In short. A UPS gives zero-break power for minutes; a battery inverter gives power for a few hours with a short break at changeover; a generator gives power for as long as it has fuel, after a gap of seconds to minutes while it starts. Most serious installations combine them: a UPS for equipment that must never stop, and a generator for everything else and for long outages. The right choice depends on outage length, how much power you need, and what happens if supply breaks for even a moment.
Who this page is for: For homes, shops, offices, clinics and plants: decide which backup — or which combination — matches how long your outages last and how sensitive your equipment is.
Key facts
- In this page, “inverter” means a battery home or office inverter that stores grid power. An inverter generator is a fuel-burning generator — see our 1500 vs 3,000 rpm page.
- Battery systems are limited by stored energy: kWh, not kW, decides how long they last.
- Generators are limited by fuel and by starting time, not by stored energy.
- Equipment such as servers, medical devices and PLCs usually cannot tolerate even a short break — that is the UPS’s job.
What each one is
- Online UPS — the load is always fed through the UPS’s inverter from its DC bus, so a power cut causes no break at all. Batteries are sized for minutes, typically until a generator takes over.
- Battery inverter (home or office) — charges batteries from the grid and switches to them when the grid fails, usually with a brief changeover. Suits lights, fans, computers and small appliances for a few hours.
- Diesel generator (DG set) — an engine-driven alternator. Starts automatically with an AMF panel or by hand, and runs for as long as it has fuel. Carries large loads including motors, pumps, lifts and air-conditioning.
Decision matrix
| Online UPS | Battery inverter | Diesel generator | |
|---|---|---|---|
| Break when grid fails | None | Brief (milliseconds) | Seconds to minutes while it starts |
| Typical backup time | Minutes (more with extra batteries) | A few hours | As long as fuel lasts |
| Typical capacity | From under 1 kVA to very large systems | Small — household and small office | From about 15 kVA to multi-megawatt |
| Motors, pumps, lifts, AC | Not its role | Small loads only | Yes, sized for starting |
| Power quality | Excellent, conditioned | Depends on model (sine-wave preferred) | Good when correctly sized and maintained |
| Running cost | Electricity plus battery replacement | Electricity plus battery replacement | Fuel, servicing |
| Installation needs | Indoor, ventilated battery space | Indoor, small | Outdoor or ventilated room, fuel storage, exhaust, earthing, approvals |
| Noise and emissions | None | None | Yes — acoustic canopy and emission-compliant engine |
Common combinations
| Site | Typical arrangement |
|---|---|
| Home with short, occasional cuts | Battery inverter |
| Home or villa with long cuts, pumps and AC | Generator with automatic changeover; inverter optional for zero-gap lighting |
| Shop or small office | Small UPS for computers and billing; generator for everything else |
| Clinic, bank branch, data room | Online UPS for critical equipment + generator with AMF panel |
| Apartment complex | Generator for lifts, pumps and common areas; residents’ own inverters |
| Factory | Generator(s) for plant; UPS for controls, PLCs and servers |
Worked example (illustrative)
Illustrative figures. A clinic needs: diagnostic equipment and computers 4 kW (must not stop), lighting and fans 3 kW, two 1.5-ton ACs about 3.2 kW, and a 2 HP water pump. Outages last up to 6 hours.
- Battery-only backup for 6 hours of all loads: about (4 + 3 + 3.2 + 1.5) kW × 6 h ≈ 70 kWh of usable storage — large and costly, and the pump and ACs need high starting current.
- Better: a UPS for the 4 kW critical load, with batteries for perhaps 15–30 minutes, plus a generator with AMF panel for the whole clinic. The generator is sized for all loads together and the AC and pump starting surge.
Equipment-requirement worksheet
| Item | Your site |
|---|---|
| Loads that must not stop even for a moment (kW) | |
| Other loads you want backed up (kW) | |
| Motors, pumps, lifts, ACs (sizes and starters) | |
| Typical outage length (h) | |
| Longest outage in the last year (h) | |
| Outages per month | |
| Space indoors / outdoors | |
| Noise limits or neighbours | |
| Who will operate and maintain it? |
When the usual assumptions fail
- “A big inverter replaces a generator.” Only for short outages and light loads; long outages need fuel, not batteries.
- “A generator protects my computers.” Not during the seconds it takes to start — that gap needs a UPS.
- Battery backup and solar. Large battery systems with solar can cover more, but are sized by stored energy and recharge, which is a separate design exercise.
Sizing battery capacity: the arithmetic
A battery inverter or UPS is sized twice: once in power (VA or kW — what it can deliver at any instant) and once in energy (battery Ah at a given voltage — how long it can deliver it). Most disappointment comes from the second.
- Inverter efficiency: typically 0.80–0.90 for home and office inverters at mid load; lower at very light load.
- Usable depth of discharge: lead-acid batteries last far longer if they are not fully emptied; a design figure of about 0.5–0.7 is common. Lithium systems usually allow more.
- Ageing allowance: a battery near the end of its useful life typically holds about 80% of its rated capacity, so design for that, not for the new battery.
- Discharge rate: rated Ah are quoted at a slow discharge, often over 10 or 20 hours. Drawn faster, the same battery delivers fewer Ah.
Example of the formula: 600 W for 4 hours on a 24 V bank, at 0.85 efficiency, 0.7 depth of discharge and 0.8 ageing gives 2,400 ÷ (24 × 0.85 × 0.7 × 0.8) ≈ 210 Ah — so the next battery size up, not a nominal “150 Ah” chosen by habit.
Runtime and recharge: the half most people forget
A battery is only useful if it is full when the next outage arrives. Recharge takes much longer than discharge, because chargers are deliberately limited — commonly to around a tenth of the battery’s Ah rating in amps — and lead-acid batteries need roughly 10–20% more charge put back than was taken out, plus a slow final absorption stage.
Illustrative case. A small office runs 1.2 kW on an inverter with a 48 V, 150 Ah bank (four 12 V batteries in series), 0.88 efficiency, 0.7 usable depth of discharge.
Delivered to load = 5,040 × 0.88 ≈ 4,435 Wh → 4,435 ÷ 1,200 ≈ 3.7 h (new battery)
Ageing battery at 80%: 3.7 × 0.8 ≈ 3.0 h
Recharge after a discharge to the full usable depth (about 3.7 hours on a new bank): the bank gave up 150 × 0.7 = 105 Ah. With a 20% charging allowance it needs about 126 Ah back. A 15 A charger (one tenth of 150 Ah) takes 126 ÷ 15 ≈ 8.4 hours, before the final top-up stage.
So if this office has a 3-hour cut in the afternoon and another at 7 pm, the battery starts the evening outage perhaps half full and runs out after about an hour and a half. On sites with more than one long outage a day, energy storage alone is rarely enough; a generator either carries the load or recharges the batteries between outages.
Recharging batteries from a generator
- Count the charger as load. When the DG takes over, the inverter or UPS feeds its output load and starts recharging. In the case above that is 1.2 kW of load plus roughly 15 A × 56 V ≈ 0.84 kW of charging, about 0.95 kW at the input after charger losses — over 2 kW together.
- Charging is a non-linear load. Rectifier chargers draw distorted current. Small sets running close to their rating with a large charger may show voltage distortion and unstable inverter behaviour.
- Input window. Many inverters reject a supply whose frequency or voltage wanders, and stay on battery while the DG runs. Most offer a wide-input or generator setting; it needs to be selected.
- Running hours. If the generator runs only for the outage, the batteries may still be part-charged when mains returns. That is acceptable only if mains stays on long enough to finish the job.
Indian conditions: heat, outage patterns and batteries
As a typical rule of thumb, lead-acid battery life roughly halves for every 8–10 °C of sustained temperature above 25 °C. A battery rack in a closed staircase cupboard that sits at 38–40 °C through April and May may reach the end of its life in about half the years printed on its label. Batteries need a shaded, ventilated position away from the inverter’s own heat. Frequent evening outages also mean frequent partial charge, which shortens lead-acid life further; a monthly full charge on a long mains day helps.
Battery-system health checklist
Simple checks that non-technical staff can do safely, with the inverter left switched on and no covers removed:
- Inverter display shows “mains” and “charging” or “full” — not a fault or overload warning
- Runtime in the last outage noted, and compared with the same month last year
- Battery area cool, dry, ventilated and free of stored items
- No swelling, cracking, white or green deposits at terminals, or acid smell (if seen, keep clear and call a technician)
- For flooded batteries, electrolyte level checked by a trained person using distilled water only
- Inverter cooling vents clear of dust and cloth covers
- Generator-mode or wide-input setting confirmed by the installer if the inverter or UPS is fed by a DG
- Battery installation date written on the rack
Decision table: outage pattern and recharge window
| Outage pattern | Recharge window | Practical choice |
|---|---|---|
| One short cut a day (under 1 h) | Long | Battery inverter, or UPS for sensitive loads |
| One cut of 2–4 h a day | Long (over 12 h) | Battery inverter sized for the runtime, if loads are light; otherwise generator |
| Two or more cuts of 2 h or longer a day | Short | Generator for the main load; UPS only for zero-break equipment |
| Rare but very long cuts (half a day or more) | Irrelevant — energy runs out first | Generator, with UPS for critical loads |
| Large motor, pump or AC loads in any pattern | — | Generator sized for starting current |
For deeper runtime engineering of large UPS battery banks, see UPS battery autonomy and runtime engineering.
Common mistakes
- Sizing an inverter by its VA rating without checking battery hours at the real load.
- Expecting a generator alone to give a break-free supply to computers and servers.
- Putting air conditioners or motors on a home inverter that cannot handle their starting surge.
- Choosing only on purchase price without counting fuel, battery replacement and maintenance.
What to send us
Send the list of equipment you want backed up, how long outages usually last, whether a short break is acceptable, and whether you need single- or three-phase power. Use the application engineering enquiry, or WhatsApp the details and photographs.
Questions buyers ask
Which is better, a generator or an inverter?
It depends on outage length and load. Inverters suit short outages and light loads. Generators suit long outages and heavy loads such as pumps, lifts and air-conditioning.
Do I need a UPS if I have a generator?
If you have equipment that cannot tolerate even a few seconds without power — servers, medical devices, controls — yes. The UPS bridges the gap while the generator starts.
How long can a UPS run without a generator?
Usually minutes, depending on battery size and load. UPS batteries are normally sized to cover the time until a generator takes over.
Can an inverter run air-conditioners and pumps?
Small inverters generally cannot handle the starting current and energy demand of ACs and pumps for long. A generator is usually the practical choice for these loads.
Related pages
Technical content reviewed by D. Srinivas Reddy, Managing Partner and service engineer. Last updated 3 November 2026.