In short. Peak shaving limits the maximum power drawn from the utility by supplying the top slice of demand from a battery, a generator or controlled load reduction. The rating is set by the height of the peak above the target, and the energy by how long it lasts. Whether it pays depends on the tariff’s demand charges and the load profile, so peak shaving is a load data and tariff problem before it is a battery size problem.
The idea in one diagram’s worth of words
Suppose a factory’s demand rises to 1200 kW for part of the afternoon and the aim is to keep the import from the DISCOM at 900 kW. During that period roughly 300 kW must come from somewhere else: a battery discharging, a generator running in parallel, or loads deliberately switched off. The rest of the day the site imports normally and the battery recharges or the generator stands idle. The target is usually set by a contract demand or by the billing demand that triggers penalties, and the saving is the difference between the demand charge at 1200 kW and at 900 kW, less the cost of supplying the slice.
Power is easy, energy is the question
Three hundred kilowatts for fifteen minutes is 75 kWh. Three hundred kilowatts for four hours is 1200 kWh. The battery for the second case is sixteen times larger than for the first, for the same kW. Demand data without time resolution cannot distinguish the two, which is why half-hourly or fifteen-minute interval data from the meter or an energy logger is the first thing we ask for. The analysis must also show how many peak events occur per day and how much time there is between them to recharge.
Battery energy (kWh) = Σ over the peak period of (Demand − Target) × Δt ÷ (DoD × η)
Here Demand and Target are in kW, Δt is the interval length in hours, DoD is the usable depth of discharge and η the round-trip efficiency. Worked example (illustrative): a peak that exceeds the 900 kW target by an average of 220 kW for 2.5 hours needs 550 kWh of delivered energy; with 0.85 DoD and 0.9 efficiency that is about 720 kWh nameplate, and the PCS must be rated for the highest instantaneous excess, say 320 kW, not the average. The BESS power requirement calculator and its energy companion run this arithmetic from your data.
Battery, generator or load control
| Method | Suits | Cost drivers | Limits |
|---|---|---|---|
| Battery (BESS) | Short, frequent, predictable peaks of minutes to a few hours | Capital, degradation, auxiliary losses | Energy runs out on long peaks; capacity fades with cycling |
| Generator in parallel | Long peaks of several hours, sites with an existing set and synchronising gear | Diesel, maintenance, run hours, emissions | Requires utility paralleling approval; CPCB operating restrictions in some regions |
| Load control | Sites with deferrable loads such as chillers, motors, pumps | Controls, minor production impact | Limited by how much load can genuinely be deferred |
| Combination | Most industrial sites | Controller complexity | Needs a clear priority order |
Running a diesel set in parallel with the grid purely to shave peaks is possible, but the fuel cost per kWh is usually higher than the grid tariff, so the saving must come entirely from the demand charge and penalty avoided. The engineering note on peak shaving covers the generator calculation, and the utility paralleling guide covers the switchgear and protection the DISCOM will require.
Do not double-book the energy
A battery bought for peak shaving is also, in the owner’s mind, a backup source. The two duties collide at the worst moment: the afternoon peak drains the battery, and the evening grid failure finds it empty. If backup is a committed function, the EMS must reserve the backup energy and shave peaks only with what remains. That is a control allocation rather than a physical partition, but it must be defined, tested and reported. The same logic applies to black-start reserve and to any contracted grid service. One megawatt-hour cannot be promised to three obligations at once, and the kWh you must buy is the sum of them.
Interaction with generators and UPS on the same site
Peak shaving changes what the standby generator sees. If the battery normally carries the top 300 kW and the grid fails, the generator must carry the full 1200 kW unless the battery still has energy to help. Conversely, when the generator picks up a site after an outage, UPS units start recharging their own batteries and chillers restart, creating a generator demand peak that a BESS can also soften if it has been left with reserve. These interactions are why peak-shaving systems on generator-backed sites are designed as part of the whole integrated power system rather than bolted on at the meter.
Checking whether it pays
Take twelve months of interval data and the actual tariff schedule, including contract demand, billing demand rules, time-of-day rates and penalty structure. Model the battery or generator against every peak event, allowing for recharge time, efficiency, degradation over the project life and the reserve you hold back. Count the number of days per year on which the peak would still be exceeded and the penalty still paid. If the saving depends on a single annual peak, the system is probably oversized; if peaks are daily and short, the case is often strong. Tariffs change, so the model should survive a reasonable change in the demand charge.
Reading interval data
A fifteen-minute meter export for one afternoon, against a 900 kW target, shows what the battery must actually do:
| Interval | Demand | Above target | Energy above target |
|---|---|---|---|
| 14:00 to 14:15 | 1050 kW | 150 kW | 37.5 kWh |
| 14:15 to 14:30 | 1180 kW | 280 kW | 70 kWh |
| 14:30 to 14:45 | 1220 kW | 320 kW | 80 kWh |
| 14:45 to 15:00 | 1100 kW | 200 kW | 50 kWh |
| Hour total | Highest 320 kW | 237.5 kWh |
The highest interval sets the inverter rating; the sum sets the energy. Repeating this for every day of a month, not only the worst one, shows how often the battery is called on and whether the target is realistic.
Recharging between peaks
A battery that delivers 550 kWh in the afternoon must take it back before the next peak. With about 90% efficiency it needs about 611 kWh from the grid; at a 150 kW charging rate that is about four hours. If the recharge happens in an off-peak window, it costs little and adds nothing to the demand charge; if the only window is close to the next peak, the charging itself can set a new maximum demand. The controller is therefore given both the target and a charging limit, and the analysis checks that both can be met every day.
Using a diesel generator for peak shaving
A generator can supply the top slice too, running in parallel with the grid. That needs the DISCOM’s approval, synchronising and interface protection, and a set rated for the extra hours, because standby ratings assume limited annual running. Fuel, engine hours, servicing and emissions then become part of the cost of each kilowatt-hour shaved. Where peaks are frequent and long, a generator can make sense; where they are short and occasional, a battery or load control usually costs less to run.
Try load control first
- Staggering the start of large motors and chillers at shift change.
- Shifting batch processes, pumping to storage or ice making away from the peak hours.
- Temporarily raising comfort-cooling setpoints during the peak window.
Every kilowatt removed by changing when loads run is a kilowatt the battery or generator no longer has to supply, which is why the load study comes before the equipment quotation.
Checking the result after commissioning
A peak-shaving system is judged on the meter, not on the controller screen. For the first three billing cycles the interval data is downloaded and compared with the target: the highest recorded demand, the number of intervals where the battery reached its minimum state of charge, and the energy drawn for recharging during the off-peak hours.
- If demand still exceeds the target, the cause is usually a late discharge start, a slow ramp, or a peak longer than the battery energy covers.
- If the battery regularly reaches its minimum charge before the peak ends, either the target is too low or a load control step is missing.
- If recharging creates a new evening peak, the charging rate or window is changed.
The target is then adjusted from real data. Most sites settle on a target slightly higher than the first estimate and achieve it every month, which is worth more than a lower target missed once in a billing cycle.
When peak shaving does not pay
Where the tariff has no demand charge, where the peak lasts most of the working day, or where the plant already runs close to its contract demand all day, there is little peak to remove. The interval data shows this in the first hour of the study, before any equipment is discussed.
Common mistakes
- Sizing from the monthly maximum demand figure alone without interval data. The battery is either too small to reach the target or far larger than needed.
- Using the peak-shaving battery as the emergency backup without a reserve. The outage arrives with the battery discharged.
- Ignoring recharge time between consecutive peaks. The second peak of the day is not shaved and the penalty is paid anyway.
- Modelling day-one battery capacity for a ten-year business case. By year five the battery no longer reaches the target.
- Running a generator in parallel with the grid without DISCOM approval and proper protection. The connection is disconnected and penalties follow.
What to send us
Send twelve months of fifteen-minute or half-hourly interval data from the DISCOM meter or your energy management system, the tariff schedule and recent electricity bills showing contract and billing demand, and a list of large loads with any that can be deferred. Add the generator nameplate if a set exists and photographs of the metering panel and main switchboard. Through the application engineering enquiry we will return the kW and kWh needed to reach a chosen target and an estimate of the annual demand saving.
Questions engineers ask
How do I read meter interval data for peak shaving?
For each interval, subtract the target from the demand. The highest excess sets the inverter rating and the sum of excess multiplied by the interval length sets the energy. In the afternoon example on this page the highest excess is 320 kW and the hour needs 237.5 kWh.
How long does a peak-shaving battery take to recharge?
Divide the energy delivered by the charging efficiency and the charging rate. A battery that delivered 550 kWh needs about 611 kWh from the grid at 90% efficiency, which takes about four hours at 150 kW, ideally in an off-peak window so charging does not set a new demand.
How much battery do I need to shave 200 kW off my peak?
The PCS must be rated for at least 200 kW plus margin, and the energy depends on how long the peak lasts and how many occur between recharges. A one-hour peak needs roughly 250 to 300 kWh nameplate; a four-hour peak needs four times that.
Can I use my existing diesel generator for peak shaving?
Only in parallel with the grid, which requires synchronising switchgear, protection and the DISCOM’s approval, and only where regulations permit DG operation for that purpose. The fuel cost per kWh is usually above the tariff, so the saving must come from the demand charge alone.
Will peak shaving reduce my connected load or transformer size?
No. The equipment on site and the transformer still see the full load; only the import from the grid is reduced. Transformer loading can even rise when the battery recharges on top of normal demand, so check the thermal duty. Connected load and contract demand are separate figures, and only contract demand may be reviewed after a stable record of lower peaks.
Does the battery still provide backup during an outage?
Only to the extent that energy has been reserved for it. If the EMS holds a defined reserve the battery can bridge the outage or support the generator start; if it does not, the battery may be empty at exactly the wrong time. The reserve is set as a minimum state of charge that peak shaving never uses.
What data resolution do I need?
Fifteen-minute or half-hourly interval data for at least a full year, so that seasonal peaks and the duration of each event are visible. Monthly maximum demand figures alone cannot size the energy. The data is usually available from the DISCOM meter or a site energy meter, and a logger can fill gaps for a few weeks while the study starts.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 19 October 2026.