Generator Size Chart: What Each kVA Rating Runs

In short. A generator’s kVA rating times 0.8 gives the real power it can carry in kW, but the right size depends on two things: the running load it must carry, and the largest motor it must start. As rough guides, a 15 kVA set runs a large home with three ACs and a borewell pump, a 62.5 kVA set a branch office or small workshop, a 125 kVA set the common services of a mid-size apartment complex, and a 500 kVA set a hospital, mall section or medium factory. The chart below shows what each common rating from 7.5 to 3000 kVA typically runs, and the largest motor it can usually start.

Who this page is for: For homeowners, building managers and buyers who want a first idea of the generator size they need before a proper load calculation.

Key facts

  • Real power available = kVA × 0.8. A 125 kVA set carries 100 kW.
  • Size so that the normal running load is about 70 to 80% of the set’s kW.
  • The largest motor started direct-on-line is often what decides the size.
  • As a rough guide, a set can start a direct-on-line motor rated at about 10% of its kVA (in kW), and a star-delta motor of about 30%.
  • UPS, VFDs and other electronic loads may need a larger alternator.
  • Use this chart for a first idea; confirm with a load list or the size calculator.

Quick answers: what each size typically runs

  • 15 kVA: a large home or villa with three ACs and a borewell pump
  • 25 kVA: a large villa, a small commercial floor or a bank branch
  • 30 kVA: a bank branch or office with several ACs and an ATM
  • 62.5 kVA: a branch office, small nursing home or small workshop
  • 125 kVA: an apartment complex’s common services, or a medium workshop
  • 250 kVA: a gated community’s common services or a mid-size hospital
  • 500 kVA: a hospital, mall section, IT floor plate or medium factory
  • 1000 kVA: a large factory, tower or campus, often as two sets

Typical cases only. The right size comes from your own loads and largest motor.

Generator size chart, 7.5 to 3000 kVA

What each common rating typically runs, and the largest induction motor it can usually start with the set lightly loaded. Click a rating to link straight to its row.

Rating (kVA)kW at 0.8 PFTypically runsLargest DOL motor (kW, approx.)Largest star-delta motor (kW, approx.)
7.56A small home or shop: lights, fans, fridge, computers and one 1.5-ton AC or a 1 HP pump0.75–
108A home with two ACs, or a small office or clinic0.75–
1512A larger home or villa with three ACs and a borewell pump; a small shop or office floor1.53.7
2016A villa with four ACs; a small restaurant or office1.55.5
2520A large villa or small commercial floor; a bank or insurance branch2.27.5
3024A bank branch or office with several ACs, computers and an ATM2.27.5
4032A small hotel floor, school block or small workshop3.711
5040A showroom or small hospital floor without imaging3.715
62.550A branch office, small nursing home, supermarket or small workshop5.518.5
82.566A mid-size office, nursing home or small factory line7.522
10080An apartment block’s common services; a small factory7.530
125100Common services and limited flat backup for a mid-size apartment complex; a small hospital; a medium workshop1137
160128A larger apartment complex’s common load; a hotel; a cold store1545
200160A mid-size factory, mall section or hospital with lifts and pumps18.555
250200A gated community’s common services, a mid-size hospital or a factory with several motors2275
320256A large apartment complex, a commercial building, or an industrial unit3090
380304A large commercial building or process plant section37110
500400A hospital, mall section, IT floor plate or medium factory45132
625500A large hospital or commercial tower; a process plant55160
750600A large factory, data room or commercial campus75200
1000800Large factories, towers and campuses; often two smaller sets instead90250
12501000Large plants and campuses; usually paralleled with other sets110355
15001200Multi-building campuses, large hospitals, data facilities132450
20001600Industrial plants and data centres, usually as part of a multi-set plant200560
25002000Large industrial and data-centre plants250710
30002400Among the largest sets built for 415 V; very large plants, where 11 kV sets are often preferred250800

Motor figures assume the set is lightly loaded when the motor starts, a transient reactance of about 0.25 per unit and a voltage dip limit of about 15%. Soft starters and VFDs allow larger motors. Sets of 10 kVA and below are often single-phase and suit only small direct-on-line motors. For current, breaker and fuel at each rating, see the full-load current chart, the breaker and cable size chart and the DG fuel consumption chart.

How to use the chart

  1. Add up the loads that must run together during an outage, in kW. Air conditioners use about 1.2 to 1.8 kW per ton when running.
  2. Divide by 0.75 so that the set runs at about 75% of its rating, then divide by 0.8 to get kVA.
  3. Find the largest motor and its starter, and check it against the motor columns.
  4. Take the larger of the two answers and pick the next standard rating up.
  5. Confirm with a load list in the generator size calculator.
kVA needed ≈ running kW ÷ 0.75 ÷ 0.8, then checked against the largest motor start

Worked examples (illustrative)

A villa in Hyderabad

Lights, fans, fridge and electronics about 2 kW, three 1.5-ton ACs about 6 kW, a 1.5 HP borewell pump about 1.1 kW: about 9 kW running. 9 ÷ 0.75 ÷ 0.8 ≈ 15 kVA. The 1.1 kW pump is within the 1.5 kW direct-on-line figure for 15 kVA. A 15 kVA set fits; 20 kVA gives room for a fourth AC.

A 200-flat apartment complex

Common services (lifts, pumps, lighting, STP) about 90 kW running, plus limited backup of about 0.3 kW per flat, 60 kW: about 150 kW. 150 ÷ 0.75 ÷ 0.8 = 250 kVA. The largest motor is a 15 kW pump on direct-on-line start, well inside the 22 kW figure for 250 kVA. A 250 kVA set fits. See generators for apartments and gated communities.

A workshop with a large motor

The running load is only 40 kW, which suggests an 82.5 kVA set. But a 30 kW motor on direct-on-line start needs a 320 kVA set by the motor column. Fitting a star-delta starter brings that down to about 100 kVA, and a soft starter or VFD further still. The starter, not the running load, decides the size here.

Do not choose a generator from the chart alone when the site has large motors, lifts, UPS systems or VFDs. These loads can trip or stall a set that looks big enough on paper. Have the size checked against the actual load list.

Loads that need a larger set than the chart suggests

LoadWhyWhat to do
Direct-on-line motors, pumps and motorsStarting current is 5 to 7 times running currentCheck the motor columns; use star-delta, soft starters or VFDs
UPS and VFD-heavy sitesHarmonic currents heat the alternator and distort the voltageChoose a larger alternator. See non-linear loads
LiftsRepeated starting and regenerative brakingAllow for simultaneous starts and check regeneration
Hot summer afternoonsAC load peaks and engine rating falls in high ambientSize on summer load and check derating. See ambient temperature derating
Fire pumps and life-safety loadsMust run whatever else is onSize for them in full, with no diversity

Signs that a set is the wrong size

Too smallToo large
Lights dip sharply and lifts or drives trip when a large motor startsThe set runs at a small fraction of its rating for most of its hours
Overload or high-temperature alarms on hot afternoonsOily black streaks at the exhaust outlet from wet stacking
Frequency sags and slow recovery after each load stepMore fuel per unit of energy than a correctly loaded set would use
Loads must be shed by hand before the set will take themHigher purchase, service and space requirements than the site needed

Either way, the cure starts with measured load data, not another guess. A week of readings on the incoming supply shows the real running load and its peaks.

Allowing for future load

A building that will add loads within a few years can take a rating one step up, or keep the chosen size and leave space, a foundation and a switchboard connection for a second set. The second route avoids years of light running while the load grows. See stationary generator installations.

Quick sizing worksheet

LoadRunning kWRuns during outage? (yes or no)Starter type
    
    
    
Total running kW, and the largest motor   

Questions buyers ask

How do I measure the real load of my building before sizing?

Log the incoming supply for about a week, covering a hot afternoon and the busiest working hours, and note the peak kW, the steady running kW and the biggest motor starts. Where logging is not possible, list every load that must run during an outage with its kW and starter type, and note which run together.

Should I size a generator for future load?

Allow sensible growth, not every load the building might one day have. Where large additions are firmly planned within a few years, take one rating step up or leave space, a foundation and a switchboard connection for a second set, which avoids years of light running while the load grows.

What size generator do I need for my home?

Add the running kW of what must work during a power cut. A home with three 1.5 ton ACs, a borewell pump, fridge, lights and fans runs at about 9 kW, which needs about a 15 kVA set. Add about 2 kW per extra AC, and check that the pump motor is within the direct on line figure for the chosen rating.

How many ACs can a 25 kVA generator run?

A 25 kVA set carries 20 kW. At about 75% loading that is 15 kW, roughly six or seven efficient 1.5-ton inverter AC units with lights and fans, depending on their efficiency and whether they start together. Older fixed speed ACs draw a high current at each start, so staggering their restart after an outage helps.

What can a 62.5 kVA generator run?

About 50 kW at full rating, so roughly 37 kW of comfortable running load: a branch office, a small nursing home, a supermarket or a small workshop, with direct on line motors up to about 5.5 kW and star delta motors up to about 18.5 kW. Larger motors need a soft starter, a drive or a bigger set.

What size generator is needed for a 100-flat apartment?

For common services such as lifts, pumps, lighting and the sewage plant, plus limited backup to each flat, typically about 125 to 160 kVA. Full backup of every flat air conditioning needs far more. Size from the actual load list, check the largest pump and lift starts, and allow for lifts starting together after an outage.

What is the biggest motor a 125 kVA generator can start?

About 11 kW direct on line with the set lightly loaded, about 37 kW with a star delta starter, and more with a soft starter or a variable frequency drive. If other loads are already running, or the motor drives a heavy load such as a loaded conveyor, the safe figure is lower and the voltage dip should be checked.

Should I choose a bigger generator to be safe?

Only moderately. A set that runs below about 30% load for long periods wastes fuel, builds carbon and suffers wet stacking, and costs more to buy and service. Size for the real running load and the largest motor start with sensible growth, not for every load in the building, and plan a second set if large additions are expected.

Evidence note. Typical uses and motor figures are indicative. Final sizing needs the site’s load list, its largest motors and their starters, and the selected set’s data sheet.