Reddy GeneratorsREDDY GENERATORSThe dependable power professionals

Electrical Problem to Required Engineering Study Selection Guide

Match an electrical problem, such as tripping, overheating, voltage dips, faults, capacity limits or expansion plans, to the engineering study that finds the cause and the data you need.

In short. Different electrical problems need different studies. Choosing the right one saves time and money. Start from the symptom or the project question, find the study in the table, and gather the data it needs.

Problem-to-study table

Problem or questionStudyPage
Adding load or a new generator; is capacity enough?Load list, demand and generator sizing; load flowload flow
Breaker ratings uncertain; adding sourcesShort-circuit studyshort-circuit
Wrong breaker trips; blackouts from small faultsProtection coordinationcoordination
Safety of work on live gear; labelsArc-flash studyarc-flash
Voltage drops or motor start problemsCable and voltage-drop; motor-starting studymotor starting
Generator stalls or trips on large startLarge motor starting on diesel generatorlarge-motor starting
Transformer energisation tripsInrush studyenergisation
Hot equipment, resonance, distortionHarmonic studyharmonics
Low power factor, high chargesReactive power studyreactive power
Unbalanced voltages; motor heatingUnbalance studyunbalance
Earthing, touch voltage questionsEarthing studyearthing
Lightning and surge damageLightning and surge risksurge risk
Parallel generators or utility parallelingSynchronising and interconnection studyparalleling
Which loads to protect and howCritical-load classificationclassification
Reliability and redundancy decisionsReliability, FMEA, SPOFFMEA
Future growth or brownfield upgradeCapacity expansion; brownfield studybrownfield

Data most studies need

Order of studies

  1. Validate inputs and the single-line diagram.
  2. Load flow and short-circuit.
  3. Protection coordination and arc-flash.
  4. Specialised studies: motor starting, harmonics, transients, reliability.

See study inputs, assumptions and validation.

When you are not sure

If the problem is vague, begin with measurement: a power-quality recording and a walk-through of the single-line diagram often indicates the right study quickly.

Problem to study

ProblemStudyGuide
What size generator?Load list, demand, sizing, transientgenerator sizing
Motor start dips voltageMotor-starting studymotor-starting studies
Breaker rating questionsShort-circuit studyshort-circuit study
Unexpected tripsCoordination studycoordination workflow
Arc-flash labels neededArc-flash studyarc-flash study
Harmonic distortionHarmonic studyharmonic studies
Low power factorReactive power studyreactive power studies
Parallel with the gridInterconnection studyinterconnection
Need to prove uptimeReliability and FMEAreliability
Old plant, uncertain recordsBrownfield studybrownfield

How to proceed

  1. State the problem in one sentence with the evidence.
  2. Choose the study from the table.
  3. Collect the data it needs.
  4. Agree acceptance criteria before the study runs.

For scoping help, use the application engineering enquiry.

Common mistakes

What to send us

Send a short description of the problem, single-line diagram and any recordings. Send your application details.

Questions engineers ask

Which study should I do first?

Validate the diagram and data, then load flow and short-circuit as the base for the rest.

Do I need all of these?

No. Choose by the problem. Many sites need only a few.

How accurate must the data be?

As accurate as the decision requires. Studies are only as good as their inputs.

Can studies be done for an existing site?

Yes, with a survey to verify the as-built system.

This guide gives general principles. Study scope should be defined for your project.

CallWhatsAppEnquire