In short. A motor started direct-on-line draws six to seven times its running current at very low power factor, and the alternator’s voltage dips by an amount set by starting kVA, transient reactance and how fast the excitation system responds. A dip beyond about 20% risks dropping contactors and stalling the motor. The alternator, not the engine, is usually the limit in the first second, and a larger frame or PMG machine is often the cheapest fix.
What happens in the first second
At the instant a motor is switched on, its rotor is stationary and it looks to the supply like a transformer with a shorted secondary. The current is the locked-rotor value, typically six to seven times full-load current for a standard induction motor started direct-on-line, at a power factor of 0.2 to 0.4. Nearly all of it is reactive, and reactive current is what pulls an alternator’s voltage down, because it acts directly through the machine’s reactance.
The voltage falls within a cycle, the regulator drives the exciter towards its ceiling, and over the next few hundred milliseconds the voltage recovers as excitation builds and the motor accelerates. Only as the motor approaches speed does its power factor rise, at which point the engine sees the real-power demand and the governor has its own, slower, transient to manage. The engine side is covered under frequency dip; the alternator side is the subject here.
Estimating the dip
A first estimate of the voltage dip uses the alternator’s transient reactance and the motor’s starting kVA.
ΔV ≈ (X’d × Sstart ÷ Salt) ÷ (1 + X’d × Sstart ÷ Salt)
Here ΔV is the initial voltage dip as a fraction of nominal, X’d is the alternator’s per-unit transient reactance on its own base, Sstart is the motor’s starting kVA and Salt is the alternator’s rated kVA. As a worked example (illustrative), a 55 kW motor at 0.85 power factor and 92% efficiency draws about 70 kVA at full load; with a locked-rotor multiple of 6.5 its starting kVA is about 455 kVA. On a 500 kVA alternator with X’d of 0.20, the product is 0.20 × 455 ÷ 500 = 0.182, and the dip is 0.182 ÷ 1.182 ≈ 15%.
On a 320 kVA alternator with the same reactance the product is 0.284 and the dip is about 22%, enough to worry about. The estimate ignores regulator response and pre-load, and should be checked against the manufacturer’s motor-starting curves or a transient study for anything marginal. Our starting kVA guide explains how to find the starting multiple from the motor nameplate or code letter.
How much dip is acceptable
| Dip at the switchboard | Typical consequence | Usual verdict |
|---|---|---|
| Up to 10% | Barely visible, lighting flickers briefly | Acceptable for all loads |
| 10 to 20% | Noticeable flicker; most contactors and controls ride through | Acceptable for industrial sites; check sensitive electronics |
| 20 to 30% | Some contactors release, UPS may transfer to battery, motor torque falls to half | Marginal; acceptable only with agreement and testing |
| Above 30% | Contactors drop out, motor may stall, under-voltage protection operates | Not acceptable |
Motor torque falls with the square of voltage, so at 80% voltage the motor develops only 64% of its torque at every speed. A loaded conveyor, a crusher or a positive-displacement pump may fail to accelerate at all, drawing locked-rotor current until its overload trips, while a centrifugal pump or fan starting against a closed valve accelerates with ease. The load’s torque curve is as important as the motor’s current. The dip criteria are discussed under voltage dip.
Alternator choices that reduce the dip
- A larger alternator frame on the same engine. Starting kVA is reactive and demands little engine power. Raising Salt from 500 to 625 kVA in the example above, keeping the same engine, cuts the dip from 15 to about 13%, and a frame with lower transient reactance does better still. This is the standard remedy and costs far less than a larger engine.
- Excitation support. A permanent magnet generator or auxiliary-winding machine keeps full regulator power through the dip and reaches field ceiling faster, so the recovery is quicker and the minimum voltage is less deep. The architectures are compared under PMG and excitation.
- Lower transient reactance. Within a manufacturer’s range, frames differ in X’d, and the motor-starting curves published for each frame show the starting kVA it will accept for a given dip. Reactance values and their use are explained under reactance and short-circuit performance.
Reducing the demand instead
Where the alternator cannot be changed, the starting event can be made smaller. A star-delta starter reduces starting current and torque to a third of the direct-on-line values, with a transient at the changeover that can itself cause a dip. A soft starter limits current to a set multiple, commonly two and a half to four times full load, at the price of reduced starting torque and a longer acceleration.
A variable frequency drive starts the motor at little more than full-load current, but introduces harmonic current that the alternator must be sized for, as discussed under alternators and non-linear loads. Sequencing is the cheapest measure of all: start the largest motor first, when the set carries the least load and has the most margin, and interlock large motors so that two cannot start together. On an automatic changeover, the controller’s load-step sequence should be designed with this in mind rather than reconnecting every feeder at once.
Testing the installation
A calculated dip is a prediction; the commissioning test is the proof. Record voltage and frequency at the switchboard with a recorder that resolves individual cycles, start the largest motor with the agreed pre-load connected, and note the minimum voltage, the recovery time to within 5% of nominal and the behaviour of every contactor and drive. The motor must start against its normal load; a test with a different starting method, a different pre-load or an unloaded shaft does not represent the installation.
Working the dip out before the motor is bought
The dip a motor start produces can be calculated from four numbers, all of which are known before anything is ordered: the starting kVA the motor will draw, the generator rating, the load already on the set, and the alternator’s subtransient reactance. The relationship the site uses throughout is
dip = Sstart ÷ (Sstart + (generator kVA − running kVA) ÷ X″d)
The second term is the set’s stiffness: the capacity it has spare, divided by its reactance. That is why the same motor on the same set dips differently depending on what else is running, and why “will this set start that motor” is never answerable without the running load.
Take a 500 kVA set with a subtransient reactance of 0.12 per unit, already carrying 200 kVA, and a 75 kW motor. The motor’s running kVA is about 94, so its direct-on-line start draws roughly eight times that — 750 kVA, which is ten times its kilowatts and sits inside the nine to twelve times the site publishes. The stiffness term is (500 − 200) ÷ 0.12 = 2500. So the dip is 750 ÷ (750 + 2500) = 23%.
| Starting method | Starting kVA | Calculated dip | Against a 15% limit | What it costs elsewhere |
|---|---|---|---|---|
| Direct on line | 750 kVA | 23.1% | Fails | Nothing to buy, but the dip drops out contactors across the board |
| Star-delta | 250 kVA | 9.1% | Passes | A second transient at changeover, and no torque control |
| Soft starter, limited to three times full-load current | 282 kVA | 10.1% | Passes | Longer run-up, so more heating in the motor |
| Variable speed drive, ramped | 103 kVA | 4.0% | Passes comfortably | Harmonic current the alternator must then tolerate |
| Direct on line with the set otherwise unloaded | 750 kVA | 15.3% | Marginal | Requires sequencing every other load off first |
The last row is the one worth dwelling on, because it is the cheapest fix on the table and the one most often overlooked. The same direct-on-line start that fails at 23% with 200 kVA already running passes at 15.3% if the set is empty — the motor did not change, the stiffness did. On a site where the big motor starts at a predictable time, sequencing it before the rest of the load is free, and it is the first thing to try before buying a starter or a larger set.
Two cautions on the arithmetic. The reactance figure must be the alternator’s, from its own data sheet, and not a typical value: between 0.10 and 0.18 per unit is the usual spread for sets of this size, and at the top of that range the same calculation gives a materially worse answer.
And the starting kVA must be the motor’s, not a rule of thumb — a high-efficiency motor of the same rating often draws more starting current than an older one, because its rotor resistance is lower, so the newer motor is the harder start. Where either number is unknown, the honest approach is to calculate the range rather than a figure, and to design for the pessimistic end.
Common mistakes
- Sizing the set on running kVA and discovering the starting problem at commissioning; the only remedies then are a larger alternator or a change of starter.
- Using the motor’s running current multiplied by a guessed factor; the nameplate locked-rotor current or code letter gives the real starting kVA, which can differ by 30%.
- Buying a larger engine to cure a voltage dip; the dip is an alternator and excitation problem, and the engine helps only with frequency.
- Testing with the motor uncoupled; the current falls quickly on an unloaded shaft and the test proves nothing.
What to send us
Send the motor nameplate with kW, full-load current, locked-rotor current or code letter, and the starting method; a description of the driven load and whether it starts loaded or unloaded; the alternator nameplate and, if available, its transient reactance; and the load that will already be connected when the motor starts. Send your application details and we will give you a dip estimate and a recommendation on alternator frame and excitation, or use the motor-starting generator capacity calculator for a first pass.
Questions engineers ask
How is the voltage dip from a motor start calculated?
Dip equals the starting kVA divided by the starting kVA plus the set’s stiffness, where stiffness is the spare capacity divided by the subtransient reactance. A 500 kVA set at 0.12 per unit already carrying 200 kVA has a stiffness of 2500, so a 750 kVA direct-on-line start gives 750 divided by 3250, which is 23%.
What is the cheapest way to reduce a motor-starting dip?
Sequencing, before buying anything. The same 750 kVA direct-on-line start that gives 23% dip with 200 kVA already running gives 15.3% on an empty set, because the stiffness term changed rather than the motor. Where the large motor starts at a predictable time, starting it before the rest of the load costs nothing.
Why can the alternator be the limit when the engine has plenty of power?
Because the starting current is almost entirely reactive and demands little real power from the engine. It flows through the alternator’s reactance and pulls the voltage down; the engine only feels the load as the motor accelerates and begins to do work. An oversized alternator on an ordinary engine is a normal configuration for motor-heavy sites.
How much starting kVA can a generator of a given size accept?
As a rough screening figure, a standard shunt-excited alternator accepts a starting kVA about equal to its own rating for a dip near 20%, and a PMG machine with low reactance somewhat more. The manufacturer’s motor-starting curves give the actual figure for each frame and dip, and they should be used for any real decision.
Does a soft starter solve the problem completely?
It reduces the starting current to the set limit, which usually brings the dip within bounds, but it also reduces starting torque in proportion to the square of the current reduction. A load that needs high breakaway torque may not start on a soft starter at all, and a bypass contactor closing at the end of the ramp can give a second, smaller transient.
What about several small motors starting together after a changeover?
Their starting kVA adds. Ten 5 kW motors starting at once look like one 50 kW motor and can dip the voltage as badly. Automatic changeover sequences should stage the reconnection of motor feeders over a few seconds, which the controller or ATS logic can usually be set to do.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 19 October 2026.