In short. The vision of Reddy Generators is that every customer in Hyderabad, Telangana and Andhra Pradesh who needs backup or temporary power should reach a well-defined technical decision before money is spent. The mission follows from that: start with the requirement, explain the engineering in plain terms, treat the generator as one part of a power system, plan for its whole life, and publish only what can be supported by evidence.
The problem we want to solve
Generator buying in India is often reduced to two numbers: kVA and price. A customer asks for a 125 kVA set, receives three quotations for 125 kVA sets, and chooses the cheapest. Nobody checked whether the 125 kVA figure came from a measured load, a transformer rating, a neighbour’s recommendation or the last set that was installed. Months later the set trips when the chiller starts, or runs at 20% load for years and wet-stacks, or the UPS refuses to synchronise to it.
None of those outcomes is caused by a bad generator. They are caused by an undefined requirement. Our vision is to make power decisions better informed, not to make generator buying more complicated.
Our vision
We want Reddy Generators to be the place where a plant engineer, facility manager, project consultant or business owner moves from an uncertain requirement to a decision they can defend. That means a customer should be able to understand the following points with our help.
- what the load actually is, and which parts of it must stay on;
- why a particular rating, duty class and configuration fits that load;
- how the generator, transfer panel, protection and distribution will work together;
- what can go wrong, and what has been done to prevent it;
- which facts are verified and which still need confirmation;
- what the next sensible step is.
The engineering guides in the Power Engineering Centre are one expression of this. They are written so that a customer can prepare better information before a conversation, not to replace that conversation.
Our mission in six commitments
| Commitment | What it means in practice |
|---|---|
| Start with the requirement | Understand the operation, its load and the cost of an outage before recommending equipment |
| Make engineering understandable | Explain sizing, transient response, derating and fuel autonomy in terms a buyer can act on |
| Treat power as a system | Consider generation, controls, changeover, protection, earthing, cabling and load behaviour together |
| Think across the lifecycle | Plan installation, operation, maintenance, overhaul and eventual replacement at the start |
| Control claims | State only what records, data and tests support, and mark what is still to be verified |
| Build useful tools | Develop calculators and checklists that help customers prepare accurate technical information |
Why sizing illustrates the whole mission
Sizing is where an undefined requirement does the most damage, so it is a good test of whether the mission is being followed. The basic relationship between real and apparent power is simple.
kVA = kW / PF
Here kW is the real power the load consumes, PF is the load power factor, and kVA is the apparent power the generator must supply. Generator sets in India are usually rated in kVA at 0.8 power factor.
(illustrative) A factory schedules 100 kW of running load at a measured power factor of 0.8, giving 125 kVA. A typical standby margin of 15 to 25% suggests a set of roughly 145 to 160 kVA. But if the largest single load is a 37 kW motor started direct on line, its starting current may be six to seven times its running current, and the voltage dip on a 160 kVA set may be unacceptable.
The defensible answer may then be a soft starter on the motor rather than a larger generator. A mission that begins with the requirement finds that answer; a quotation that begins with a kVA number does not. The method is set out in Generator Sizing.
The outcomes we measure ourselves by
We judge the vision by practical results rather than slogans: better load information arriving with enquiries, fewer sets bought too large or too small, fewer transfer failures on commissioning, maintenance planned rather than reactive, and commercial conversations in which the scope, exclusions and assumptions are written down. Where a customer goes elsewhere but with a clearer requirement, the mission has still done its job. Our wider context is in Who We Are.
The mission in practice: what a customer actually sees
| Commitment | What it looks like on a real job |
|---|---|
| Start with the requirement | The first questions are about what must keep running and for how long, before any rating is mentioned |
| Explain in plain terms | The proposal shows how the rating was reached, in figures a non-engineer can follow |
| Treat the set as part of a system | The changeover, cabling, earthing, air path and the largest motor start are part of the answer, not afterthoughts |
| Plan for the whole life | Service intervals, load testing and the generator file are agreed at handover |
| Publish only what can be supported | Figures are ranges where makes differ, examples are marked illustrative, and business claims are stated exactly |
| Recommend what the load needs | A smaller or refurbished set, or no new set at all, when that is the right answer |
Worked example: turning a 125 kVA request into a defined requirement (illustrative)
A workshop asks for a 125 kVA set because its neighbour has one. A short review produces the facts that should have come first.
| Question | Finding | Effect on the answer |
|---|---|---|
| What must run during an outage? | Machines, lighting and a 22 kW pump; not the canteen or the offices | The load is smaller than the building’s connected load |
| What is the running load? | About 70 kW measured over a busy week | 70 ÷ 0.75 ÷ 0.8 gives about 117 kVA, so 125 kVA is the right band |
| What is the hardest moment? | The 22 kW pump starting direct on line with the machines running | Too large a start for 125 kVA; a star-delta starter brings it within the set’s capability |
| How many hours a year? | Long daily outages in summer | A prime rating, and fuel planning for the daily hours |
The rating did not change, but the answer did: a prime-rated 125 kVA set with a star-delta starter on the pump and a fuel plan, instead of a standby set that would have tripped on the first summer afternoon. That difference is the whole mission in one job.
The decisions this approach helps customers make
- Whether to buy, hire, refurbish or repair, and what each means over the life of the set.
- Which loads truly need standby power, and which can wait for the grid.
- Whether one set or two, and what redundancy is worth to the business.
- What to test at handover, and how to prove the set is ready every month after.
- When an older set should be replaced rather than repaired again.
Each of these is easier with the facts in front of everyone, which is why the requirement comes first.
Why the mission insists on evidence
A generator is bought on trust and proved only on the day the grid fails. Between those two moments, the customer has only what the supplier said. That is why every claim on this site is held to the same test: could a customer check it? Ratings come with their basis, fuel figures with the load they apply to and the range across makes, examples are labelled as illustrative, and business facts such as dates, sites and numbers of sets are stated exactly as they happened. Where something cannot be verified, it is left out rather than softened. Saying less, and being able to stand behind all of it, is a better foundation for a long relationship than saying more.
The long view
A diesel set installed today may run for twenty years or more. Over that time the building changes, loads are added, emission rules tighten, batteries and solar arrive, and the people who chose the set move on.
The mission is written for that long view: decisions recorded so they can be revisited, sets maintained to a fixed standard so their condition is known, and advice that looks at what the site will need next, not only what it needs today. When a set reaches the end of its useful life, the same approach decides whether to rebuild, replace or take it in part exchange against something better suited to the site as it now is.
That is what success looks like against this mission: not the number of sets sold, but the number of sites that started on the day it mattered, the decisions customers could explain to their own management, and the relationships that lasted because the first answer was the honest one.
Common mistakes
- Treating the kVA on an old quotation as the requirement, which repeats any error in the original sizing for another fifteen years.
- Comparing suppliers on set price while panels, cabling and installation are left undefined, which makes the cheapest offer look cheapest only on paper.
- Selecting a set without considering how it will be maintained in a remote location, which turns a reliable machine into an unreliable installation.
- Accepting performance claims without asking what test or data supports them, which leaves no recourse when the set does not perform.
What to send us
If you want to put the mission to work on a real requirement, send the site location, a load list or the main DB readings, the loads that must stay on during an outage, and the expected outage duration. Photos of any existing generator and changeover panel help. Start with the application engineering enquiry and we will work through the requirement with you.
Questions engineers ask
What does an engineering-led generator supplier do differently?
It starts with what must keep running and for how long, measures or lists the load, checks the largest motor start and the site conditions, and only then names a rating, with the reasoning written down. It treats the changeover, cabling, air path and maintenance as part of the answer, and it will recommend a smaller, refurbished or rented set when that suits the load better.
Can the right answer be a refurbished generator instead of a new one?
Often, especially for standby duty on a reliable supply with few running hours. A refurbished set from Reddy Generators is partly or fully rebuilt, load-bank tested and covered by a six-month warranty with stated exclusions. For long daily running, fuel and wear dominate the cost over the years, so a new set or a refurbished one at prime rating is usually the better fit.
Does an engineering-led approach make the purchase slower?
It adds a short definition step at the start, usually a load review and a few questions about duty and site. That step typically removes the delays that come later from wrong sizing, missing scope or a failed commissioning test. For a small set it may be a single conversation; for a large one, a measured load study over a few days.
Will you recommend a smaller generator if the load does not need the size I asked for?
Yes. If the measured or scheduled load supports a smaller set, we say so and show the calculation. Oversizing is not a safe default for diesel sets, because long periods at light load cause carbon build-up and higher fuel cost per kWh. A smaller set that is well loaded is cheaper to buy, to run and to keep healthy.
Do you publish typical figures such as fuel consumption or sizing margins?
We publish standard engineering ranges and mark them as illustrative. For a specific set, the data sheet of the maker at the relevant load governs, and we use that in any proposal. Where makes differ, figures are given as ranges checked against published maker data, so that a reader can see the spread rather than one number.
Why does the mission mention controlling claims?
Because the trade is full of uncheckable statements about uptime, certifications and capability. We would rather state less and be able to support all of it. Business facts on this site, such as dates, sites and numbers of sets, are stated exactly as they happened, and anything that cannot be verified is left out rather than softened.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 19 October 2026.