Generator Site Planning Checklist: Clearances, Access, Fuel Delivery and Exhaust Direction

In short. A good generator location is fixed by six things you can measure with a tape and a level, before anything is bought. They are: clear space around the set for service and airflow, a tanker route to a safe fill point, an exhaust outlet well away from windows and intakes at the right height, room for earth pits and short cable routes, a plinth above flood level with drainage, and, on roofs or in basements, structure, access and ventilation. This page gives the dimensions to check and a site-survey sheet to record them.

Who this page is for: architects, MEP consultants, builders, facility managers and site engineers choosing or checking a DG location. The delivery sequence, crane survey, permits and coordination with other trades are covered on our installation planning page; this page is about the space itself.

Key facts

1. Clearances around the set

Outdoor canopy sets

Side Minimum clear space Why
Control-panel and service-door side 1.5 m, plus full door swing Room to stand, open the doors fully, withdraw filters and work on the panel safely
Opposite service side 1.0 m Access to the far side for inspection, cleaning and leak checks
Radiator discharge end 2–3 m clear, or about twice the radiator height Hot air must leave and not recirculate to the intake
Air intake end or sides 1.0–1.5 m Free inflow of cool air; louvres must not face a wall closely
Above the canopy Nothing overhead within about 1 m; clear lifting path Exhaust heat, rain cap, lifting for future replacement
Between two sets At least 1.5 m, and more if both service sides face each other Service access and no hot-air exchange between sets

Indoor generator rooms

2. Fuel: tanker route and fill point

3. Exhaust: direction, height and neighbours

4. Earth pits and cable routes

5. Flood level and drainage

6. Rooftops and basements

Location Must check Common problem
Rooftop or terrace Slab capacity for the set’s wet weight, fuel and plinth, confirmed by the structural engineer. Spring or rubber mounts suited to the slab. Crane access and lift plan. Fuel supply height. Exhaust clearance from the building’s own intakes. Vibration and hum in the rooms below; fuel pump unable to lift from a ground tank
Basement Flood level and pumping. Ducted cooling air in and out. Exhaust route to the required height. Fire separation and fire NOC. Access for replacement. Hot-air recirculation, overheating, flooding; set cannot be removed without breaking a wall
Podium or car-park level Headroom for the exhaust and lifting. Vehicle impact protection. Ventilation to open air. Exhaust discharging into the parking area; no tanker access
Open ground beside the building Distance from windows. Noise towards neighbours. Plinth and drainage. Discharge facing a neighbour’s house; set too close to a bedroom window

Worked example (illustrative): surveying a car-park site for a 320 kVA canopy set

The site. A five-storey commercial building, 15 m high, wants a 320 kVA canopy set in a ground-level car-park corner. The canopy is about 4.2 m long, 1.4 m wide and 2.0 m high.

  1. Footprint with clearances. Length 4.2 + 1.0 (alternator and intake end) + 2.5 (radiator discharge) = 7.7 m. Width 1.4 + 1.5 (panel side) + 1.0 (far side) = 3.9 m. The corner measures 8.5 m × 4.5 m, so it passes, with 0.8 m and 0.6 m to spare.
  2. Radiator discharge. The first layout pointed the discharge at a wall 1.2 m away. Rotating the set 180° sends hot air towards the open car-park aisle, and the intake end now faces the wall, 1.2 m away, which is above the 1.0 m minimum.
  3. Exhaust. H = 15 + 0.2 × √320 = 15 + 0.2 × 17.89 = 15 + 3.58 = 18.6 m. The stack is carried up the building’s rear face to 18.6 m. Its outlet is 4.5 m from the nearest openable window on the top floor, so the 3 m minimum is met. It is also well clear of the rooftop air-handling intake.
  4. Fuel. The tanker parks at the service gate. The measured hose route to the proposed fill box is 22 m, within a typical 30 m hose. The fill box goes on the outer face of the car-park wall, with a bund under the day tank.
  5. Earth pits. Four pits — two body, two neutral — are planned in the landscaped strip beside the car park, using 3 m electrodes spaced 6 m apart, 2 m from the building foundation and clear of the lightning pits.
  6. Flood level. A water mark 0.45 m high is found on the car-park wall from a past downpour. Plinth top = 0.45 + 0.30 = 0.75 m above car-park floor, with a fall to the drain. The cable trench and fill box are raised to match.
  7. Cable. The measured route to the changeover in the ground-floor electrical room is 38 m. That figure goes to the cable sizing and breaker check before the single-line diagram is drawn.

Result: one change, rotating the set, avoided a recirculation problem that would have caused summer overheating trips. Everything else was confirmed with a tape measure in under two hours.

Generator site-survey checklist (dimensioned)

Site Proposed set kVA Set L × W × H (m) Building height h (m) Surveyed by / date
         
Item Target Measured OK (✓/✗) Action
Clearance: panel / door side ≥ 1.5 m + full door swing      
Clearance: opposite side ≥ 1.0 m      
Clearance: radiator discharge ≥ 2–3 m clear, or ducted      
Clearance: intake side ≥ 1.0–1.5 m      
Overhead clearance and lifting path ≥ 1 m; clear lift      
Indoor: inlet opening area ≈ 1.5 × radiator core area      
Indoor: outlet opening area ≈ 1.25 × radiator core area      
Tanker road width / headroom ≥ 3.5 m / ≈ 4 m      
Hose route to fill point Within hose length (15–30 m)      
Fill point: lockable, contained, gauge visible Yes      
Stack height required H = h + 0.2√kVA H = ____ m      
Exhaust outlet to nearest window / door / intake ≥ 3 m      
Exhaust direction away from building and neighbours Yes      
Earth pits: number, electrode length, spacing Separate body / neutral; spacing ≈ 2 × length      
Earth pits: distance from foundation and lightning pits Clear; testable      
Cable route length to changeover Record actual (m)      
Highest flood level observed Record (m)      
Plinth top above flood level ≥ 0.3 m      
Drainage fall and oil interception Yes      
Rooftop: slab capacity confirmed by structural engineer Yes (if applicable)      
Basement: ducted air, pumping, removal route Yes (if applicable)      
Distance to nearest neighbour’s window Record (m)      

Attach: a sketch with north arrow and dimensions, and photographs of the location, the access route, the fill point position, the exhaust route and the earth pit area.

Exceptions and cautions

  • The dimensions here are good-practice minimums for typical sets. The maker’s installation manual, your fire NOC and your consent conditions can require more; follow the largest figure.
  • Large sets and multi-set plants need a full airflow and acoustic design, not rules of thumb. Ducted radiator systems change the clearance rules entirely.
  • Never reduce the radiator discharge clearance by adding a deflector without checking airflow. A badly placed deflector can be worse than the wall.
  • Rooftop installations always need the structural engineer’s written confirmation. A slab that looks thick may not be designed for a concentrated, vibrating load.

Common mistakes

What to send us

Send the proposed set rating, a sketch of the location with dimensions, the building height, and photographs of the space, the access road and the proposed exhaust route. Our service engineers can carry out a site survey, mark out the clearances and fill in this checklist with you. Use the generator sales enquiry, or WhatsApp 98852 01608. We work across Telangana, Andhra Pradesh and every district within about 300 km of Hyderabad, with project support across India.

Questions engineers ask

How much space is needed around a generator?

As a minimum for a canopy set: 1.5 m on the control-panel and door side with full door swing, 1.0 m on the opposite side, 1.0 to 1.5 m at the intake, and 2 to 3 m clear in front of the radiator discharge unless it is ducted.

How far should a generator exhaust be from windows?

At least 3 m from any openable window, door or ventilation intake, measured from the outlet, at a height of at least H = h + 0.2 × √kVA metres, and discharging upward and away from the building.

How big should the ventilation openings be in a generator room?

As a starting point, an inlet of about 1.5 times the radiator core area and an outlet of about 1.25 times, placed so air sweeps across the set. Confirm against the maker’s cooling-air flow for your model.

Where should the fuel fill point be?

Outside the building, within the tanker’s hose reach (typically 15 to 30 m along the actual route), at a lockable fill box with spill containment, a visible level gauge and an overfill warning.

How far apart should earth pits be?

Electrodes should be spaced at least about twice their driven length apart, so about 6 m for 3 m electrodes. Keep neutral and body pits separate, clear of foundations and lightning electrodes, and accessible for testing.

How high should the generator plinth be?

At least 300 mm above the highest flood level recorded at the site, with a drainage fall away from the set. Fill points, vents and cable pits should also be above that level.

Can a generator be installed on a rooftop?

Yes, if the structural engineer confirms the slab for the set’s wet weight and dynamic load, suitable anti-vibration mounts are used, crane access is planned, and fuel supply and exhaust clearances work at that height.

Related pages

Technical content reviewed by D. Srinivas Reddy, Managing Partner and service engineer. Last updated 5 November 2026.