Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Gas Power Systems

Learn how to assess gas power projects in India, from gas availability, pressure and quality to duty, heat recovery, sizing and electrical integration.

In short. A gas power system is a fuel system, engine and heat system working together, not a diesel generator with a different tank. Before selecting a gas genset, confirm that gas reaches the site at the required pressure and flow, that its composition suits the engine, what the operating duty is, and whether the rejected heat can be used. Electrical sizing, protection and transfer remain as demanding as for diesel.

Why gas power is a different engineering problem

With a diesel generator the fuel is a finite liquid stored on site. Autonomy is a tank-sizing exercise and the fuel specification is well defined by IS 1460. With a gas generator the fuel usually arrives through a pipe owned by somebody else, or is produced on site by a biological or industrial process. Its pressure, flow and composition can vary from hour to hour, and the engine is a spark-ignition machine tuned to a narrow fuel envelope. The fuel therefore becomes a primary design input rather than a consumable bought later.

The gas fuel pathways we assess

Each gaseous fuel brings its own supply model, composition and treatment requirement. The pages in this section take each one in turn.

FuelTypical source in IndiaMain engineering concernGuide
Pipeline natural gas (PNG)City gas distribution networks, industrial pipeline connectionsAvailable pressure and flow at the generator inlet, supply continuity during a grid outageNatural gas generators
BiogasDistillery, dairy, poultry, food-processing and STP digestersHydrogen sulphide, moisture and low heating value; sizing to gas yieldBiogas generators
Biomethane and CBGUpgraded biogas, compressed biogas plantsVerifying the upgraded specification against the engine’s natural-gas envelopeBiomethane power
LPG and propaneBulk tanks or cylinder banksVaporisation capacity, storage licensing, butane-rich compositionLPG and propane systems
Dual fuel (diesel plus gas)Existing diesel sets with approved conversion kitsSubstitution rate versus load, knock limits, fallback to full dieselDual-fuel systems
Landfill and sewage gasMunicipal landfills, sewage treatment plantsDeclining and variable yield, siloxanes, halogenated contaminantsLandfill and sewage gas power

Four questions that come before any kVA figure

Is the fuel actually available?

Not in principle, but at the generator inlet, at the minimum dynamic pressure the engine’s fuel train needs, at the maximum flow the engine draws at full load, and for the full operating period, including the days when the process that makes the gas is down.

Is the fuel suitable for the engine?

Methane number, heating value, moisture, hydrogen sulphide, siloxanes and heavier hydrocarbons all affect knock margin, deposits, corrosion, oil life and the output the engine can give. The engine manufacturer publishes the acceptable fuel envelope, and a gas analysis is compared against it before the engine is chosen. Nameplate output is only valid on the reference fuel.

What is the duty?

Gas generation economics change completely between emergency standby, intermittent peak operation, prime power and continuous base load. A gas engine’s higher capital cost per kW is recovered through operating hours, so a set that runs 200 hours a year is judged on a different basis from one running 7000 hours a year.

Can the heat be used?

Roughly 60% of the fuel energy leaves a gas engine as heat. Where the site has a simultaneous need for hot water, steam or chilled water, recovering that heat changes the overall energy case, which is the subject of trigeneration as well as CHP. Where there is no thermal demand, the heat is simply rejected and the comparison is made on electrical efficiency alone.

Fuel demand is an energy requirement

Gas consumption figures copied from one project to another are a common source of error because gas volume depends on reference conditions and heating value. The sound way to estimate fuel demand is from the electrical output and the engine’s efficiency.

V̇ = P / (η × LHV)

Here V̇ is the gas flow in standard cubic metres per hour, P is the electrical output in kW converted to MJ/h by multiplying by 3.6, η is the engine-generator electrical efficiency at that load, and LHV is the lower heating value of the gas in MJ/Sm³. Worked example (illustrative): a 500 kW set at 38% efficiency needs 500 × 3.6 / 0.38 = 4737 MJ/h of fuel. On pipeline gas at about 35 MJ/Sm³ that is roughly 135 Sm³/h; on biogas at about 21 MJ/Sm³ it is roughly 225 Sm³/h for the same output. The efficiency and heating value must be confirmed for the actual engine and gas.

The electrical engineering does not change

A gas genset still has to be sized for the connected load and its transients, protected against faults, earthed correctly and transferred or synchronised safely. If anything the electrical work is more demanding, because spark-ignition lean-burn engines generally accept smaller load steps than a turbocharged diesel of the same rating. The usual generator sizing methods apply unchanged, with the added step of checking the manufacturer’s load acceptance curve against the site’s largest motor starts and UPS behaviour. Grid-parallel and multi-unit gas plants also need synchronising, load sharing and utility interface protection, which is covered under integrated power systems.

Screening a gas power project

Before we recommend a gas solution we establish the application, the electrical load and its profile, the thermal load if any, the expected operating hours, the gas source, a gas analysis, the available pressure and flow, the redundancy required, the grid interface and the site’s emissions consents. With those ten items in hand a project can be screened in a few days. Without them any proposal is a guess about the fuel, and the fuel is the one thing a gas project cannot afford to guess.

Which gas page answers which question

QuestionWhere to look in this section
Is pipeline gas practical for my site?Natural gas generators and behind-the-meter pages
Can I use heat as well as power?CHP, cogeneration and trigeneration pages
Do I have biogas, landfill or sewage gas?Biogas, landfill and sewage gas, and biomethane pages
Can I keep diesel but use some gas?Dual-fuel page
No pipeline, but bottled or bulk gas?LPG and propane page
Large multi-engine plant?Gas engine power plants page

Worked example: screening gas for a factory (illustrative)

A factory runs 3000 hours a year at about 400 kW and has a gas pipeline at its boundary. A gas engine of that size might use around 110 cubic metres of natural gas an hour at full load, so the first checks are whether the network can supply that flow at the required pressure, and whether the site also needs heat.

If it uses hot water or steam for much of those hours, combined heat and power may make the project worthwhile; if not, the comparison is power against grid power alone, and the margin is usually smaller. A standby diesel set is often kept for long gas outages and critical loads.

From screening to a decision

  1. Collect a year of load data, running hours and any heat demand.
  2. Confirm gas availability, flow and pressure with the supplier.
  3. Screen options: gas only, gas with heat recovery, dual fuel or gas with battery.
  4. Check the electrical connection, protection and approvals for the chosen option.
  5. Plan maintenance, monitoring and how savings will be measured.

Where gas power is a poor fit

Gas generation suits long running hours and steady loads. For a standby set that runs a few hours a year, or a site with large, sudden load steps and no battery support, a diesel set is usually simpler and more economical. Knowing this early avoids studying an option that the site pattern cannot support.

Common mistakes

What to send us

Send a one-line description of the application, the electrical load list or a recent maximum demand record, the expected monthly operating hours and the gas source with any analysis or supplier specification you hold. Add the available gas pressure at the site boundary, any thermal loads such as boiler or chiller capacity, and photos of the proposed installation area. If you already own diesel sets, include their nameplate photos so that a dual-fuel route can be considered alongside new gas engines. Use the application engineering enquiry and we will come back with a screening and a list of what remains to be confirmed.

Questions engineers ask

How do I know which gas power page applies to my site?

Match the page to your fuel and need: natural gas and behind-the-meter pages for pipeline gas, CHP and trigeneration if heat is useful, biogas, landfill and biomethane pages for waste gases, dual fuel to keep diesel, LPG for bottled gas, and power plants for multi-engine schemes.

What are the first checks when screening gas power for a factory?

Whether the network can supply the required gas flow at the right pressure, and whether the site can use heat. In the illustrative factory running 3000 hours a year at 400 kW, heat use decides whether CHP is worthwhile, with diesel kept for critical loads.

What steps lead from gas screening to a decision?

Collect a year of load, hours and heat data; confirm gas flow and pressure with the supplier; screen gas, CHP, dual fuel and gas with battery; check connection, protection and approvals; and plan maintenance, monitoring and how savings will be measured. Each step narrows the options, so the final choice rests on site data rather than assumption.

When is gas power a poor choice?

For standby sets running a few hours a year, or sites with large sudden load steps and no battery support. Gas engines suit long hours and steady load, so in those cases a diesel set is usually simpler and more economical. A screening study shows this early, before design money is spent.

Is a gas generator cheaper to run than a diesel generator?

Often, but not always. Gas engines have a lower fuel cost per kWh when pipeline gas is priced competitively and the set runs long hours, but they cost more per kW to buy, usually give less output per litre of engine displacement and need more frequent spark plug and valve attention. Run the comparison per kWh over the real annual operating hours rather than on fuel price alone.

Can a gas generator be used for emergency standby in India?

Yes, where the gas supply is dependable and the engine’s start and load-acceptance performance meets the site’s requirement. Most critical sites in Hyderabad still keep diesel as the primary standby source because the fuel is stored on site, and use gas for prime or CHP duty. The decision rests on the supply security analysis for the specific gas connection.

Do gas generators need CPCB approval?

Gensets sold in India are type approved against CPCB norms that cover diesel, gas and dual-fuel engines, and the operator still needs consent from the state pollution control board for installation and operation above the exempted sizes. Gas engines generally meet particulate limits easily, but oxides of nitrogen and carbon monoxide must be demonstrated for the certified configuration.

How much gas pressure does a generator need?

It depends entirely on the engine’s fuel train. Some small spark-ignition engines accept low pressure of a few tens of millibar, while larger lean-burn engines with electronic gas admission need higher regulated pressure. Take the figure from the manufacturer’s installation manual and verify that the site regulator can hold it at full flow with other consumers running.

Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 19 October 2026.