost entirely reactive.
Three outcomes are possible: the set rides through a deep but short dip, the set trips, or the transformer’s primary protection operates on the inrush. Which one occurs depends on the ratio of transformer kVA to generator kVA, the alternator reactances, the excitation system and the protection settings. The transformer energisation and inrush study page describes how this is modelled.
How much generator does a transformer need
No single multiplier is correct for every case, but field experience and manufacturer application notes converge on a screening rule. A generator with rated kVA roughly equal to or greater than the transformer kVA, with a PMG-excited alternator and a sub-transient reactance at the low end of the range, will usually energise an unloaded transformer with a dip under 30%. A much smaller generator sees a deeper dip and tripping becomes likely. Treat the table as a screening guide; the final answer needs the alternator datasheet and a transient calculation.
| Transformer kVA relative to generator kVA | Typical energisation behaviour | What to do |
|---|---|---|
| Up to 50% of generator rating | Modest dip; energisation routine | Check protection settings only |
| 50 to 100% of generator rating | Noticeable dip; depends on X″d, excitation and residual flux | Transient check with alternator data |
| Larger than the generator | Deep dip, under-voltage trips, possible primary protection operation | Energise on voltage ramp, or split into smaller transformers |
| Several transformers closed together | Inrush adds up like one very large transformer | Stagger closing with time delays |
The soft energisation trick
The cleanest way to avoid inrush is not to switch the transformer onto a live bus at all. If the transformer breaker is closed while the generator is at rest and the set is started with the AVR ramping voltage from zero over a few seconds, the core flux builds gradually and there is no saturation transient. Many controllers offer a voltage ramp for this purpose. It only helps the first transformer at start-up; any transformer added later to a live bus sees full inrush.
Impedance, voltage drop and fault level
Transformer percentage impedance, usually 4 to 6% for distribution sizes, cuts both ways. Higher impedance limits secondary fault current and may allow lower-rated switchgear, but it increases regulation, so secondary voltage falls further as load rises. On a generator-fed system the generator’s own reactance is already large, so a high-impedance transformer compounds the dip under motor starting. The voltage drop guide covers the cable side of the same problem, and the fault current guide shows how generator and transformer impedances combine to set the short-circuit duty of the downstream board. Vector group matters too: a Dyn11 transformer gives a secondary neutral for earthing and blocks zero-sequence current between windings.
A worked example (illustrative)
A pharmaceutical unit near Hyderabad has an 11 kV intake and a 750 kVA Dyn11 transformer feeding a 415 V board with a measured maximum demand of 480 kVA. The DISCOM feeder will be out for ten days and a 415 V rental set will back-feed the transformer. A 500 kVA set would run at 96%, too high for ten days, so a 625 kVA set is chosen to keep loading near 77%.
Energisation is the issue: the transformer is 120% of the generator rating, and switching it onto a live set would produce a dip the under-voltage protection is unlikely to tolerate. The sequence adopted is to close the transformer breaker with the set stopped, start on voltage ramp, then close the 11 kV and 415 V feeders in turn, after confirming the primary protection will not operate on normal magnetising current.
Related photographs and videos
Worked example: choosing a transformer rating (illustrative)
A site has a measured maximum demand of 650 kVA and expects about 20% growth over the next few years, giving 780 kVA. Aiming to load the transformer to no more than about 80% at that future demand, the rating needed is 780 divided by 0.8, or 975 kVA, so a 1000 kVA unit is chosen. If a large share of the load is non-linear, such as drives and UPS, the extra heating from harmonic currents is checked as well, and a transformer designed for that duty or a larger rating may be needed.
Common distribution transformer ratings
| Rating range | Typical use |
|---|---|
| Up to about 315 kVA | Small commercial buildings, workshops |
| About 400 to 1000 kVA | Mid-size factories, hospitals, offices |
| 1250 kVA and above | Large plants, campuses, data centres |
One transformer or two
Two transformers each able to carry the essential load give continuity during maintenance or a fault, at the cost of more switchgear and space. One larger transformer is simpler and cheaper but leaves the site dependent on a single unit. The choice follows the same reasoning as generator redundancy: how much a loss of supply would cost the site.
Matching the transformer to the generator plan
Where generators feed through or alongside the transformer, its rating, impedance and vector group are chosen with the generator in mind. A transformer sized generously for growth may be much larger than the generator, which then has to energise it, so the energisation check is done at the same time as the sizing.
Recording the basis
The sizing note records the measured demand, growth allowance, target loading, harmonic content and any redundancy decision, so the choice can be reviewed when the site changes.
Common mistakes
- Sizing the generator from the transformer kVA alone, as if the transformer were a load; the real load is behind it and the rating only sets an upper limit.
- Ignoring inrush and discovering at commissioning that the generator trips every time the transformer breaker is closed.
- Specifying a transformer at 100% of the expected demand with no allowance for ambient temperature, which shortens insulation life in a hot substation.
- Energising several campus transformers simultaneously from one generator plant, which multiplies the inrush and collapses the bus voltage.
What to send us
Send a photograph of the transformer nameplate showing kVA, voltages, vector group and percentage impedance, and a photograph of the alternator nameplate so we can look up its reactances. Add the single-line diagram, the measured or estimated maximum demand on the secondary, and whether the transformer will be energised at start-up or switched onto a live bus. Use the application engineering enquiry and we will return a sizing and energisation recommendation.
Questions engineers ask
How is a transformer rating chosen for a growing site?
Add a growth allowance to measured maximum demand, then divide by a target loading. In the illustrative case, 650 kVA plus 20% growth gives 780 kVA, and at about 80% target loading that needs 975 kVA, so a 1000 kVA transformer is chosen, with its impedance then checked against the fault rating of the switchgear.
Do harmonic loads change transformer sizing?
Yes. Drives, UPS and other non-linear loads add heating from harmonic currents beyond what the kVA figure shows. Where they form a large share of the load, the extra heating is checked, and a transformer designed for that duty or a larger rating may be needed.
Is one large transformer better than two smaller ones?
One larger unit is simpler and cheaper but leaves the site dependent on it. Two units each able to carry the essential load give continuity during maintenance or a fault, at the cost of more switchgear and space. The cost of a supply loss decides.
Why must transformer sizing consider the generator?
A transformer sized generously for growth may be much larger than the generator that must energise it, causing heavy inrush and deep voltage dips. Its rating, impedance and vector group are therefore chosen with the generator plan, and the energisation check is done at the same time.
Can a 500 kVA generator energise a 1000 kVA transformer?
Not reliably when the transformer is switched onto a live bus; the inrush approaches the alternator’s short-circuit capability and the dip will often trip the set. If the transformer is already connected when the generator starts and the AVR ramps voltage gradually, the same generator usually energises it without difficulty.
Does transformer inrush load the engine?
Very little, because magnetising current is almost entirely reactive. The stress falls on the alternator and the AVR, which is why alternator reactance and excitation type matter more than engine rating for this event. Energising transformers one at a time with downstream loads open keeps the dip small.
What transformer loading is sensible on a generator-fed system?
Aim for 60 to 80% of transformer rating under the demand the generator will actually carry. That leaves margin for high ambient temperature, starting currents and the growth that almost always arrives. Check the loading against logged demand each year, and plan an upgrade before the margin is used up.
Do I need a transient study or is a rule of thumb enough?
For a single transformer well below the generator rating a rule of thumb is adequate. When the transformer approaches or exceeds the generator rating, when several transformers are involved, or when the installation is critical, a study using the alternator reactances is cheap compared with a failed commissioning.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 19 October 2026.