In short. A UPS has both a kVA and a kW rating, and the load must fit within both. Add redundancy and growth allowance, then check the battery, input and generator impact of the result. Modern UPS often have a rated power factor of 0.9 to 1.0, so kW is the more useful figure for many loads.
Step 1: Know the load
- List each load’s kW and kVA, not just the nameplate. Measure where possible.
- Check power factor and crest factor, since non-linear loads draw peaky current.
- Identify inrush on start-up, such as transformers or motors.
- Split into loads that need UPS and those that do not. See no-break, short-break and long-break loads.
Step 2: Size the UPS
UPS kW ≥ Load kW × (1 + growth) ÷ Target loading
Example (illustrative): load of 96 kW and 100 kVA, 20 per cent growth and target loading of 80 per cent. kVA needed = 100 × 1.2 ÷ 0.8 = 150 kVA. kW needed = 96 × 1.2 ÷ 0.8 = 144 kW. A UPS rated 150 kVA at 0.9 gives 135 kW, so it fails the kW check. A 160 kVA unit at unity power factor (160 kW) passes both. The lesson is to check kW and kVA separately.
Step 3: Redundancy
For N+1 with modules, add a module. For 2N, each system carries the whole load. See modular UPS redundancy.
Step 4: Overload and short-circuit ability
UPS units typically accept short overloads, such as 125 per cent for several minutes or 150 per cent for seconds, but this varies. Check the inverter’s ability to clear downstream faults, since inverters supply limited fault current and may transfer to bypass to clear a fault.
Step 5: Efficiency
Efficiency falls at low load. Redundant or oversized UPS may run at 20 to 40 per cent, where efficiency is lower. Check the efficiency curve at your expected load, and consider eco modes only where the load tolerates them.
Step 6: Upstream impact
- Input power factor and harmonic current. See harmonic screening.
- Input current includes battery charging, so the input is higher than the load.
- On generator, walk-in and soft-start features reduce the step.
- Upstream breaker and cable sizing.
Step 7: Battery
Battery size follows the load and the autonomy. See UPS autonomy.
Worked check on the generator (illustrative)
The 160 kVA UPS at 90 per cent load and 95 per cent efficiency draws about 144 ÷ 0.95 ≈ 152 kW, plus battery charging of perhaps 10 kW, so around 162 kW input. With a rectifier power factor of 0.95, that is about 170 kVA of input apparent power, and the generator must be sized for it, plus harmonic effects. The generator rating is therefore greater than the UPS output rating, not equal.
Sizing a UPS
UPS kW rating ≥ load kW × (1 + growth) ÷ loading limit; check kVA with load power factor
Worked example (illustrative)
IT load of 160 kW with 20 percent growth and a target maximum loading of 80 percent: 160 × 1.2 ÷ 0.8 = 240 kW. Choose a 250 kW UPS (or 5 × 50 kW modules for N, with a sixth for N+1). If the UPS is rated 0.9 power factor in kVA, 250 kW corresponds to 278 kVA. Check the manufacturer’s kW rating, since many modern units are rated at unity.
| Check | Why |
|---|---|
| Load power factor | Leading loads reduce capacity on some units |
| Crest factor | Peak current capability for switch-mode supplies |
| Overload rating | Short-term overload for inrush |
| Input power factor and THD | Impact on generator |
| Efficiency at expected load | Operating cost |
| Fault current and bypass | Protection of downstream devices |
Generator sizing with a UPS
The generator must carry the UPS input power: UPS output ÷ efficiency plus battery recharge power. A 250 kW UPS at 95 percent efficiency draws 263 kW plus recharge, perhaps 20 percent more. For a six-pulse rectifier, add alternator margin for harmonics. See UPS and nonlinear loads.
Common mistakes
- Sizing on kVA alone.
- Forgetting battery charging power in the input.
- Ignoring crest factor of IT loads.
- Running a redundant UPS at very low efficiency without knowing.
What to send us
Send the load list, redundancy target and autonomy. Send your application details. See also UPS architecture.
Questions engineers ask
Is a UPS rated in kVA or kW?
Both. Check each, since the kW rating depends on the output power factor.
How much spare capacity should I leave?
Commonly 20 to 30 per cent for growth and tolerance, depending on policy and redundancy.
Why must the generator be bigger than the UPS?
Because of UPS losses, battery charging and input power factor and harmonics.
Can a UPS clear faults downstream?
Inverters supply limited current, so protection may rely on bypass or fast-acting devices.
Figures are illustrative. Use manufacturer ratings for design.