In short. Upstream oil and gas sites need generators selected for the hazardous area, the duty and the remoteness, in that order. A standard diesel set cannot stand inside a classified zone, and even outside it may need a spark arrestor, an air intake shut-off valve and certified electrical equipment under the project specification. Most wellsite, gathering station and drilling camp loads run prime or continuous, so rating, fuel logistics and redundancy matter as much as kVA.
What upstream power looks like
Upstream covers exploration drilling, well testing, production wellheads, gathering stations, gas compression, crude storage and the camps that support them. In India these sites are concentrated in Assam, Gujarat, Rajasthan, the Krishna-Godavari basin of Andhra Pradesh and offshore, and most onshore sites are far from a reliable DISCOM feed. The generator is therefore the primary source for pumps, motors, instrumentation, lighting and the camp, with a second set for standby.
The loads mix large induction motors for pumping units and injection pumps, smaller motors for utilities, and continuous electronic loads for control and telemetry that cannot tolerate interruption. A rig move or a change in production can change the whole load profile within a month. Downstream plants are covered separately on the refinery and process plant page.
Area classification comes before everything
Every upstream site has an area classification drawing dividing it into Zone 0, Zone 1, Zone 2 and unclassified areas under IS/IEC 60079-10. A diesel generator, with its hot exhaust, turbocharger, starter motor and alternator terminal box, is a collection of ignition sources, and an ordinary set must stand outside the classified zones at the distance the project specifies.
Where a generator must operate near a classified area, the project will call for a spark arrestor on the exhaust, an air intake shut-off valve that closes if the engine runs away on ingested gas, exhaust temperature shielding, a non-sparking fan and suitably rated electrical components. These follow the site rules, often based on OISD standards and the operator’s own practice, and the supplier must state exactly which features are fitted and to what standard.
| Site condition | Generator requirement | Who defines it |
|---|---|---|
| Unclassified area, well away from process | Standard set, normal installation | Project electrical engineer |
| Adjacent to Zone 2 | Spark arrestor, intake shut-off, possibly enclosure with gas detection | Area classification drawing and operator specification |
| Inside Zone 2 or Zone 1 | Purpose-built certified package or relocation outside the zone | Hazardous area specialist, statutory approval |
| Drilling rig power | Rig-specific skid sets with SCR or VFD drilling systems | Rig contractor and classification society |
The practical rule for most onshore production sites is to locate the generator in an unclassified area and bring power to the process by cable, which removes the hardest compliance problem. Reddy Generators does not certify equipment for classified areas; where a site requires it, the responsibility sits with project engineering and the certification route must be confirmed before any equipment is ordered.
Duty rating and continuous running
A wellsite generator typically runs 24 hours a day for months. That is continuous or prime duty under ISO 8528-1, and the set must be specified with the engine’s continuous rating, cooling sized for the site ambient, and service intervals planned in hours.
A sucker-rod pumping unit presents a cyclic load that swings every stroke, which is hard on a small generator’s governor and AVR; an electrical submersible pump on a variable-speed drive presents a steady but harmonic-rich load. Both are better served by a set with margin above the average demand, sized by the method in the generator sizing guide, and an alternator rated for the harmonic content. The continuous power page and the harmonics guide cover these two points.
Average load factor = Energy generated per day (kWh) ÷ (Rated kW × 24 h)
Load factor is the ratio of actual energy delivered to what the set could deliver at rating, and it shows whether the set is sized well for continuous duty. A 250 kVA set at 0.8 power factor delivering 2900 kWh a day is at a 60% load factor (illustrative), a comfortable continuous operating point; below about 30% the engine runs cold and should be replaced by a smaller set or paired with another in a load-dependent start arrangement.
Fuel choice at a gas-producing site
A site that produces gas has an obvious fuel on hand, and there are three ways to use it. A dedicated spark-ignition gas generator runs entirely on treated wellhead or associated gas, with lower fuel cost but slower transient response and a dependence on gas quality and pressure. A dual-fuel conversion of a diesel engine substitutes part of the diesel with gas during steady running while keeping diesel for ignition and transients, with the substitution rate varying with load and gas composition.
A conventional diesel set keeps full flexibility but needs diesel delivered to a remote location. The right answer depends on the gas composition, particularly its methane number and any hydrogen sulphide, the pressure available, and whether the engine manufacturer covers the application. Gas should never be chosen on price alone. The dual-fuel page and the natural gas generator page explain the trade-offs.
Redundancy, instrumentation and control power
The loads that must never drop at a production site are the instrumentation, emergency shutdown system, telemetry and gas detection. They are small in kW but their loss blinds the operator. The usual architecture is a UPS for control power with battery autonomy that covers a generator start or changeover, two generators with automatic transfer for the process loads, and defined load shedding so that a single remaining set carries the essential pumps and controls while deferring the rest. For a drilling camp the rig power is kept separate from camp power so that a problem on one does not affect the other. The load shedding guide describes how priorities are set.
Operating and maintaining far from support
A remote site needs a maintenance plan written around hours, spares for at least two service intervals, trained operators who perform the daily checks and read alarms, and a remote monitoring link so a service engineer can see the controller data before travelling. Coolant and oil analysis every 250 to 500 hours gives early warning of problems that would otherwise appear as a failure. Fuel storage must keep water out of the engine, meet the Petroleum Rules for the stored quantity, and at a hydrocarbon site sit within the overall fire and spacing plan.
Power at a wellsite (illustrative)
A gas wellsite with a small processing skid needs power for instruments, controls, pumps, lighting and accommodation. The generator plan starts from area classification, then the loads.
| Load | Demand | Note |
|---|---|---|
| Instrumentation, controls, SCADA and communications | 8 kW | On UPS, generator behind it |
| Chemical injection and transfer pumps | 15 kW | Started in sequence |
| Instrument air package | 11 kW | Keeps valves controllable |
| Lighting, including hazardous-area fittings | 6 kW | Night operations |
| Accommodation and workshop | 20 kW | Shed first if capacity is short |
| Total | 60 kW | About 75 kVA at 0.8 power factor |
Two 100 kVA sets, one running and one standby, placed outside the classified zone, give continuous duty with cover for service. The running set carries about 75% of its rating.
Continuous duty far from support
A wellsite generator runs around the clock, so it is selected on its continuous or prime rating and serviced on the hour meter. On our standard, oil and filters are changed every 250 to 500 running hours or six months, whichever comes first, and coolant is replaced every year. At twenty-four hours a day a set reaches 250 hours in about ten days, so duty and standby sets are swapped on a schedule that lets each be serviced without losing supply.
Using produced gas as fuel
Gas-producing sites can sometimes run gas engines on their own gas, which removes diesel deliveries. The gas must be treated to the engine maker’s quality limits, its composition checked, and the engine selected for that gas. Diesel sets usually remain as standby, because they start quickly and do not depend on the process running.
Safety equipment for sets near hydrocarbons
- Placement outside the classified zone wherever possible.
- Spark-arresting exhaust where the site requires it.
- Air intake shut-off valves to stop an engine drawing in flammable gas.
- Gas detection near the set with automatic shutdown where specified.
- Fuel storage bunded and separated from process equipment.
Remote monitoring and fuel logistics
Wellsites are often hours from the nearest town. Generator controllers report running hours, fuel level, alarms and load to the operations centre, so services and fuel deliveries are planned from real data. Fuel for two weeks of running at the site load is a common minimum where road access is unreliable during the monsoon.
Common mistakes
- Placing a standard generator too close to a classified area because the cable run is shortest. The installation fails the safety audit and must be moved after commissioning.
- Specifying standby-rated sets for a wellsite that runs 24 hours a day. The engines reach overhaul hours in two years and the warranty is void.
- Choosing gas fuel on price without a gas analysis. Hydrogen sulphide or heavy hydrocarbons cause knock, corrosion and early engine failure.
- Leaving instrument and shutdown systems on the same breaker as process motors. A motor fault trips the controls and the site goes blind during the event that most needs monitoring.
What to send us
Send the area classification drawing or a statement of where the generator will stand relative to classified zones, the project’s electrical specification for generator sets, and the load list with motor sizes, drives and starting methods. Include daily operating hours, site location and access, the fuel options with any gas analysis, and the required autonomy for control power. Send your upstream power requirement.
Questions engineers ask
How is a wellsite generator arrangement chosen?
Area classification comes first, then the loads: instruments and SCADA on UPS, chemical injection pumps, the instrument air package, lighting and accommodation. In the example on this page that is about 60 kW, about 75 kVA, so two 100 kVA sets outside the classified zone, one running and one standby, give continuous duty with cover for service.
Can a wellsite generator run on produced gas?
Sometimes, if the gas is treated to the quality limits of the engine maker, its composition is checked and the engine is selected for that gas. That removes diesel deliveries. Diesel sets usually remain as standby, because they start quickly and do not depend on the process running.
Can a standard diesel generator be used in a Zone 2 area?
Normally it should be placed outside the classified zone. If a set must be inside one, it needs specialist equipment and protection, such as spark-arresting exhaust, an air intake shut-off valve, surface temperature control and suitable electrical equipment, assessed against the applicable standards. Moving the set is usually simpler and safer.
What is a spark arrestor and when is it required?
A spark arrestor is an exhaust device that traps hot carbon particles before they leave the tailpipe. It is specified where exhaust sparks could ignite flammable vapour or dry vegetation, which is common at hydrocarbon sites, and the requirement comes from the site rules rather than a universal standard.
Why does a generator near gas need an air intake shut-off valve?
Because a diesel engine can draw flammable gas in through its air intake and run on it, overspeeding beyond control even after the fuel is cut. An intake shut-off valve closes the air supply and stops the engine. It is tested regularly as part of the site safety checks.
How much fuel autonomy should a remote wellsite hold?
Enough to cover the delivery interval plus a margin for weather and road access, which commonly means 7 to 15 days at continuous duty. Storage above the Petroleum Rules exemption quantity requires a PESO licence and the tank layout must respect the site’s hazardous area spacing.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 19 October 2026.