In short. A useful generator technical article defines one engineering problem, explains the principle that governs it, lists the inputs needed, shows the method with a labelled illustrative example and says how to verify the result on site. It ends with a practical next decision and states what remains uncertain. Articles here follow that structure and are written for Indian conditions: 415 V, 50 Hz, CPCB IV+ sets and high ambient temperatures.
What a technical article must do
An article is not a brochure and not a site design. Its job is to teach a method well enough that an engineer can apply it to a different plant and know where the method stops working. That requires five parts, in order: the governing principle, the required inputs, the method, the assumptions, and the verification. Equations carry defined variables and units. Examples state their operating conditions. Results lead to a decision, such as whether a load study is needed or whether a soft starter would let a smaller set work, and the article says plainly what it cannot settle without equipment data.
| Part of the article | What it contains | Question it answers for the reader |
|---|---|---|
| Problem | The symptom or decision, stated precisely | Is this my problem? |
| Principle | The physics or rule that governs it | Why does it happen? |
| Inputs | Data needed, with units and source | What do I need to collect? |
| Method | Steps and formula with a worked example | How do I calculate it? |
| Verification | Test or measurement that proves the result | How do I know it is right on my site? |
| Limits | Where the method fails or needs a study | When do I need more than this? |
Start with the problem, not the product
A sizing question rarely concerns steady load alone. It may involve motor starting, non-linear loads such as UPS and VFDs, step loading after a transfer, and future expansion. A continuity question may involve UPS behaviour, generator start time, ATS logic and the distribution system downstream. An article that jumps to a kVA rating without walking through these has skipped the engineering. The Power Engineering Centre groups the calculations by problem so that the inputs are identified before any equipment is selected.
An example of the method in practice
Consider the most common article topic: converting a real-power demand into a generator rating. The principle is that the generator must supply apparent power, and its rating is stated in kVA at 0.8 power factor.
kVA = kW / PF
Here kW is the real power drawn by the load, PF is the load power factor, and kVA is the apparent power the alternator must supply. Worked example (illustrative): a workshop draws 160 kW at a power factor of 0.85. The apparent power is 160 / 0.85, about 188 kVA. Allowing a margin of around 20 to 25% for load growth and to keep the set off its limit gives roughly 225 to 235 kVA, so a 250 kVA set is the first candidate.
That is not the end of the article. The next section must ask whether the largest motor starts on this set within an acceptable voltage dip, and whether the site ambient requires derating. Only then is the recommendation defensible. The relationship is explored further in generator sizing.
Topics engineers ask for most
- Motor starting on a diesel generator: DOL, star-delta, soft starter and VFD, and the starting kVA each demands.
- Voltage and frequency dip on load steps, and how the governor and AVR recover.
- UPS and VFD loads on generators: harmonics, alternator heating and controller interaction.
- Derating for ambient temperature and altitude, including summer conditions in Telangana and Andhra Pradesh.
- AMF and ATS sequencing, transfer times and what the UPS must bridge.
- Fuel consumption, runtime and tank sizing from measured load.
- CPCB IV+ sets: what changed in the engine and what it means for service and fuel quality.
- Earthing and neutral arrangements when a generator replaces the DISCOM transformer as the source.
Each topic links to the relevant calculator so the reader can repeat the method with site figures.
Sources, editions and examples
For a specific product, the controlling document is the manufacturer’s current data sheet and its revision. For regulation, it is the notification for the jurisdiction, read with its commencement date. General engineering material explains the subject but does not replace those records. Articles therefore name the type of source they rely on, such as an ISO 8528 performance class definition or an IS standard for earthing, and point to the Technical Library for the reference itself. A worked example distinguishes illustration from recommendation; a figure such as a typical transient reactance or a typical specific fuel consumption is given as a range and flagged for confirmation against the actual machine.
How articles are reviewed
Each article is checked by an engineer with field experience before release. The review asks whether every equation has defined units, whether the example’s conditions are stated, whether any number could be read as a promise, and whether the conclusion still holds for the common variations an Indian site will throw at it, such as a weak DISCOM supply, a monsoon-damp generator room or a set running at 30% load for months. Articles are revised when a standard, an emission stage or field experience changes the recommendation, and the revision is recorded. No article title, author or date is listed until that review is complete.
The calculation method behind every article
Each article follows the same order, so a reader can check the reasoning and repeat it with their own figures. It starts by stating the question in engineering terms, then lists the inputs with their units and where each comes from, then shows the formula, a worked example with every step, and finally the checks that confirm the answer is reasonable. Assumptions are named, and any value that must come from a maker data sheet is marked as such.
Worked example: sizing from a load list (illustrative)
A small office has these loads: lighting 8 kW, computers and servers 12 kW through a UPS, air conditioning 30 kW from ten split units, a 7.5 kW water pump and a lift of 11 kW. Adding nameplates gives about 69 kW. Applying realistic diversity, with not every air conditioner and the lift running at full load together, gives a running load nearer 50 kW. At 0.8 power factor that is about 63 kVA.
The next check is the largest step. If the lift motor starts while everything else is running, it may draw several times its running current for a few seconds. The article shows how to estimate that kVA step and compare it with the set data, which may lead to an 82.5 kVA set rather than 62.5 kVA, or to staggered restarts of the air conditioners after a transfer. The answer depends on the motor starter and the alternator data, which is why the article ends with the questions to ask the maker.
Sense checks used throughout
| Check | Why it matters |
|---|---|
| Units carried through every step | Mixing kW and kVA, or volts and kilovolts, is the most common error |
| Result compared with a rule of thumb | A large difference points to a wrong input or formula |
| Site conditions applied | Ambient temperature and altitude reduce available output |
| Worst credible case tested | The set must cope with the hardest realistic event, not the average day |
| Maker data confirmed | Final figures always come from the actual equipment data sheet |
How to use the articles on your own project
- Find the article that matches your question, such as sizing, cable, fuel or ventilation.
- Gather your own inputs: load list, distances, site temperature and equipment data.
- Repeat the worked example with your figures, keeping the same order of steps.
- Apply the sense checks in the table above.
- Send your working with the load list for a review before ordering equipment.
What articles cannot replace
Articles explain methods and typical values. They cannot see the actual site, the condition of existing equipment or the details of a specific maker design. A protection study, a site survey or a load measurement is still needed where the risk or the cost of a mistake is high, and the articles say so where it applies.
Keeping articles current
Standards, emission norms and equipment change over time. Each article carries the date it was last reviewed, and it is checked again whenever a referenced standard or rule is revised. Where a worked example depends on a value that may change, such as a fuel consumption figure or a regulation threshold, the article says so, so readers know which inputs to confirm before relying on the answer.
Common mistakes
- Applying a kVA conversion without checking motor starting; the set is adequate on paper and stalls the first time the largest motor starts.
- Using an example’s derating factor at a different site; a set that was fine at 30 °C overheats at 45 °C in an enclosed room.
- Reading a typical figure as guaranteed; the actual alternator reactance or fuel curve differs and the result shifts.
- Quoting an article in a tender specification without checking its edition; the referenced standard or emission norm has since been revised.
What to send us
If you want an article on a specific problem, or need a method applied to your plant, send a short description of the equipment and the unresolved question, plus any data you already hold: the load list, nameplate photographs, single-line diagram, or measured readings from a power analyser. Tell us which figures are measured and which are estimated. Send your application engineering enquiry and we will say what can be answered from the data you have.
Questions engineers ask
How should a generator be sized from a load list?
Add the nameplate loads, apply realistic diversity to find the running load, convert to kVA at the power factor, then check the largest motor start against the set data. In the illustrative office, 69 kW of nameplates becomes about 50 kW running, roughly 63 kVA, before the lift start check.
Why is the largest motor start checked separately?
A motor can draw several times its running current while starting, causing a voltage and frequency dip that may trip sensitive loads or stall the motor. That step, not the average load, often decides whether a set must be one size larger or whether restarts must be staggered.
What sense checks catch errors in generator calculations?
Carry units through every step, compare the result with a rule of thumb, apply site ambient temperature and altitude, test the worst credible case rather than the average day, and confirm final figures against the actual maker data sheet before any equipment is ordered or installed.
Can the technical articles replace a site survey or study?
No. Articles explain methods and typical values, but they cannot see the site, the condition of existing equipment or details of a particular maker design. Where risk or cost of error is high, a site survey, load measurement or protection study is still needed, and the articles say so where it applies.
Why do generator ratings use kVA instead of kW?
The alternator’s heating depends on current, which follows apparent power, while the engine’s limit follows real power. Rating in kVA at 0.8 power factor covers both for typical loads. A load with a power factor below 0.8 can overload the alternator before the engine is fully loaded.
Can I size a generator from the connected load?
Connected load overstates running demand on most sites, sometimes by half. Size from the expected simultaneous running load, then check motor starting and step loads. A maximum-demand reading from the DISCOM meter is a useful starting point for an existing building. A week of logging confirms the real peak.
Are the worked examples safe to use directly?
No. They are labelled illustrative and exist to show the method. Repeat the calculation with your own measured inputs and confirm equipment-specific values against manufacturer data. Where a result decides a purchase, send the inputs for a checked calculation, so the figures are confirmed against the actual equipment and site conditions before anything is ordered.
Do the articles cover 60 Hz equipment?
They assume 50 Hz Indian supply. Where an export or special-equipment case needs 60 Hz, the relevant article notes the difference in engine speed and alternator output and links to the 60 Hz guidance. A 60 Hz set runs a four-pole alternator at 1800 rpm instead of 1500 rpm, so engine output and ratings differ from the 50 Hz figures and must be taken from the maker data.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 19 October 2026.