In short. A generator AMC (annual maintenance contract) is priced per set per year, and the figure moves with five things: the kVA rating, how many visits a year, whether consumables and parts are inside or outside the contract, the distance to your site, and how critical the set is to your operation. A fair comparison between two AMC quotations starts with what each visit actually contains — not with the annual total. Send your set’s make, kVA and district to WhatsApp 98852 01608 and you will have an itemised AMC quotation.
What an AMC actually buys
Scheduled preventive visits — inspection, oil and filter work per the service schedule, battery and charger checks, load run, and a written report after each visit; priority breakdown response between visits; and one accountable service engineer who knows your machine’s history. The alternative, calling for service only when the set fails, always looks cheaper until the failure happens during the outage the set existed for. Standby sets fail from neglect far more often than from use.
The five things that set the AMC price
- Rating. A 500 kVA service visit takes more time, more oil and bigger filters than a 30 kVA one; the contract scales accordingly.
- Visit frequency. Quarterly suits most standby duty; monthly suits prime-duty and critical sets; some contracts add monsoon-readiness checks. More visits, more cost, fewer surprises.
- Parts basis. A labour-only AMC bills consumables and parts as used; a comprehensive AMC folds defined consumables in. Comprehensive costs more per year and removes argument per visit — pick by how you prefer to budget.
- Location. Visits inside Hyderabad–Secunderabad price lowest; district sites carry travel. We run AMC routes across Telangana and AP, so route density often softens distance for common areas.
- Criticality. A hospital theatre set or substation fire-pump engine carries tighter response commitments than a shop standby — the commitment, not the visit, is what prices.
How to compare two AMC quotations
Ask both for: visits per year and the checklist per visit; what consumables are included; breakdown response time in writing; whether load testing is in scope; parts pricing basis for repairs; and who actually attends — employed engineers or subcontractors. Our contracts run on our own 20-plus engineers and technicians, the same team that has maintained generators, voltage regulators and fire-fighting pump engines at nearly 50 TS TRANSCO substations since 2018 — references available on request.
Any make, any history
We contract all major makes — Kirloskar, Cummins, Mahindra, Ashok Leyland, Perkins, Caterpillar, Eicher, Escorts, MTU and others — including sets bought elsewhere and sets with a gap in their service history. A neglected set starts with a condition survey and a load test, so the contract begins from known health rather than hope; see load-bank testing.
What each AMC visit should contain
Two contracts with the same number of visits can deliver very different care. Comparing what happens at each visit is the only fair way to compare them.
| Visit | Work that should be listed |
|---|---|
| Routine inspection visit | Levels of oil, coolant and fuel; leaks; belts and hoses; battery voltage and terminals; charger; air filter indicator; water drained from the fuel separator; a run with readings recorded |
| Service visit | Engine oil and filters, fuel filters, air filter by its indicator, coolant checked, radiator face cleaned, and a run on load after the service |
| Yearly visit | Coolant replaced, load bank or real-load test, insulation test on the alternator, earth test, AMF panel and changeover checked by a simulated mains failure |
| Breakdown visit between schedules | Diagnosis, repair or a plan for repair, and a report of the cause and the parts used |
Every visit should leave a written report with the readings taken, the work done, the parts fitted and anything that needs attention, so the condition of the set is on record rather than in someone’s memory.
Three ways to set the parts basis
| Basis | Inside the contract | Billed separately | Usually suits |
|---|---|---|---|
| Labour only | Visits, inspection, servicing labour, reports | Oil, filters, coolant and all parts | A single light-duty standby set with an owner who wants to approve each part |
| Labour and consumables | Visits, labour, oil, filters and coolant at the scheduled changes | Repair parts such as batteries, sensors, belts and engine components | Most standby sets, where the scheduled consumables are predictable |
| Comprehensive | Visits, labour, consumables and named repair parts, within stated exclusions | Excluded items, such as damage from poor fuel or overloading | Fleets and critical sites that want a predictable year |
The exclusions matter as much as the inclusions; a comprehensive contract that excludes most likely failures is not comprehensive.
Running hours change what the contract has to cover (illustrative)
Oil and filters are changed every 250 to 500 running hours or six months, whichever comes first. That one rule makes the workload of a contract follow the duty of the set.
| Duty | Running hours a year | Oil and filter changes a year | Why |
|---|---|---|---|
| Standby on a reliable supply | About 100 | 2 | The six-month limit comes first |
| Standby on a weak supply | About 600 | 2 to 3 | Hours and calendar arrive at a similar pace |
| Daily outages of a few hours | About 1500 | 3 to 6 | Hours decide the interval |
| Prime power, long daily running | About 3000 | 6 to 12 | Hours decide the interval, with closer attention to wear |
A contract quoted without asking how many hours the set runs cannot be priced fairly, which is why the hour meter reading and the outage pattern belong in every AMC enquiry. Coolant is replaced every year whatever the hours.
What a fair AMC quotation lists
- The set covered: make, model, kVA, serial number and location.
- The number and type of visits, with what each contains.
- The parts basis, with inclusions and exclusions named.
- How breakdowns between visits are handled and how quickly attendance is arranged, written in the agreement.
- The yearly load test and the changeover test.
- The report left after each visit, and who receives it.
- The contract period and how it renews.
With those items in writing, two quotations can be compared on what they deliver rather than on a single annual figure.
Starting a contract on a set with an unknown history
When an AMC begins on a set that someone else installed or serviced, the first visit is a condition survey and a load test. It records the hours, the state of the batteries, hoses, belts, coolant and fuel, any leaks or alarms, and how the set performs on load. Faults found at that visit are quoted for separately, so the contract starts from a known baseline and neither side is surprised by a problem that existed before it began.
The cost that does not appear on a quotation
The real comparison is not between two contract figures but between a maintained set and an unmaintained one. A standby set that fails during an outage costs whatever the outage costs the business: lost production, spoiled stock, stopped lifts and pumps, an IT system down. A contract that keeps the batteries charged, the fuel clean, the hoses sound and the changeover tested is priced against that risk, not against the hours the set happens to run.
Contracts for several sets
Banks, insurers, telecom operators, schools and substations often have sets at many sites. A fleet contract works best when every set is listed with its make, rating, location and hours, the visit schedule is planned by route so that nearby sites are served on the same trip, and the reports are collected in one register where the owner can see every set’s condition at a glance.
Sets that run long hours are flagged for closer attention, and sets that never run on load are flagged for a load test, because a set that only ever starts is not proved. The same register shows which sets are reaching the end of their useful life, so replacement can be planned instead of forced by a failure.
What to send for an AMC quotation
For each set: make, model and kVA; the hour meter reading; the year of installation if known; the site address; how often it runs and for how long; the last service date; and photographs of the nameplates and the set. With those, the visit schedule, the parts basis and the workload can be matched to the real duty of the set, and the quotation can be itemised rather than estimated.
At renewal: reading the year that has passed
Renewal is the moment to look back at the reports. How many times did the set run on load, and did every start succeed? Which parts were replaced, and did any fail twice? Did the hours match what the contract assumed? Were the batteries, hoses and coolant replaced on time? A year of honest reports answers these in minutes, and the next contract can then be shaped to the set as it really is, with more attention where the record shows weakness and no cost added where the set has proved reliable.
Get your AMC figure
Send the make, kVA, approximate running hours, site district, and how critical the set is, to WhatsApp 98852 01608 or the enquiry form. You will get visit schedule, scope and price itemised — and if the set first needs repair rather than a contract, we will say exactly that. Full service details on the AMC service page.
Questions owners ask about AMC cost
How many service visits does a generator AMC include?
It depends on the duty and the contract. Most standby sets need routine inspection visits through the year, a service visit at least every six months for oil and filters, and a yearly visit with coolant replacement and a load test. Sets that run long hours need more service visits, because oil and filters are changed every 250 to 500 running hours.
How do running hours affect a generator AMC?
Oil and filters are changed every 250 to 500 running hours or six months, whichever comes first. A standby set running about 100 hours a year needs two changes, while a prime power set running about 3000 hours needs six to twelve. The workload, the consumables and the attention to wear all follow the hours, so the hour meter reading belongs in every AMC enquiry.
How much does a generator AMC cost per year?
It scales with kVA, visit frequency, parts basis, distance, running hours and criticality, so a single flat number would be wrong for most sets. Send the make, kVA, hour meter reading and district on WhatsApp 98852 01608 for an itemised quotation that lists what each visit contains, what is included and what is billed separately.
Is an AMC worth it for a standby generator that rarely runs?
Especially for that one. Standby sets die of neglect, with flat batteries, stale fuel and perished hoses, and the failure is discovered during a power cut. Scheduled visits exist precisely for machines that sit: they keep the batteries charged, the fuel dry, the oil fresh at six months and the changeover tested, so the set starts when it is needed.
Labour-only or comprehensive — which AMC is better?
Labour-only budgets lower and bills parts as used; comprehensive costs more and makes the year predictable. Fleets and critical sites usually prefer comprehensive; single light-duty sets often run labour-only well. A middle basis that includes the scheduled oil, filters and coolant suits many standby sets, and the exclusions decide how comprehensive a contract really is.
Do you take AMCs for generators you did not sell?
Yes, any make and any seller. We begin with a condition survey and a load test so both sides know the starting health of the machine. Faults found at that first visit are quoted for separately, so the contract begins from a known baseline and nobody is surprised by a problem that existed before it started.
Does the AMC cover breakdowns between visits?
Priority response is part of the contract; repair parts are billed according to the parts basis of the contract. Response commitments are written into the agreement, not promised verbally. Each breakdown visit ends with a report of the cause found and the parts used, which goes into the same record as the scheduled visits.
Technical content reviewed by D. Srinivas Reddy, Managing Partner and Service Engineer, Reddy Generators. Last updated 1 November 2026.