In short. A 250 kVA diesel generator delivers 200 kW at 0.8 power factor — about 348 A per phase at 415 V — and is the workhorse rating for mid-size factories, commercial buildings, hospitals’ non-critical blocks, cold storages and construction sites. Used and refurbished 250s are always moving through our Pedda Amberpet workshop; every set is run on the load bank before it is offered, and you get the test record with the machine. For the 250s in stock this week, message WhatsApp 98852 01608.
Who buys a 250, and for what
This is the first rating where serious industry begins: machine shops with several motors, plastic and packaging units, mid-rise commercial buildings, hotels, and process plants that need real starting capability. A 250 kVA set with 0.22 p.u. transient reactance can accept roughly a 200 kVA load step within a 15% voltage dip — in motor terms, about a 25 kW motor started direct-on-line by the conservative screening our calculator uses, or motors of 60 kW and above through a star-delta or soft starter. If your load is motor-heavy, size it properly with the motor-starting calculator rather than by habit.
What to know about the used 250 market
Supply is good — every major maker builds the frame, and sets come off completed projects, upgraded buildings and bank/NBFC refurbishments. Quality is more varied than in smaller frames, because some 250s have lived hard prime-duty lives on construction power. The hour meter alone will not tell you which life a set has led; the load test will. That is why we test before we offer, and why a set that fails our inspection is either rebuilt into refurbished stock or rejected — it is not quietly sold as-is.
As-is or refurbished at this size
At 250 kVA the refurbishment question has real money on both sides. Our rule of thumb from the service floor: for emergency standby behind a reliable grid, a tested as-is set with its inspection report serves well; for daily load-shedding duty or prime power, take the refurbished machine — the rebuild plus the six-month warranty (exclusions: rubber and plastic parts, consumables, fuel-quality damage, overloading) costs less than one unplanned crankshaft event. Definitions and process are on the used and refurbished generators page; valuation logic is on used generator prices.
The installation scope matters at this size
A 250 is past the plug-and-play stage: it wants a proper foundation, an exhaust run with the CPCB stack height, sized cables (around 350–400 A ampacity after derating — check the cable calculator), earthing, and an AMF panel with a changeover that matches your incomer. We quote the set and the complete installation together, and our engineers service what we install — the same model that has kept nearly 50 TS TRANSCO substations running since 2018.
Running cost in litres, not guesses
| Load on a 250 kVA set | Electrical output | Fuel, about | Eight hours a day, 26 days |
|---|---|---|---|
| 50% | About 100 kW | 30 litres an hour | About 6240 litres |
| 75% | About 150 kW | 42 to 46 litres an hour | About 8736 to 9568 litres |
| 100% | About 200 kW | 54 to 57 litres an hour | About 11,232 to 11,856 litres |
At this size fuel decides whether a set suits prime duty at all. A factory running a 250 on daily power cuts uses thousands of litres a month, so a few percent of extra consumption from worn injectors or a restricted air system is a real cost. The load test measures how the set behaves at load; a set that smokes or labours there will also burn more. See DG fuel consumption chart.
Signs of a hard working life
| Sign | What it often means |
|---|---|
| Heavy crankcase blow-by on load | Worn rings and liners from long prime running or dust |
| Oil in the intake or around the turbo | Turbo seals worn; check the air filtration history |
| Radiator fins packed or repaired | Dusty site use, often construction |
| Fresh paint over corrosion on the base frame | Outdoor life without cover; check fixings and fuel tank |
| Many alarms in the controller history | Overloads, shutdowns or neglected faults |
| Mismatched hoses, wiring and fittings | Repeated field repairs without a proper rebuild |
None of these alone rules a set out; together they explain why a set is offered as refurbished rather than as is, or why it is rejected. That judgement is made on the workshop floor, with the engine running, before a set reaches our stock list.
Size, weight and the installation
A canopied 250 kVA set is typically about 3.3 to 3.8 m long, 1.1 to 1.2 m wide and 1.8 to 1.9 m high, weighing about 2.4 to 3.0 tonnes, so delivery needs a crane or a heavy forklift and a hard standing. The foundation is a level reinforced plinth sized for the set’s weight and anti-vibration mounts. The output cable must carry about 348 A after derating, which often means parallel runs or a large single cable depending on length and route, and the changeover or AMF panel must match the incomer rating. See cable sizing calculator.
Motor loads at this size
A 250 is often bought for a works with several motors, and the starting method of the largest motor decides how comfortably it copes. A motor of about 25 kW started direct on line sits near the comfortable limit for a 15% dip, while a 60 kW motor on a star-delta or soft starter, started first while the set is lightly loaded, is well within reach. Starting motors one at a time after a transfer, rather than all together, is the cheapest improvement a site can make. See three-phase generators.
Documents you should expect
- Inspection report and load-bank test record for the exact set, identified by engine and alternator serial numbers.
- For refurbished sets, the work list, parts replaced and the six-month warranty terms.
- Emission stage and nameplate details, so the set can be registered where it will run.
- A commissioning record once installed, showing the transfer and load test on site.
Replacing an older set
Many 250 buyers are replacing a tired set of the same size. Reddy Generators also buys used generators and takes sets in part exchange, so the old set can be assessed during the same visit and removed when the replacement is commissioned.
Questions worth asking about any used 250
- May I witness a sustained load-bank run on this set, not just a start and idle?
- What was its previous duty: standby behind the grid, daily power cuts or prime construction power?
- Which major work has been done, and when: injectors, turbo, radiator, alternator?
- Do the engine and alternator serial numbers match the documents?
- Which emission stage is it, and has registration at the new site been checked?
- Who handles installation, the AMF panel and the after-sales service?
Our answers come in writing, with the inspection report and the test record for the exact set offered.
Worked example: a small engineering works (illustrative)
| Load | kW | Power factor |
|---|---|---|
| Machine tools, running together | 75 | 0.80 |
| Lighting | 15 | 0.95 |
| Two 22 kW motors on star-delta starters | 47.4 | 0.85 |
| Office air conditioning | 25 | 0.90 |
| Total | 162.4 kW, 102.7 kVAr | About 192 kVA |
About 192 kVA is 77% of a 250 kVA set. The engine carries 162 kW of its 200 kW, and the two 22 kW motors start comfortably on star-delta if they are started one after the other once the machine tools are running. A 200 kVA set would carry the running load at 96% with no room for the starts or for growth, which is why the 250 is the right size here.
What daily running means for a 250
| Duty | Running hours a year, roughly | Service rhythm | Condition to buy |
|---|---|---|---|
| Standby behind a reliable grid | 50 to 200 | Annual service and monthly load runs | A tested as-is set with a clean record |
| Daily power cuts, eight hours | About 2500 | Oil and filters every couple of months by hours | Refurbished, with the six-month warranty |
| Prime or construction power | 5000 or more | Frequent service and planned overhauls | Refurbished, with the overhaul history known |
Oil-change intervals of around 500 running hours are common on current engines in this class, so a 250 on daily duty passes a service point every couple of months. Budget the service plan with the purchase, not after the first warning light.
Mistakes that turn a good 250 into a bad buy
- Choosing a set from a construction yard on price, without a sustained load test.
- Letting every motor restart at once after a power cut, so the set trips on the step.
- Running parallel output cables of different lengths, which share current unevenly and overheat.
- Leaving the AMF panel or changeover rating below the incomer, so the panel becomes the weak point.
- Skipping the commissioning transfer test because the set ran well in the yard.
Placing a 250 on site
A canopied 250 normally sits outdoors on a raised plinth, close to the main panel to keep the cable short and the voltage drop low. Keep the radiator discharge pointing away from walls and windows, and leave the intake side clear so the set breathes cool air; a set boxed into a corner recirculates its own hot air and derates in summer. Keep the exhaust outlet away from air conditioning intakes and neighbouring buildings, and provide a hard path for the fuel delivery vehicle. See outdoor installation.
Ask for this week’s 250 kVA stock
WhatsApp 98852 01608 or the enquiry form — say standby or prime, largest motor, and your district. Workshop viewing by appointment; witness your set on the load bank before you decide. We also buy 250s and take them in part exchange.
Questions buyers ask about used 250 kVA sets
How much fuel does a 250 kVA generator use per hour?
About 30 litres an hour at half load, 42 to 46 at three quarters and 54 to 57 at full load for a modern engine in good condition, depending on the make. Eight hours a day for 26 days at 75% load is about 8736 to 9568 litres, so a few percent of extra consumption from a worn engine is a real running cost.
How do I tell if a used 250 kVA set had a hard working life?
Look for heavy crankcase blow-by on load, oil around the turbo, packed or repaired radiator fins, fresh paint over base frame corrosion, a long alarm history in the controller and mismatched field repairs. Together these show a set that needs a rebuild before it can be trusted for daily duty.
What does a used 250 kVA generator cost?
The figure is set by the make, the hours, the emission stage and the condition shown on the load test, and by whether the set is as is or refurbished with a warranty. A WhatsApp message to 98852 01608 brings the current 250 kVA stock with the test record for each set.
How many amps and kW is 250 kVA?
About 200 kW at a power factor of 0.8 and about 348 A per phase at 415 V. That current sets the cable, breaker and changeover ratings after derating, and often means parallel cable runs on longer routes. The full table for every rating is on the full load current chart.
What size motor can a 250 kVA set start?
About 25 kW direct on line within a 15% voltage dip by conservative screening, and 60 kW or more with a star delta starter or soft starter, started first while the set is lightly loaded. The motor starting calculator checks the exact case with the other loads running.
How do I avoid buying an ex-construction set with a hard life?
Insist on a sustained load test and a written inspection report, and judge the set by smoke, oil pressure, blow by, temperatures and stability on load rather than paint and hours. Every set we offer carries both documents, and sets that fail are rebuilt or rejected.
Do you install and service the set after sale?
Yes. We supply and install the AMF panel or changeover, cabling, earthing and exhaust, commission the set on site, and service it afterwards with our own engineers across Telangana, Andhra Pradesh and the districts around Hyderabad, with project based service further afield, so one team remains accountable for the set.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 1 November 2026.