Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Used 500 kVA Generators

In short. At 500 kVA — 400 kW at 0.8 power factor, about 696 A per phase at 415 V — a generator stops being a purchase and becomes a small power project. Used and refurbished 500s pass through our workshop steadily, mostly from completed infrastructure jobs and building upgrades, and the saving over new is at its largest in this class. So is the risk of buying blind: at this size a hidden fault costs serious money. Every 500 we offer is load-bank tested first, and you can witness the test at Pedda Amberpet before paying. This week’s stock: WhatsApp 98852 01608.

Where 500 kVA sets earn their keep

Factories with multiple large motors, commercial towers, hospitals, data rooms, cold chains, hotels and mid-size process plants — and construction sites that need one strong set instead of a farm of small ones. Many buyers at this size are also choosing between one 500 and two 250s in parallel; the N+1 capacity calculator puts numbers on that trade-off, and our engineers will give you the arguments both ways — a single 500 is cheaper per kVA, two 250s give redundancy.

What buying used means at this size

The engine is now an industrial machine whose overhaul is a significant event, so provenance and test evidence dominate the decision. Three rules we apply to our own stock, and recommend if you buy anywhere: first, no purchase without a sustained load-bank run — idling proves nothing at 500 kVA; second, alternator insulation and AVR behaviour get tested, not assumed, because rewinding at this frame is a real cost; third, the emission stage is checked against the site before quoting, since a large set that cannot be registered where you operate is worth scrap plus freight. Our inspection covers all three, and the record travels with the set.

As-is against refurbished at 500 kVA

The arithmetic sharpens as the frame grows. A tested as-is 500 with a clean record suits standby duty behind a stable grid. For prime or long-hours duty, the refurbished route — rebuild to the inspection’s findings, then the six-month warranty (rubber and plastic parts, consumables, fuel-quality damage and overloading excluded) — is usually the sound money, because a single major failure on a cheap set can exceed the whole saving. The definitions are on the used and refurbished page; the valuation logic on used generator prices.

The project around the machine

A 500 arrives with real engineering: foundation and vibration isolation, exhaust with CPCB stack height, around 700 A of switchgear and cabling (parallel runs — size them in the cable calculator), AMF panel, changeover or ATS, earthing, and commissioning against the building’s protection. We quote and deliver the whole scope, and have run exactly this class in the field — including a BHEL thermal-project hire and TSGENCO panel work at Nizamsagar.

Fuel at 500 kVA is a logistics question

Load on a 500 kVA setElectrical outputFuel, aboutHours from a 990-litre tank, illustrative
50%About 200 kW57 litres an hourAbout 17 hours
75%About 300 kW77 to 83 litres an hourAbout 12 to 13 hours
100%About 400 kW100 to 110 litres an hourAbout 9 to 10 hours

A 500 on prime duty can need a delivery every day or two, so bulk storage, transfer pumps, filtration and the approvals that go with stored diesel become part of the project. The ranges span the published data of different makers for modern engines in this class; the load test shows whether the actual set behaves like one. See generator fuel systems.

The deeper checks a large frame needs

AreaCheckWhy it matters at 500 kVA
Turbochargers and charge air coolerShaft play, oil leaks, boost on load, cooler cleanlinessLoss of boost shows up as smoke, low power and high exhaust temperature
Cooling systemRadiator condition, coolant quality, temperature on a long runLarge engines overheat quickly if the radiator is part blocked
AlternatorInsulation test, regulator response, bearing noiseRewinding a frame this size is a major cost
Engine wearBlow-by, oil analysis, oil pressure hotDistinguishes a sound engine from one near overhaul
Controls and protectionShutdown functions proven, sensors calibratedA set that does not protect itself can destroy itself
Base frame, mounts and enclosureCorrosion, cracked mounts, door sealsVibration and noise problems on site

Size, weight and access

A canopied 500 kVA set is typically about 4.3 to 4.5 m long, 1.45 to 1.6 m wide and 2.2 to 2.3 m high, and weighs about 4.3 to 4.8 tonnes. Delivery needs a crane, a clear lifting zone and a route that can take the vehicle. Allow space around the set for maintenance and for a large radiator’s discharge air, and keep the exhaust well clear of windows and intakes. Output cabling for about 696 A is normally several parallel runs, with matching lengths and terminations, into switchgear rated for the generator and its fault level.

One set or two at this size

ChoiceStrengthWeakness
One 500 kVA setLower cost per kVA, one engine to maintain, simpler controlsAny failure or service stops all generator supply
Two 250 kVA sets in parallelHalf the capacity survives a failure; one can be serviced while the other runsParalleling panel, more space and two engines to service

Where the critical load fits on one 250, two sets give redundancy that a single 500 cannot. Where it does not, the single set is usually the better buy. See 250 to 500 kVA generators.

Commissioning a large used set

Commissioning on site repeats the essential parts of the workshop test with the real installation: a run on load or on a load bank, a transfer test through the actual changeover, checks of protection settings against the site fault level, phase rotation, earthing and the exhaust back pressure of the installed run. The record joins the inspection report and load-test record, so the set’s history is complete from the day it starts work.

Trading in the old set

Reddy Generators also buys used generators and takes sets in part exchange, which helps where a 500 replaces an older large set whose removal would otherwise be a project of its own.

Before committing to any used 500

At this size the documents are worth as much as the machine. Every 500 we offer carries its inspection report and load-test record, and refurbished sets the work list and six-month warranty terms.

Worked example: a commercial building (illustrative)

LoadkWPower factor
Lifts, allowing for diversity450.85
Air conditioning plant, essential part1500.88
Water and fire service pumps300.85
Lighting and common services600.95
IT and security through UPS500.99
Total335 kW, 154.3 kVArAbout 369 kVA

About 369 kVA is 74% of a 500 kVA set, leaving room for the air conditioning plant to restart in stages after transfer and for the UPS to recharge its batteries. The restart order matters as much as the size: UPS and lighting first, then pumps and lifts, then the air conditioning in steps, each after the voltage and frequency have recovered.

Hours, service and overhaul at 500 kVA

DutyRunning hours a year, roughlyService rhythmPlanning point
Standby for a building or plant50 to 300Annual service, monthly runs on loadBatteries, fuel quality and cooling system condition
Daily load-shedding duty2000 to 3000Oil and filters every few months by hoursFuel logistics and a spares stock on site
Prime power on a project5000 or moreFrequent service, scheduled top-end and major overhaulsA second set or rental cover during overhaul

On prime duty a 500 kVA engine reaches its overhaul interval within a few years, so the purchase decision includes how the site will keep power during that work: a second set, a rental set brought in for the overhaul, or a planned shutdown.

Mistakes that are expensive at this size

Indoor rooms for a 500

A 500 kVA set inside a building needs a room planned around air. The radiator must draw cool air across the engine and push hot air straight out through a duct to outside, without the hot air finding its way back to the intake. Combustion air, radiator air and the heat the engine and alternator radiate into the room must all be handled, or the set derates on a hot afternoon exactly when the grid is weakest.

The room also needs fire separation, a fuel day tank with containment, an exhaust run with low back pressure and good support, access doors large enough to bring the set in and out, and acoustic treatment where neighbours are close. Most of these decisions are fixed when the building is designed, so they are settled with the architect before the set is chosen. See indoor installation.

An outdoor canopied set avoids most of this, at the cost of space in the yard and attention to noise at the boundary. On many sites in Telangana and Andhra Pradesh the outdoor canopy on a raised plinth, with a short cable route to the main panel, is the simpler and more reliable arrangement.

Talk to us about a 500

WhatsApp 98852 01608 or the enquiry form with your load, largest motors, duty and district. We will tell you honestly whether a used 500, a refurbished one, two paralleled sets or a new machine is the right project — and we buy and part-exchange 500s too.

Questions buyers ask about used 500 kVA sets

How long does a fuel tank last on a 500 kVA generator?

It depends on load. At about 57 litres an hour at half load, 77 to 83 at three quarters and 100 to 110 at full load, an illustrative 990 litre tank lasts roughly 17, 12 to 13 and 9 to 10 hours. Prime duty at this size usually needs bulk storage and regular deliveries planned into the project.

Is one 500 kVA generator better than two 250 kVA sets?

One 500 costs less per kVA and is simpler to maintain. Two 250s in parallel keep half the capacity through any single failure or service, which matters when the critical load fits on one 250. Where it does not fit, the single 500 is usually the better choice.

What is the price of a used 500 kVA generator?

It is set by the make, hours, emission stage and the condition proven on the load test, and the spread at this size is wide, which is why the test records matter. A WhatsApp message to 98852 01608 brings the current stock with documents for each set.

How many amps does a 500 kVA generator supply?

About 696 A per phase at 415 V, and 400 kW at a power factor of 0.8. Output cabling is normally several parallel runs of matching length into switchgear rated for the set and its fault level. The full load current chart lists every rating, and the cable calculator checks the runs for your route.

One 500 kVA or two 250s in parallel?

One 500 costs less per kVA and is simpler. Two 250s in parallel keep half the capacity through any single failure or service, which is valuable when the critical load fits on one set. Weigh the cost of an outage against the extra paralleling panel, space and second engine.

Can I witness the load test?

Yes, and at this size you should. Workshop appointments at Pedda Amberpet include a load bank run of the actual set you are buying, with temperatures, oil pressure, voltage and frequency recorded, so you see its behaviour at load before any commitment and keep the record with the set.

Do you handle the full installation?

Yes: foundation guidance, lifting, exhaust and stack, cabling, AMF panel, changeover or ATS, earthing and commissioning on site, with one supplier accountable for the running system and our engineers servicing it afterwards across Telangana, Andhra Pradesh and the districts around Hyderabad, with the inspection and test records kept together.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 1 November 2026.

Generators by rating